• Title/Summary/Keyword: Ballasted track

Search Result 95, Processing Time 0.06 seconds

Development of ballast/subgrade investigation technique using GPR/PBS/FWD (GPR/PBS/FWD를 이용한 도상/노반 상태평가 기술 개발)

  • Kim Dae-Sang;Park Tae-Soon;Kang Seung-Goo
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1113-1118
    • /
    • 2004
  • Ballasted track is constructed in consideration of the maintenance. The application time and frequency of MTT(Multiple Tie Tamper) and BS(Ballast Cleaner) depend on track geometry measurements. This paper presents the application of Ground Penetrating Radar(GPR), Falling Weight Deflectometer(FWD), and Portable Ballast Sampler (PBS) to evaluate the effects of track geometry due to substructure deterioration and to build a reliable substructure evaluation system.

  • PDF

Comparison of Track Recording with Surveying in Track irregularity Measurement (궤도틀림의 검측값과 측량결과 비교)

  • Lee, Jee-Ha;Choi, Ii-Yoon;Kim, Bak-Jin
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.1090-1095
    • /
    • 2008
  • Track geometry changes by traffic loads. The bigger the changes are, the worse the riding comfort and running stability of train. This is so-called track irregularity and is the most important quality parameters of ballasted track. To objectively assess track irregularity, track geometry should be able to be measured. Practically, railway companies use moving chord method, which determine versine values via a chord. The versine is the vertical distance to curve measured in the middle of the chord. This type of method measures only versine of track irregularity curve by transfer function from the characteristics of measuring device. In this report, review the characteristics of two types of measuring tools by comparing the measurements. The one is GRP-1000 system, optical surveying system with Total station and lazar prism trolley. This calculates track geometry by surveying absolute coordinates of two points each on both rail heads. The other is EM-120, measures versine with 10m of symmetrical chord length.

  • PDF

A Study on the Assessment of Track Stabilization on Ballast Cleaning work site (크리너 작업구간 선로안정화 상태평가에 관한 연구)

  • Jeon, Il-Sik;Lee, Syeung-Youl;Choi, Hyoung-Su;Kim, Han-Chip
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.268-274
    • /
    • 2011
  • In railway, Ballast plays an essential role as intermedium in transmitting train load to subgrade safely. Gyoung-Bu HSL 1st phase consists of ballasted track except for over 5km long tunnels. Ballast track occurred track irregularity by train loads and requires periodic maintenance work. However, Repetitive train operation and tamping work cause to accelerate track irregularity and ballast deterioration such as abrasion and crushing. For these reason, Track irregularity areas had occurred ballast cleaning work to improve track quality. However, for the train to run safety, ballast cleaner working area needs train speed reduction and track stabilization work due to ballast relaxation and initial settlement. In this study, according to train speed-up and cumulative traffic tonnage, we measured and analyzed the track settlement and acceleration of sleepers to evaluate of track stabilization in order to keep the ballast condition stable after cleaning work.

  • PDF

Evaluating of Structural Safety of Slab Track (슬래브궤도의 구조안전성 평가)

  • 강윤석;양신추;이영제
    • Proceedings of the KSR Conference
    • /
    • 2000.05a
    • /
    • pp.431-438
    • /
    • 2000
  • In recent years. the destructive force acting on the ballasted track is on the increase with the speed-up of trains and the number of trains, requiring more labor and expenditure to maintain the track in goof condition. Slab track has been developed to decrease the track maintenance work on earthworks. One type of slab track Rheda has Prefabricated track grid, consisting of rails. Prestressed concrete sleepers and reinforcement rods are aligned into position. and then concrete is then placed to integrate the sleepers into a reinforced concrete track slab. In this paper, a new analysis model for the system analysis of the slab track is presented. Then the analysis results are compared with requirements for slab track.

  • PDF

A Study on the Reliability of Various Track Recording Data (다양한 궤도틀림 데이터의 신뢰성 검토)

  • Lee, Jee-Ha;Ahn, Sung-Hyuk;Park, Hye-Jong;Kim, Bag-Jin
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.435-441
    • /
    • 2011
  • Track geometry changes by traffic loads. The bigger the changes are, the worse the riding comfort and running stability of train. This is so-called track irregularity and is the most important quality parameters of ballasted track. To objectively assess track irregularity, track geometry should be able to be measured. Practically, railway companies in Korea use various track recording equipments to measure track irregularity. But this various equipments output different data due to their geometrical structure even measured at same location. In this report, the correlation of various track recording data used in Korea was reviewed.

