• Title/Summary/Keyword: Balise

Search Result 15, Processing Time 0.02 seconds

Study on Test methods and Procedures of Hybrid Track Circuit (하이브리드 궤도회로 시험방법 및 절차에 관한 연구)

  • Kwon, Bu-Seok;Jung, Ho-Hung;Lee, Key-Seo;Li, Chang-Long
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.9 no.3
    • /
    • pp.335-342
    • /
    • 2014
  • In this paper We study on test methods and procedures for Hybrid Track Circuit's practicalization. It's possible to apply to HTC's Seoulmetro and high-speed train by proposing test method considering special rail environment and RFID tag and leader, antenna We also present the test methods and procedures for safe and reliable of interface among the Hybrid track circuit devices.

The Study of Balise Transmission module for Railway Onboard Signal System (철도차상신호시스템의 BTM장치에 관한 연구)

  • Kim, You-Ho;Lee, Hoon-Koo;Lee, Soo-Hwan;Kim, Jong-Ki;Baek, Jong-Hyen
    • Proceedings of the KIEE Conference
    • /
    • 2005.07b
    • /
    • pp.1570-1572
    • /
    • 2005
  • Is changed from ground signal way to Onboard signal way serving speed elevation of railroad worldwide. Therefore, importance of Onboard signal equipment is rising. Onboard signal equipment value of first time construction important. Domestic railroad and city railroad are built without standard current. Therefore, much expense is paid in maintenance and alternate of equipment. Therefore, establish standard for devices of childhood. Therefore, can have curtailment of operational expenses and specialization of skill human strength.

  • PDF

Verification of High Speed Performance for the Electronic Pedal using a Rotor (회전체를 이용한 전자페달의 고속 성능 검증)

  • KIM, Yong-Kyu;GO, Jun-Young;YOON, Yong-Ki;KIM, Ju-Yeop;LEE, Jong-Hyun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.65 no.8
    • /
    • pp.1450-1456
    • /
    • 2016
  • In this paper, we have checked a method of performance evaluation for electronic pedal, which is a core technology of HBD for detecting the axle temperature of high-speed train. As it is practically impossible to conduct train speed test of 500 km/h, we utilize a high speed rotor for evaluating high speed performance of the electronic pedal instead. According to this method, we found that the measurement results by the velocity measuring instrument is similar with the ones from this research through the high speed rotor. In conclusion, it will be possible to conduct reliability evaluation for high speed performance for Beacon, Balise and RFID, which are utilized for transmitting vital information of train control systems through using the rotor.

A Study of Detecting Broken Rail using the Real-time Monitoring System (실시간 모니터링을 통한 레일절손 검지에 관한 연구)

  • Kim, Tae Geon;Eom, Beom Gyu;Lee, Hi Sung
    • Journal of the Korean Society of Safety
    • /
    • v.28 no.4
    • /
    • pp.1-7
    • /
    • 2013
  • Train accidents can be directly connected to fatal accidents-collision, derailment, Fire, railway crossing accidents-resulting in tremendous human casualties. First of all, the railway derailment is not only related to most of railway accidents but also it can lead to much more catastrophic accompanying train overtured than other factors. Therefore, it is most important factor to ensure railway safety. some foreign countries have applied to the detector machines(e.g., ultrasonic detector car, sleep mode, current detector, optical sensing, optical fiber). Since it was developed in order to prevent train from being derailed. In korea, the existing track method has been used to monitor rail condition using track circuit. However, we found out it impossible for Communication Based Train Control system(CBTC), recent technology to detect rail condition using balise(data transmission devices) without no track circuit. For this reason, it is needed instantly to develop real-time monitoring system used to detect broken rails. Firstly, this paper presents domestic and international statues analysis of rail breaks technology. Secondly, the composition and the characteristics of the real-time monitoring system. Finally, the evidence that this system could assumed the location and type of broken rails was proved by the experiment of prototype and operation line tests. We concluded that this system can detect rail break section in which error span exist within${\pm}1m$.

Study on the mutual interference of mixed mode operation between KTX and AREX train at the airport linked line (공항철도연계 구간의 고속열차(KTX)와 전동열차(AREX) 혼용운용에 따른 ATP지상설비간 상호간섭 영향에 관한 연구)

  • Kim, Su-Bong;Song, In-Kuen
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.7
    • /
    • pp.23-30
    • /
    • 2016
  • ccording to the airport railroad linkage facility expansion project constructing a connecting line to the airport railway and improving the signal system and Gyeongui Susaek Station, a high-speed train is able to run directly from Gyeongbu and Honam to the airport railway. According to mixed operation of high-speed Korea Train Express (KTX) and Airport Railroad Express (AREX) trains, to establish ERTMS/ETCS L1 ATP to operate the KTX train, the signaling system of the AREX train is the same as the existing ATC/ATO, but its operation became impossible because the high-speed train causes mutual interference between the "high-speed train (KTX) and AREX ground signaling equipment" and between the "AREX train and KTX (high-speed train) ATP ground equipment." Thus, it was necessary to have a supplemental technical interference analysis comparing the characteristics of the AREX beacon and the KTX balise. So, we resolve the problems of mutual interference between the "high-speed train (KTX) and AREX ground signaling equipment" and between the "AREX train and KTX (high-speed train) ATP ground equipment" with a test using an actual train, and we confirm the technical validity with three types of test module.