• Title/Summary/Keyword: Backward transportation

Search Result 50, Processing Time 0.025 seconds

A Study on Improvement of the Shape and Performance of Raised Pavement Marker (도로표지병의 형태 및 기능 개선에 관한 연구)

  • Kim, Sang-Bum;Kwon, Yong-Seok
    • Journal of the Korean Society of Safety
    • /
    • v.21 no.6 s.78
    • /
    • pp.82-87
    • /
    • 2006
  • The existing raised pavement marker, however, have some limitations. Most of them are square-shaped which makes only forward and backward retro-reflection, their orientation can be easily changed by impact of vehicle, and the surface reflector can be readily contaminated leading poor functioning. In addition, maintenance for broken raised pavement marker is not easy. The purpose of the study is to design and manufacture a new and improved type of raised pavement marker. The new raised pavement marker has round-shaped upper structure. Its body was separated from the holder and the reflector was surrounded by acrylic cover. We tested performances of the constituent parts, optimum load after installation, and reflection efficiency. The new raised pavement marker will be an initiation of studies on the improvement of the shape and performance of raised pavement markers.

A Study of the Logistics Development in Hai Phong Port

  • Yoon, Dae-Gwun;Doan, Thi Bich Thuy
    • Journal of Navigation and Port Research
    • /
    • v.42 no.2
    • /
    • pp.137-142
    • /
    • 2018
  • Vietnam is entering an important phase of urbanization that corresponds to the current economic development. Developing logistics of Vietnam in general, and Haiphong particularly, is urgent in order to meet the need for the economic development of Viet Nam in this period of international integration. Hai Phong's development record over the past 20 years is remarkable. In conjunction with the local government's efforts, external factors, such as increasing direct foreign investment, is turning Hai Phong into Vietnam's logistics hub. However, even though Hai Phong accounted for 98% of North Vietnam's throughput, its logistics services are low level, the ports are fragmented, and the port management scale is backward, with the legal system overlapping. This paper has systematically evaluated the development of Haiphong city during recent years, then offers some solutions to develop logistics for Hai Phong ports.

Progressive Iterative Forward and Backward (PIFAB) Search Method to Estimate Path-Travel Time on Freeways Using Toll Collection System Data (고속도로 경로통행시간 산출을 위한 전진반복 전후방탐색법(PIFAB)의 개발)

  • NamKoong, Seong
    • Journal of Korean Society of Transportation
    • /
    • v.23 no.5 s.83
    • /
    • pp.147-155
    • /
    • 2005
  • The purpose of this paper is to develop a method for estimation of reliable path-travel time using data obtained from the toll collection system on freeways. The toll collection system records departure and arrival time stamps as well as the identification numbers of arrival and destination tollgates for all the individual vehicles traveling between tollgates on freeways. Two major issues reduce accuracy when estimating path-travel time between an origin and destination tollgate using transaction data collected by the toll collection system. First, travel time calculated by subtracting departure time from arrival time does not explain path-travel time from origin tollgate to destination tollgate when a variety of available paths exist between tollgates. Second, travel time may include extra time spent in service and/or rest areas. Moreover. ramp driving time is included because tollgates are installed before on-ramps and after off-ramps. This paper describes an algorithm that searches for arrival time when departure time is given between tollgates by a Progressive Iterative Forward and Backward (PIFAB) search method. The algorithm eventually produces actual path-travel times that exclude any time spent in service and/or rest areas as well as ramp driving time based on a link-based procedure.