  • PDF

Probability Distribution of Track Recording Data (궤도틀림 검측 데이타의 확률분포 검토)

  • Lee, Jee-Ha;Na, Sung-Hoon;Kim, Bag-Jin;Lee, You-Bok
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.310-314
    • /
    • 2010
  • Track geometry changes by traffic loads. The bigger the changes are, the worse the riding comfort and running stability of train. This is so-called track irregularity and is the most important quality parameters of ballasted track. To objectively assess track irregularity, track geometry should be able to be measured. Practically, railway companies in Korea use normal distribution as probability distribution of track irregularity. But some countries use non-normal distribution according to their own track recording system. In this report, reviewed probability distribution of Kyung-Bu high-speed line and tested normality.

  • PDF

Suggestion for Train Vibration Equations based on Change in Track System (궤도구조 변경에 따른 열차 진동 추정식 제안)

  • 김응록;박연수;강성후;박선준;김흥기
    • Journal of the Korean Society for Railway
    • /
    • v.5 no.1
    • /
    • pp.48-54
    • /
    • 2002
  • This research estimated decreased vibration level as quantitative according to change of track system on Seoul Subway Line No. 1 from existing ballasted track system(Pandrol type clip) to concrete track system(Youbgdan type isolation rubber clip). Following change to concrete system, vibration level at tunnel floor decreased between 4-8dB(V). Vibration equations suggested in this paper consider the velocity of train and can estimate quantitative vibration response. These are divided by ultimate limit state($\beta$=0), serviceability limit state($\beta$=1.28) and safety state($\beta$=3), respectively. The reliability index, $\beta$=0, means 50% data line obtained by least squares best-fit line. The reliability index $\beta$=1.28 and 3 represent boundaries below 90% and 99.9% respectively.

Construction Case of Maintenance-free Track System in Application of Elastic Rail Fastening System for Sharp Curved Section (급곡선용 레일탄성체결장치를 사용한 생력화궤도 시공 사례)

  • Kong Sun-Yong;Kim Sang-Jin
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.382-388
    • /
    • 2005
  • SMSC(Seoul Metropolitan Subway Corporation) is substantially taking the core role of mass transit system in Seoul Metropolitan area. When it was built, the design had challenged to sharp curved tracks less than 250m radius considering the protection of buildings and cultural properties as well as the connection to ground roads. Such circumstances have required a certain extent of slack in track geometry and therefore led to the construction of ballasted track with wooden sleepers. However, the dynamic force from running on sharp curved track has caused the misalignment and abnormal failure of track geometry, and it has resulted in a frequent maintenance and repair works which require a lot of cost and manpower. In this paper, we present the construction case of maintenance-free track system by using of concrete sleeper and elastic rail fastening system to ensure the safety of both passengers and trains, and to contribute the effective maintenance for track facilities of SMSC.

  • PDF

Comparison of Track Vibration Characteristics for Domestic Railway Tracks in the Aspect of Rolling Noise (철도 전동 소음의 관점에서 해석한 국내 철도의 진동 특성 비교)

  • Ryue, Jungsoo;Jang, Seungho
    • Journal of the Korean Society for Railway
    • /
    • v.16 no.2
    • /
    • pp.85-92
    • /
    • 2013
  • An important source of noise from railways is rolling noise caused by wheel and rail vibrations induced by acoustic roughness at the wheel-rail contact. The main contributors to rolling noise are the sleepers, rail, and wheels. In order to analyze and predict rolling noise, it is necessary to understand the vibrating behaviors of railway tracks, as well as of the wheels. In the present paper, theoretical modeling methods for railway track are reviewed in terms of rolling noise; these methods are applied for the three representative types of domestic railway tracks operated: the conventional ballasted track, KTX ballasted track and KTX concrete track. The characteristics of waves propagating along rails are investigated and compared among the types of tracks. The tracks are modeled as discretely supported Timoshenko beams and are compared in terms of the averaged squared amplitude of velocity, which is directly related to the sound radiation from the rails.