• Title/Summary/Keyword: Ballasting time

Search Result 10, Processing Time 0.027 seconds

A Study on the Difference in Ballasting Time Arising from the Installation of an Ultraviolet Ballast Water Management System on Existing Ships (현존선에 자외선 평형수처리장치 설치로 인한 평형수 처리시간 변화에 관한 연구)

  • Seo, Kil-Cheon;Lee, Kyoung-Woo;Rho, Beom-Seok;Cho, Ik-Soon;Lee, Won-Ju;Pham, Van Chien;Choi, Jae-Hyuk
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.26 no.5
    • /
    • pp.576-585
    • /
    • 2020
  • This study quantitatively investigated the increase in ballasting time through numerical calculations when an ultraviolet (UV) ballast water management system (BWMS) is installed on an existing vessel. The calculation results indicate that the ballasting time of a gas carrier having 55,000 dead weight tonnage was 2.152 hours without installation of the UV BWMS and implementation of a flow control function. Ballasting time increased by 14.2% after installing the UV BWMS, and it increased by 20.4% with both its installation and implementation of a flow control function. If actual conditions are taken into account, ballasting time after installing the UV BWMS is estimated to increase by at least 30% compared with current ballasting time. Therefore, when concerned parties select a UV type BWMS, it is advisable for them to minimize ship operation losses from an increase in ballasting time by considering the capacity of the actual ballast pumps on board and the flow energy loss of the UV BWMS. Additionally, it is recommended that a BWMS with larger capacity, larger pipes, and pipes with inside coatings be used to minimize the increase in ballasting time after installation of the BWMS.

Ballasting plan optimization for operation of a 2D floating dry dock

  • Yoon, Kyungho;Kim, Hyo-Jin;Yeo, Seungkyun;Hong, Younghwa;Cha, Jihye;Chung, Hyun
    • Structural Engineering and Mechanics
    • /
    • v.74 no.4
    • /
    • pp.521-532
    • /
    • 2020
  • A floating dry dock is an advanced structure that can provide a solution for dry dock space shortages. The critical point in floating dock operation is compensating the deflection caused by a heavy payload by adjusting the water level in the ballast system. An appropriate ballasting plan warrants safe and precise construction on a floating dock. Particularly, in the case of a 2D floating dock, ballasting plan evaluation is crucial due to complex deformation modes. In this paper, we developed a method to calculate the optimal ballasting plan for accurate and precise construction on a 2D floating dock. The finite element method was used for considering the flexibility of the floating dock as well as the construction blocks. Through a gradient-based optimization algorithm, the optimal ballasting plan for the given load condition was calculated in semi-real time (5 min). The present method was successfully used for the actual construction of an offshore structure on the 2D floating dock.

A Study on Hight Efficiency Inverter Ballast using Microprocessor (마이크로프로세서를 사용한 고효율 인버터 안정기에 관한 연구)

  • ;鄭載倫
    • The Proceedings of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.13 no.2
    • /
    • pp.220-220
    • /
    • 1999
  • This paper describes the high efficiency inverter ballast circuit using very cheap microprocessor, which has been developed by the author. A variety of soft-switching techniques have been proposed to reduce the switching losses and EMI problems that occur with higher switching frequencies in switched inverter ballast. The inverter ballast circuit, which employs a temperature sensing circuits has been also proposed to improve starting performance of the fluorescent lamps. That is, the inverter ballast circuit, which employs a soft-starting circuit and soft-switching techniques to implement the power factor correction and to mitigate of power-loss and increase a life time of the fluorescent lamps, has become an attractive performance for ballasting the fluorescent lamps. In this paper, the operation and the control of the inverter ballast are described in detail and experimental results are presented. As the experimental results, when environment temperature is at -40℃, the inverter ballast circuit has low THD(4.8%) of the input current and large power factor(98%) of the lamp current. The proposed improved ballast circuit appears to be a good performance for ballasting fluorescent lamps.

