• 제목/요약/키워드: Balanced operation

검색결과 267건 처리시간 0.025초

이중강압 DC-DC 컨버터를 이용한 새로운 LED 전류 밸런싱 기법 (A New Current Balancing Operation for LED using Double-Step-Down DC-DC Converter)

  • 김기수;도 득 드완;차헌녕;김흥근
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2017년도 전력전자학술대회
    • /
    • pp.347-348
    • /
    • 2017
  • This paper presents a new current balancing operation for LED using double-step-down dc-dc converter. The two output currents of the proposed converter can be balanced by charge balance condition although the two output resistances are different. In addition, voltage stresses of the switches of the proposed converter are lower than those of interleaved buck converter. To verify the operation of the proposed converter, simulation program is used.

  • PDF

비대칭 불평형 전압 운전시 유도전동기의 동작 특성 해석 (Analysis on the Operation Characteristics of Induction Motor Operated by Asymmetric Unbalanced Voltage)

  • 김종겸;손홍관;정종호;이은웅
    • 전기학회논문지P
    • /
    • 제53권2호
    • /
    • pp.58-64
    • /
    • 2004
  • Most of the loads in industrial power distribution systems are balanced and connected to three power systems. However, in the user power distribution systems, most of the loads are single & three phase and unbalanced, generating voltage unbalance. Voltage unbalance is a condition in a polyphase system in which the rms values of the line-to-line voltages or the phase angles between consecutive line-to-line voltages, are not all equal. Slight voltage unbalance generates a disproportionately high current unbalance at the motor stator winding. This paper presents a scheme on operation states of a three-phase induction motor under unbalanced voltages. The three-phase voltages applied to the stator winding of the studied induction motor are controlled by respectively adjusting the magnitude and phase angle of each phase. The voltage unbalanced factor(VUF) of the three-phase source voltages can then be varied to examine the different values of VUF on machine's operation characteristics.

대칭 불평형 전압 운전시 유도전동기의 동작 특성 해석 (Analysis on the Operation Characteristics of Induction Motor Operated by Symmetric Unbalanced Voltage)

  • 김종겸;손홍관;정종호;이은웅
    • 전기학회논문지P
    • /
    • 제53권3호
    • /
    • pp.110-115
    • /
    • 2004
  • Most of the loads in industrial power distribution systems are balanced and connected to three power systems. However, in the user power distribution systems, most of the loads are single & three phase and unbalanced, generating voltage unbalance. This paper presents a scheme on operation states of a three-phase induction motor under unbalanced voltages. The three-phase voltages applied to the stator winding of the studied induction motor are controlled by respectively adjusting the magnitude and phase angle of each phase. The voltage unbalanced factor(VUF) of the three-phase source voltages can then be varied to examine the different values of VUF on machine's operation characteristics.

확장된 영향계수법을 이용한 능동자기베어링의 운전상황에서 측정체 진원도 오차 규명 (In-situ Runout Idientification in Active Magnetic Bearing System by Extended Influence Coefficient Method)

  • 김철순;이종원
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 1995년도 추계학술대회논문집; 한국종합전시장, 24 Nov. 1995
    • /
    • pp.154-159
    • /
    • 1995
  • In this study, an efficient, yet easy to use, in-situ runout identification scheme by using extended influence coefficient method is presented for active magnetic bearing(AMB) systems. It is shown experimentally that the proposed scheme successfully identifies and eliminates the troublesome runout of the well balanced AMB system in the laboratory so that a high precision spindle system can be achieved, while it is in operation.

  • PDF

단상전원에 접속된 3상 유도전동기의 손실분석 (Loss Analysis of Three Phase Induction Motor Connected to Single Phase Source)

  • 김도진;좌종근
    • 전기학회논문지P
    • /
    • 제57권2호
    • /
    • pp.121-126
    • /
    • 2008
  • This paper analyzes the losses of a Steinmetz connection three-phase induction motor which is supplied by a single-phase source. The T-type equivalent circuit which is taken no-load losses into account is used to determine phase converter capacitive reactances at starting and rated speed by using the condition of the minimum voltage unbalance. The starting and the operating capacitor are replaced at the slip of the same voltage unbalance factor points which are depicted using two capacitive reactances. The operation characteristics are investigated by comparing with those of three-phase balanced operation to find the feasibility of single-phase operation. To analyze the losses of this motor, the output power decrease factor(OPDF), the loss ratio(LR), the no load loss ratio(NLLR), the copper loss ratio(CLR), the stator copper loss ratio(SCLR), and the rotor copper loss ratio(RCLR) are defined and simulated in the whole slip range. The simulated results show that OPDF is maintained almost uniformly, LR is low at low speed and high at high speed, CLR is higher !ban NLLR, but CLR varies concavely and NLLR varies convexly at high speed, SCLR is low at low speed and high at high speed, but SCLR varies convexly at high speed, and RCLR is nearly opposite to SCLR.

