• Title/Summary/Keyword: BOQ (Bill of Quantity)

Search Result 7, Processing Time 0.019 seconds

Estimating on The Construction Costs for Public Kindergarten Buildings (공립단설유치원 신설 소요경비 산정)

  • Park, Sung-Chul;Park, Hee-Won
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.13 no.1
    • /
    • pp.1-14
    • /
    • 2014
  • The purpose of this study is to propose different construction costs based on the number of kindergarten classrooms. Literature review reorganized the space program for kindergartens. For suggesting the room sizes of each spaces, this paper collected the three types of analysis; 1) the previous researches, 2) field survey, and 3) construction drawings. Based on the results, building sizes for the individual class sizes were presented. And, this paper made a standard priced BOQ(Bill of Quantity) through analysis on the existing priced BOQ. Finally, the recommendable construction costs were proposed by applying the building sizes to the standard priced BOQ. The practitioners of school districts and government organizations can make appropriate budgets considering the building sizes.

Automatic Inference of Standard BOQ(Bill of Quantities) Items using BIM and Ontology (BIM과 온톨로지를 활용한 표준내역항목 추론 자동화)

  • Lee, Seul-Ki;Kim, Ka-Ram;Yu, Jung-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.99-108
    • /
    • 2012
  • The rough design information is only available from BIM(Building Information Model) based schematic design. So, it is difficult to obtain sufficient information for generating BOQ. Like 2D design, there are some problems that the results are depend on what the choice of cost estimator. However, the most research of BIM based cost estimation are focus on quantity takeoff, the consideration of work item for generating BOQ is insufficient. Therefore, this paper present automatic inference process of work items in a BOQ using ontology. The proposed process and ontology is validated through applying tiling construction. If the proposed process is utilized, it is expected the basis of developing generation method for consistent BOQ by resolving intervention of cost estimator's arbitrary decision.

A Basic Research for Algorithms of Form Quantity Survey of Green Frame (그린프레임의 거푸집 물량산출 알고리즘 기초연구)

  • Kim, Taekoo;Lim, Chaeyeon;Kim, Sunkuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.193-194
    • /
    • 2014
  • Green Frame is a building frame system composed of precast concrete columns and beams. For the construction to run smoothly, the quantity of frames should be estimated in the planning phase and a plan on production of members should be established in connection with the overall work plan. The algorithm for calculation of the amount of forms used in Green Frame automatically estimates the quantity of forms using the design structure prepared in the design phase. The number and area of forms are calculated using the member size drawn from the structure design. Based on the quantity calculated, the type and area per form size are estimated to be used in preparing BOQ (Bill of Quantity). Thus, the time required for architectural planning and design can be shortened when the algorithm for calculation of the amount of forms is applied. This study is on the basic research of calculating the quantity of forms using the structure design and of the algorithm for calculation of the amount of forms used for production of composite PC members.

  • PDF

An Analysis of the Characteristics of Environmental Impact for PSC Beam Bridges using Life Cycle Assessment (LCA 기반 PSC 교량의 환경부하 특성분석에 대한 연구)

  • Cho, Namho;Yun, Won Gun;Lee, Wan Ryul;Kim, Kyong Ju
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.2
    • /
    • pp.297-305
    • /
    • 2016
  • This study aims to analyze characteristics of environmental load for the construction phase of PSC beam bridge based on Life Cycle Assessment. For detail computation of environmental load, the construction materials and energy consumption are derived from the BOQ, also connecting with environmental load by Korea LCI Database Information Network. The characteristic of environmental impact was analyzed by 25 cases and cut-off ratio was 80% to 94%. The result sorted by construction materials revealed that environmental load were 53.3% for ready-mixed concrete, 9.6% for wire rod, 7.8% for rebar, 6.8% for cement, 5.5% for plywood, and 5.2% for energy. Furthermore, the result of environmental impact revealed that 45.5% for global warming, 30.4% for abiotic resources depletion, 10.5% for human toxicity, and 8.9% for photochemical oxidant creation. In the future, we can make a decision considering environmental load based on LCA at design phase.

Study on the Application of 3D-based BIM for School Facilities to Increase Cost Management Efficiency (교육시설물 공사비 관리 효율화를 위한 BIM 적용방안에 관한 연구)

  • Kwon, O-Bin;Son, Jae-Ho;Lee, Seung-Hyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.6
    • /
    • pp.49-60
    • /
    • 2010
  • Cost Estimating allows each entity in a construction project to plan, distribute, and control its required construction cost for the project. However, existing 2D design based estimating has problems, such as inaccuracy and inefficiency caused by missing, duplicated, or erroneous calculations. In this situation, current estimations for school facilities have more difficulties in forecasting construction costs due to an inadequate work breakdown structure for BOQ (Bill of Quantity) and insufficient guidelines for Basis of Estimate. In this study, therefore, an effort was made to increase the efficiency of estimating for school facilities by applying a 3D modeling based BIM tool to quantity and cost estimates. In addition, this study suggested a reasonable work breakdown structure for BOQ that was appropriate when 3D modeling was applied, and verified it through a case study. The authors tried to provide a BIM-based estimating method for school facilities to obtain greater accuracy and efficiency by having more information in an earlier stage.

INTEGRATED LIFE-CYCLE COST ANALYSIS CONSIDERING ENVIRONMENTAL COSTS: A HIGHWAY PROJECT CASE

  • Woo-Sik Jang;Heedae Park;Sungmin Kim;Seung Heon Han;Jong Seo Jeon
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.273-279
    • /
    • 2011
  • Concerns over the environment have spawned a number of research studies in the construction industry, as the construction of built environments and large infrastructures involves diverse environmental impacts and loads of hazardous emissions. Many researchers have attempted to quantify these environmental loads, including greenhouse gases, carbon dioxide, nitrogen dioxide, and sulfur dioxide, to name a few. However, little research has been conducted regarding integrating the life-cycle assessment (LCA) of environmental loads with the current life-cycle cost analysis (LCCA) approach. This study aims to estimate the environmental loads as a monetary value using the European Climate Exchange (ECX) rate and, then, to integrate those impacts with the pure construction cost. Toward this end, this study suggests an integrated approach that takes into account the environmental effect on the evaluation of the life-cycle cost (LCC). The bill of quantity (BOQ) data of a real highway project are collected and analyzed for this purpose. As a result, considering the environmental loads in the pavement process, the total LCC increased 16% from the traditional LCC cost. This study suggests an integrated approach that will account the environmental effect on the LCC. Additionally, this study is expected to contribute to better decision-making, from the perspective of more sustainable development, for government as well as for contractors.

  • PDF

An Integrated Cost and Schedule Control Process Model Using Earned Value Management System (EVMS를 활용한 공정-공사비 통합관리 프로세스모델)

  • Baek Seung-ho;Kim kyung-rai;Lee Yu-Seb;Lee yong-gyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.2 s.2
    • /
    • pp.89-97
    • /
    • 2000
  • This research has been Initiated to provide an effective management tool for budget control of the public projects using EVMS. Barriers to implementing the tool for the domestic public projects are identified : no PMB (Performance Measurement Baseline) for budget control, management by BOQ(bill of quantity), no systematic planning and control. To eliminate these barriers, an integrated cost and schedule management process model using EVMS is proposed. This model is composed of six sub processes : organizing, scheduling, budget allocating, establishing PMB, managerial analysis, change incorporation.