Effects of ballasting Agent (Microsand) on Physical Floc Characteristics (세사 투입에 따라 형성된 플럭의 물리적 특성)

  • Ryu, Jae-Na;Lim, Yoon-Dae;Oh, Je-Ill
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.24 no.5
    • /
    • pp.485-493
    • /
    • 2010
  • Chemical coagulation destabilizes colloidal particles so that particles grow to larger flocs. Solid particles are then removed by solid-liquid separation after typical precipitation. Rapid precipitation enhances the separation by reducing the precipitation time with larger and denser particles. Conventionally, polyelectolyte compounds (polymers) function as a flocculant aid by introducing a interparticle binding, which increases the particle size and density. And more recent ballasted flocculation adds a ballasting agent (microsand) to form denser particles with its high-density(sp gr=2.65). The current research was to evaluate the manner in which ballasted flocs are formed under different injection timings of microsand and to recognize the effects on floc formation. $FeCl_3$ as a coagulant, anionic polymer for a flocculation aid and microsand were used for the floc formation. Floc size (diameter) was widely ranged with the highest mean value when microsand was injected between $FeCl_3$ and polymer. Mean floc density was larger when the floc formed smaller. Settling velocity increased with larger floc size, whilst not significantly affected by the timing of microsand injection. The additional slow mixing on floc formation increased floc size to some extent.

Trend Analysis and Diagnosis for BWTS Remote Monitoring (BWTS 원격 모니터링을 위한 트렌드 분석 및 진단)

  • Choi, Wook-Jin;Kim, Chin-Hoon;Choi, Hwi-Min;Lee, Kwang-Seob;Choi, Woo-Jin;Kim, Joo-Man
    • IEMEK Journal of Embedded Systems and Applications
    • /
    • v.9 no.3
    • /
    • pp.127-135
    • /
    • 2014
  • On lot of ships, Ballast Water Treatment Systems(BWTS) are in use, or the newly built ship should be mandatory installation by 2017. It is IMO(International Maritime Organization) regulations. Because the vessel is in long distance, It is managed this system only in the vessel and it may occur considerable cost of maintenance when a problem arises from BWTS. We describe in this paper how to monitor treated ballast water to make sure the ballast water and BWTS on a ship is in proper condition, but before the port entrance. In addition, analysing and forecasting trend signal to prevent failure. Also we can expect reduce the cost of BWTS maintenance. We can monitor the sensor data value's change which collected through satellite from BWTS. And we can observate the ballasting and de-ballasting state of the vessel easily.

A Real-Time Control Architecture for a Semi-Autonomous Underwater Vehicle (반자율 무인잠수정을 위한 실시간 제어 아키텍쳐)

  • LI JI-HONG;JEON BONG-HWAN;LEE PAN-MOOK;WON HONG-SEOK
    • Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
    • /
    • 2004.05a
    • /
    • pp.198-203
    • /
    • 2004
  • This paper describes a real-time control architecture for DUSAUV (Dual Use Semi-Autonomous Underwater Vehicle), which has been developed at Korea Research Institute of Ships & Ocean Engineering (KRISO), KORDI, for being a test-bed oj development of technologies for underwater navigation and manipulator operation. DUSAUV has three built-in computers, seven thrusters for 6 degree of freedom motion control, one 4-function electric manipulator, one pan/tilt unit for camera, one ballasting motor, built-in power source, and various sensors such as IMU, DVL, sonar, and so on. A supervisor control system for GUI and manipulator operation is mounted on the surface vessel and communicates with vehicle through a fiber optic link. Furthermore, QNX, one of real-time operating system, is ported on the built-in control and navigation computers of vehicle for real-time control purpose, while MicroSoft OS product is ported on the supervisor system for GUI programming convenience. A hierarchical control architecture which consist of three layers (application layer, real-time layer, and physical layer) has been developed for efficient control system of above complex underwater robotic system. The experimental results with implementation of the layered control architecture for various motion control of DUSAUV in a basin of KRISO is also provided.

  • PDF

Dynamic Analysis of Topside Module in Lifting Installation Phase

  • Lee, Jong-Hyun
    • Journal of Ocean Engineering and Technology
    • /
    • v.25 no.4
    • /
    • pp.7-11
    • /
    • 2011
  • The installation phase for a topside module suggested can be divided into 9 stages, which include start, pre-lifting, lifting, lifted, rotating, positioning, lowering, mating, and end of installation. The transfer of the topside module from a transport barge to a crane vessel takes place in the first three stages, from start to lifting, while the transfer of the module onto a floating spar hull occurs in the last three stages, from lowering to the end. The coupled multi-body motions are calculated in both calm water and in irregular waves with significant wave height (1.52m), with suggested force equilibrium diagrams. The effects of the hydrodynamic interactions between the crane vessel and barge during the lifting stage have been considered. The internal forces caused by the load transfer and ballasting are derived for the lifting phases. The results of these internal forces for the calm water condition are compared with those in the irregular sea condition. Although the effect of pitch motion on the relative vertical motion between the deck of the floating structure and the topside module is significant in the lifting phases, the internal force induced pitch motion is too small to show its influence. However, the effect of the internal force on the wave-induced heave responses in the lifting phases is noticeable in the irregular sea condition because the transfer mass-induced draught changes in the floating structure are observed to have higher amplitudes than the external force induced responses.