플랜트 기자재 업체의 효율적인 작업장 운영을 위한 실시간 모니터링 시스템 개발 및 적용 (Development and Application of Real-Time Monitoring System for Efficient Operation of Workplace in Plant Equipment Maker)

  • 정아름;조지운;백태현
    • 산업공학
    • /
    • 제25권1호
    • /
    • pp.114-126
    • /
    • 2012
  • This study describes a real-time location monitoring system developed for efficient operation of workplace in plant equipment maker. This monitoring system can be applied for indoor and outdoor working environment respectively. By using the real-time tracking system based on RTLS, it is possible to track worker's movement and location of working object under indoor working environment. For outdoor working environment, the real-time monitoring system based on IDGPS is applied for work safety and balanced workload. A case study is provided to evaluate the performance of the real-time monitoring system.

An Analysis on Simulator Scenarios for the Integrated Evaluation when Applied to Teamwork by Deck and Engine Officers

  • Choi, Soon-Man
    • Journal of Advanced Marine Engineering and Technology
    • /
    • 제30권7호
    • /
    • pp.782-790
    • /
    • 2006
  • The evaluation systems in SHS(Ship Handling Simulator) or ERS(Engine Room Simulator) give trainees the opportunity to feedback how they responded suggesting them the operation result by scores. If SHS and ERS are integrated each other by network to enable the synchronous training for both deck and engine officers these systems need to include inherently the function of integrated evaluation which produces the evaluation score for the team play of deck and engine officers. The integrated evaluation is effective especially when assessing the responses at emergency situation of ship or the matter of efficiency of ship operation even if assessors feel difficult in editing simulation scenarios for integrated evaluation. This study focuses on the property of integrated evaluation and considerations when editing them. It suggests also a useful procedure to estimate whether a scenario for integrated evaluation is reasonable and balanced or not based on the analysis in the proprieties and reasonabilities which are to be prepared by assessors before testing trainees or examinees.

우리나라 응급의료기금 운영실태 및 문제점 (A Study on Improvement of EMS Fund Using in Korea)

  • 백홍석
    • 한국응급구조학회지
    • /
    • 제9권2호
    • /
    • pp.101-110
    • /
    • 2005
  • In Korea, EMS Fund Operation seems to move the opposite direction to right way. The most initial EMS fund was consumed loan for some emergency patients without any particular results. Since 2002, the use of EMS fund also has shown a tendency to shift one side. By the results, it was 44.3% to support emergency medical centers, so called hospital EMS system and 28.4% to purchase ambulances and helicopters, and 1.6% to operate Central Medical Center, prehospital base in the EMS fund consumed in 2004. It was never supported for the environmental improvement and development of universities, colleges, and private EMS units having the primary responsibilities. The initial EMS fund using should be used for prehospital base, e.g., prehospital staffs, communications, and facilities and balanced development between public and private EMS units than any other fund using.

  • PDF

영구자석 다극 배치에 의한 가동 코일형 리니어 진도 엑츄에이터의 특성 (Characteristic of Moving Coil type Linear Oscillatory Actuator by Multi-Pole Permancent Magnet Arrangement)

  • 김덕현;강규홍;홍정표;김규탁
    • 대한전기학회논문지:전기기기및에너지변환시스템부문B
    • /
    • 제50권6호
    • /
    • pp.273-281
    • /
    • 2001
  • In order to overcome the demerit and to improve the operation characteristics of Moving Coil type Linear Oscillatory Actuator(MC-LOA) with single-pole permanent magnet, this paper presents two models having the balanced magnetic circuit by multi-pole permanent magnet. They are short coil type with two-pole single-sided and two-ple double-sided permanent magnet. The characteristics between single-pole and multi-pole permanent magnet type MC-LOA are compared. As a result, multi-pole type MC-LOA has more merits than single-pole type about operation characteristics improvement and machine volume. The characteristics analysis is performed by their dynamic analysis composed of kinetic and electric equations and Finite Element Method(FEM). The propriety of multi-pole type MC-LOA model is verified with analysis results.

  • PDF

재고설비규모를 위한 최적분배 모델의 연구 (A Study on the Optimum Allocation Model for Inventory Capacity)

  • 최진영;정기호
    • 산업경영시스템학회지
    • /
    • 제5권6호
    • /
    • pp.1-6
    • /
    • 1982
  • The objective of this thesis to Provide a better insight into the effect of the amount of in-process storage has on the efficiency of production line with variable operation times. It is assumed that the material enters the line at the first work station and is then processed progressively through the line until it exits at the last work station, a finite amount of in-process storage is provided before all but the first work station of the line and the operation time of the work stations are statistically independent and follow exponential distribution. Under the above assumption, optimum allocation model is developed and following two approaches are used : 1) Given the available storage capacity, optimum allocation which minimizes the number of items in the line. 2) Given the available storage capacity, optimum allocation which. maximizes the utilization factor of the line. In a balanced three stage line, the production line efficiency is maximized under both categories when the second in-process storage is larger than the first.

  • PDF