A Condition Rating Method of Bridges using an Artificial Neural Network Model (인공신경망모델을 이용한 교량의 상태평가)

  • Oh, Soon-Taek;Lee, Dong-Jun;Lee, Jae-Ho
    • Journal of the Korean Society for Railway
    • /
    • v.13 no.1
    • /
    • pp.71-77
    • /
    • 2010
  • It is increasing annually that the cost for bridge Maintenance Repair & Rehabilitation (MR&R) in developed countries. Based on Intelligent Technology, Bridge Management System (BMS) is developed for optimization of Life Cycle Cost (LCC) and reliability to predict long-term bridge deteriorations. However, such data are very limited amongst all the known bridge agencies, making it difficult to reliably predict future structural performances. To alleviate this problem, an Artificial Neural Network (ANN) based Backward Prediction Model (BPM) for generating missing historical condition ratings has been developed. Its reliability has been verified using existing condition ratings from the Maryland Department of Transportation, USA. The function of the BPM is to establish the correlations between the known condition ratings and such non-bridge factors as climate and traffic volumes, which can then be used to obtain the bridge condition ratings of the missing years. Since the non-bridge factors used in the BPM can influence the variation of the bridge condition ratings, well-selected non-bridge factors are critical for the BPM to function effectively based on the minimized discrepancy rate between the BPM prediction result and existing data (deck; 6.68%, superstructure; 6.61%, substructure; 7.52%). This research is on the generation of usable historical data using Artificial Intelligence techniques to reliably predict future bridge deterioration. The outcomes (Long-term Bridge deterioration Prediction) will help bridge authorities to effectively plan maintenance strategies for obtaining the maximum benefit with limited funds.

Signal Optimization Model Reflecting Alternative Use of Lanes for Left/Through Traffic at A Signalized Intersection (차로공동이용화를 위한 신호최적화모형 개발 연구)

  • 신언교;홍성표;김동녕
    • Journal of Korean Society of Transportation
    • /
    • v.19 no.3
    • /
    • pp.75-88
    • /
    • 2001
  • Signal optimization model for alternative use of lanes at a signalized intersection with an stop-line added backward was presented in this paper. The simulation results shot-ed that the traffic fed from the stop-line passed the intersection in each specified phasing interval for left and through traffic. The experimental results indicated that the proposed model was much superior to traditional signal optimization methodology in reducing delay, fuel consumption, and disutility index for delay and stops. The effects for reducing delay were greater than those for doing fuel consumption and disutility index due to the added stop-line. The proposed model is expected to alleviate traffic congestion at intersections, both which have no left turn pocket, and which have large left turn volume. The model is recommended to adapted for intersections spaced long among them with no near driveway.

  • PDF

Kinematic and Structural Analysis of a 6-DOF Manipulator for Narrow-space Work (협소 공간 작업을 위한 6축 다관절 로봇의 기구학 및 구조해석)

  • Chung, Seong Youb;Choi, Du-Soon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.3
    • /
    • pp.666-672
    • /
    • 2017
  • Our research team is developing a 6-DOF manipulator for narrow workspaces in press forming processes, such as placing PEM nuts on the bottom of a chassis. In this paper, kinematic analysis was performed for the position control of the manipulator, along with structural analyses for position accuracy with different payloads. First, the Denavit-Hatenberg (DH) parameters are defined, and then the forward and backward kinematic equations are presented using the DH parameters. The kinematic model was verified by visual simulation using Coppelia Robotics' virtual robot experimentation platform (V-REP). Position accuracy analysis was performed through structural analyses of deflection due to self-weight and deflection under full payload (5 kgf) in fully opened and fully folded states. The maximum generated stress was 22.05 MPa in the link connecting axes 2 and 3, which was confirmed to be structurally safe when considering the materials of the parts.

The Direction of Urban Development and the Change of Quality of Life in Integrated Yosu City (통합여수시 지역주민의 삶의 질 변화와 도시발전의 과제)

  • 이정록;이상석;추명희
    • Journal of the Economic Geographical Society of Korea
    • /
    • v.2 no.1_2
    • /
    • pp.123-144
    • /
    • 1999
  • This paper examines the change of quality of life in the Integrated Yosu City and suggests the directions of urban development. Research into the quality of life in local and region scale is interesting both from the point of view of theory and practice, and has attracted much attention in the social sciences since the 1960s. This study is an attempt to examine the change of the quality of hie in the Integrated Yosu City. In the overall assessment of the level of satisfaction about the quality of life during the past five years, most of the respondents have positive evaluation of the changes of quality of urban life. In particular, the quality of living facilities, urban administration and convenience services has relatively improved during the past five years. On the other hand, the quality of physical environment. art and cultural opportunities, transportation options has been backward during the past five years. Therefore, the directions of urban development of the Integrated Yosu City may be summarized as follows: the establishment of a wide transportation network system, waterfront development, the activation of tourism industry and harbor works, the preparation of an urban landscape, the citizens'campaign for a community culture.