Seismic reflection imaging ahead of tunnel face using 3 component geophones (3성분 지오폰을 이용한 막장전방 예측 탄성파탐사)

  • Jo Churl Hyun;Cha Young Ho;Yang Jong Hwa;Bang Ki Moon
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.412-417
    • /
    • 2005
  • To ensure the safety of the tunnelling without the loss of economy, the tunnel seismic profiling(TSP) method for the prediction ahead of tunnel face, begins to be used routinely in these days. TSP method does not interfere the tunnelling works while the horizontal drilling does, and its prediction length is longer than that of the drilling. Yet the most frequently adopted technique of TSP in Korea is the multi-shot and 2 receiver array using in-hole receivers, even though this array requires as many as 26 drill-holes for receiver installation and ballasting, which results in 3-6 hours of suspension in excavation work. In this paper, multi-receiver and lesser shot array using side-wall attached 3 component geophones is to be described to prove the efficiency in terms of the survey time as well as the reliability of the method by comparison of the predicted weak points and the face mapping results. The predictions mostly agreed with the real fractures or joint developed zones which have been confirmed during the excavation. It also has been found that TSP method can be effectively applied to perform draining ground water ahead of tunnel face by imaging the geologic discontinuities.

  • PDF

A Study on High Efficiency Inverter Ballast Using Microprocessor (마이크로프로세서를 사용한 고효율 인버터 안정기에 관한 연구)

  • 정재륜
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.13 no.2
    • /
    • pp.88-94
    • /
    • 1999
  • This paper describes the high efficiency inverter ballast circuit using very cheap microprocessor, which has been developed by the author. A variety of soft-switching techniques have been proposed to reduce the switching losses and EMI publems that accur with higher switching frequencies in switched inverter ballast 1be inverter ballast circuit, which employs a temperature sensing circuits has been also proposed to improve starting performance of the fluorescent lamps. That is, the inverter ballast circuit, which employs a soft-starting circuits and soft-switching techniques to implement the power factoc correcticn and to mitigate of power-loss and iocrease a life time of the fluorescent lamps, has become an attractive performance forballasting the fluorescent lamps. In this paper, the operation and the control of the inverter ballast are described in detail and experimental results are presented. As the experimental results, when enviroment temperatture is at TEX>$-40^{\circ}C$, the inverter ballast circuit has low THD(4.8%) of the input current and large power factor(98%) of the lamp current. The proposed improved ballast circuit awears to be a good performance for ballasting fluorescent lamps. lamps.

  • PDF

Methods for sampling and analysis of marine microalgae in ship ballast tanks: a case study from Tampa Bay, Florida, USA

  • Garrett, Matthew J.;Wolny, Jennifer L.;Williams, B. James;Dirks, Michael D.;Brame, Julie A.;Richardson, R. William
    • ALGAE
    • /
    • v.26 no.2
    • /
    • pp.181-192
    • /
    • 2011
  • Ballasting and deballasting of shipping vessels in foreign ports have been reported worldwide as a vector of introduction of non-native aquatic plants and animals. Recently, attention has turned to ballast water as a factor in the global increase of harmful algal blooms (HABs). Many species of microalgae, including harmful dinoflagellate species, can remain viable for months in dormant benthic stages (cysts) in ballast sediments. Over a period of four years, we surveyed ballast water and sediment of ships docked in two ports of Tampa Bay, Florida, USA. Sampling conditions encountered while sampling ballast water and sediments were vastly different between vessels. Since no single sample collection protocol could be applied, existing methods for sampling ballast were modified and new methods created to reduce time and labor necessary for the collection of high-quality, qualitative samples. Five methods were refined or developed, including one that allowed for a directed intake of water and sediments. From 63 samples, 1,633 dinoflagellate cysts and cyst-like cells were recovered. A native, cyst-forming, harmful dinoflagellate, Alexandrium balechii (Steidinger) F. J. R. Taylor, was collected, isolated, and cultured from the same vessel six months apart, indicating that ships exchanging ballast water in Tampa Bay have the potential to transport HAB species to other ports with similar ecologies, exposing them to non-native, potentially toxic blooms.