• 제목/요약/키워드: Ballast design

Search Result 253, Processing Time 0.904 seconds

Study for Progress Rate of Standard Deviation of Irregularity Based on Track Properties for the Railway Track Maintenance Cycle Analysis (궤도 유지보수 주기 예측을 위한 구간 특성에 따른 궤도틀림 표준편차 진전정도 분석)

  • Jeong, Min Chul;Kim, Jung Hoon;Lee, Jee Ha;Kang, Yun Suk;Kong, Jung Sik
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.16 no.3
    • /
    • pp.31-40
    • /
    • 2012
  • The irregularity of railway track affects not only the comfort of ride such as noise or vibration but also the safety of train operation. For this reason, it is an interesting research area to design a reliable and sustainable railway track system and to analyze the train movement mechanism based on systematic approaches considering reasons of track irregularity possible in a specific local environment. Irregularity data inspected by EM-120, an railway inspection system in Korea includes unavoidable incomplete and erratic information, so it is encountered lots of problem to analyse those data without appropriate pre-data-refining processes. In this research, for the efficient management and maintenance of railway system, progress rate of standard deviation of irregularity is quantified. During the computation, some important components of railways such as rail joint, ballast, roadbed, and fastener have been considered. Probabilistic distributions of irregularity growth with respect to time are computed to predict the remaining service life of railway track and to be adapted for the safety assessment.

Real-scale Accelerated Testing to Evaluate Long-term Performance for Bridge/Earthwork Transition Structure Reinforced by Geosynthetics and Cement Treated Materials (토목섬유와 시멘트처리채움재로 보강한 교량/토공 접속구조의 장기공용성 평가를 위한 실물가속시험)

  • Lee, Il-Wha;Choi, Won-Il;Cho, Kook-Hwan;Lee, Kang-Myung;Min, Kyung-Chan
    • Journal of the Korean Society for Railway
    • /
    • v.17 no.4
    • /
    • pp.251-259
    • /
    • 2014
  • The transition zone between an earthwork and a bridge effect to the vehicle's running stability because support stiffness of the roadbed is suddenly changed. The design criteria for the transition structure on ballast track were not particular in the past. However with the introduction of concrete track is introduced, it requires there is a higher performance level required because of maintenance and running stability. In this present paper, a transition structure reinforced with geosynthetics is suggested to improve the performance of existing bridge-earthwork transition structures. The suggested transition structure, in which there is reinforcing of the approach block using high-tension geosynthetics, has a structure similar to that of earth reinforced abutments. The utilized backfill materials are cement treated soil and gravel. These materials are used to reduce water intrusion into the approach block and to increase the recycling of surplus earth materials. An experiment was performed under the same conditions in order to allow a comparison of this new structure with the existing transition structure. Evaluation items are elastic displacement, cumulative settlement, and earth pressure. As for the results of the real-scale accelerated testing, the suggested transition structure has excellent performance for the reduction of earth pressure and settlement. Above all, it has high resistance the variation of the water content.

The Electrochemical Chlorination for Marine Plankton Community Disinfection (해양 플랑크톤 군집의 전기분해 염소소독 효과)

  • Kang, Jung-Hoon;Shin, Kyoung-Soon;Hyun, Bong-Gil;Jang, Min-Chul;Kim, Eun-Chan;Chang, Man
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.10 no.3
    • /
    • pp.127-137
    • /
    • 2007
  • To confirm whether or not the Electrochemical Disinfection System (EDS) meet with the D-2 regulation established by IMO (International Maritime Organization), the biological treatment efficacy of the EDS was assessed using three groups of natural marine plankton (bacteria, $10-50\;{\mu}m$ and $>50\;{\mu}m$ sized organisms). Influent water was passed through the EDS under the flow velocity ($23.8\;m^3/hr$) and test design was consisted of control (no treatment) and experimental (10 ppm and 30 ppm) condition for total residual chlorine (TRC). And the biological condition of the influent water followed the standards established by the guidelines for the approval of ballast water management systems. The disinfection efficacy of the $10-50\;{\mu}m$ sized organisms (phytoplankton) was assessed by three kinds of measurements using photomicroscope, epifluorescence microscope and fluorometer (fumer Designs 10-AU). After being passed through the EDS, all motile phytoplankton lost their motility under photomicroscope, the colour of chlorophyll fluorescence fumed from red into green under epifluorescence, and the high chlorophyll fluorescence (Expt. 1: 6.95, Expt. 2: 7.11) detected by fluorometer decreased into value not detected. These results indicated phytoplankton community was totally killed after electrochemical disinfection treatment. Survivorship of the larger organisms than $50\;{\mu}m$ was determined based on the appendage's movement under a stereomicroscope. Natural assemblage collected from ambient seawater was killed shortly after being passed through the EDS, whereas some Artemia remained alive. However, no live Artemia was found after 24 hour further exposure to each TRC concentration (10 and 30 ppm) under darkness. After electrochemical treatment, the target bacteria such as aerobes, coliform and Escherichia coli were completely killed on the basis of CFU (colony forming unit) on Petrifilm plate ($3\;M^{TM}$) after 48 hr incubation. Moreover, no regrowth was found in the three groups of plankton during five days under additional exposure to the treated water. These results indicated that the disinfection efficiency of the EDS on the three groups of plankton satisfy D-2 regulation.

  • PDF