  • PDF

A Study on Developing Reverse Parking Assistant Algorithm for Hi-modal Tram (바이모달 트램의 후진주차보조 알고리즘 개발에 관한 연구)

  • Choi, Seong-Hoon;Park, Tae-Won;Lee, Soo-Ho;Moon, Kyeong-Ho
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.17 no.5
    • /
    • pp.84-90
    • /
    • 2009
  • The bi-modal tram is under development as a new public transportation. The features of the tram are an extended wheel base and its length. This features result in difficulties for drivers on maneuvering the tram. Therefore, the all wheel steering system is applied to the articulated vehicle. The AWS system enables the vehicle to steer all the rear wheels independently and improves its driving characteristics. However, the bi-modal tram has a problem to move backward in the limited place because of its geometric feature and the AWS system. Hence, the reverse parking assistant algorithm for articulated vehicle is developed to solve the problems of the reverse parking. Using the vehicle model which includes the reverse parking assistant algorithm, the dynamic analysis is performed for several parking cases. By the result of the analysis, the stability and validity of the reverse parking assistant algorithm is verified.

Sludge Transportation by the Submerged Barrier (수중격벽을 이용한 슬러지이송)

  • Park, Suk Gyun;Kang, Seon-Hong
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.20 no.6
    • /
    • pp.857-865
    • /
    • 2006
  • The submerged barrier, employed in a reactor, divided a reactor into sludge settling zone and mixing zone according to flow type. In spite of mixing in the mixing zone, the lower part of sludge settling zone than the top of barrier was in a steady flow due to the barrier, which prevented the turbulent flow, produced from the mixing zone, from being diffused into the sludge settling zone. Therefore, the sludges in the mixing zone flowed backward over the barrier into the upper part of the sludge settling zone by turbulent flow and settled down in the sludge settling zone by the force of gravity. When barrier/water level ratio was 0.5, most sludges almost did not settle down in tile sludge settling zone because the sludges were directly affected by the turbulent flow, generated from mixer in the mixing zone. At 0.63 of barrier/water level ratio, sludge in the middle part of sludge settling zone rocked from side to side weakly. And sludge in the lower part became piled up on the bottom over this ratio. After 10minutes of sludge settling, the lower part of sludge settling zone was over 5000mg/L of sludge concentration although intial sludge concentration was 2300mg/L. By using the submerged barrier and the flow types, it could transfer sludge from this to that.

An Input/Output analysis of the transportation industry for evaluating its economical contribution and ripple effect - Forecasting the I-O table in 2003~2009 - (교통부문의 경제적 기여도 및 파급효과 도출을 위한 산업연관분석 연구 - 2003~2009년 산업연관표 중심으로 -)

  • Lim, Siyeong;Kim, Seok;Oh, Eun-ho;Lee, Kyo Sun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.4
    • /
    • pp.12-20
    • /
    • 2015
  • Construction industry has played a pivotal role in the national economy, but the crisis situation of a construction industry has been worse due to the lack of recognition of the contribution of a construction industry. In particular, the transport sector is responsible for a critical function in the movement of humans and material resources, and has a profound impact on national competitiveness and the peoples' welfare, which requires quantitative analysis. In this study, economic contribution and impact of the transportation sector are measured based on the input-output model. Road and railway facilities account for 1.03% and 0.165% of the total industry respectively, and consist of a final demand and total output. Although value-added inducing effect is small, production inducing effect and backward linkage effect has been high. The results in this study will be used as the basic information for validity of investment and policy decisions.