• Title/Summary/Keyword: BIM-based project management

Search Result 209, Processing Time 0.024 seconds

Development of Rule-Set Definition for Architectural Design Code Checking based on BIM - for Act on the Promotion and Guarantee of Access for the Disabled, the Aged, and Pregnant Women to Facilities and Information - (BIM 기반의 건축법규검토를 위한 룰셋 정의서 개발 - 장애인,노인,임산부 등의 편의증진 보장에 관한 법률 대상으로 -)

  • Kim, Yuri;Lee, Sang-Hya;Park, Sang-Hyuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.6
    • /
    • pp.143-152
    • /
    • 2012
  • As the Public Procurement Service announced the compulsory of BIM adaption in every public construction from 2016, the importance of BIM is increasing. Besides, automatic code checking takes significance in terms of the quality control for BIM based design. In this study, rule-sets were defined for Act on the Promotion and Guarantee of Access for the Disabled, the Aged, and Pregnant Women to Facilities and Information. Three analytic steps were suggested to shortlist the objective clauses from the entire code; the frequency analysis using project reviews for architectural code compliance, the clause analysis on quantifiability, and the analysis for model checking possibilities. The shortlisted clauses were transformed into the machine readable rule-set definition. A case study was conducted to verify the adaptiveness and consistency of rule-set definitions. In future study, it is required the methodologies of selecting objective clauses to be specified and its indicators to be quantified. Also case studies should be performed to determine the pre-conditions in modeling and to check interoperability issues and other possible errors in models.

A Study on Applying Information Framework for BIM Based WBS -Focusing on Civil Construction- (BIM기반의 WBS 구축을 위한 정보프레임워크 도입방안 연구 -토목사업의 적용을 중심으로-)

  • Nam, Jeong-Yong;Jo, Chan-Won;Park, So-Hyun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.11
    • /
    • pp.770-777
    • /
    • 2017
  • Building information modeling (BIM) has been receiving attention as an integrated information model instead of CAD since the 2000s. BIM technology was first used in the architectural field and was later introduced to the civil engineering field. However, the government announced a plan for the application of BIM to 20% of all SOC projects from 2020, so the adoption of BIM technology is expected to accelerate. In order to successfully adopt BIM, a systematic structure should be supported for integrated design information and implementation technology. Also, it is important to establish the relationship between information systems because many complicated factors are intertwined in the construction industry. In this study, we propose a framework for constructing integrated information through identifying the information relations for introducing BIM in the civil engineering industry. We applied this framework to a bridge project to confirm its effectiveness. This study can be applied to the integrated management of the construction process and costs by introduction of a work breakdown structure (WBS) to BIM. In addition, this study is expected to contribute to the adoption of BIM in the civil engineering field through the proposal of information system standardization in this field.

Virtual Reality Safety Training on Multiple Platforms

  • Bao, Quy Lan;Tran, Si Van-Tien;Nguyen, Truong Linh;Park, Chansik
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1187-1193
    • /
    • 2022
  • A construction site is a highly complex and constantly changing environment, where hazardous areas are difficult to detect if workers lack sufficient knowledge and awareness. Thus, frequent worker safety training is required. Numerous studies on using virtual reality (VR) for safety training were published. While they demonstrate the potential for improving the skills necessary to avoid accidents in the construction industry, they remain difficult to apply at actual construction sites. VR requires specialized hardware and software, limiting workers' access and restricting workers' participation in training sessions. As a result, this paper proposes multiple platforms for immersive virtual reality safety training (VRMP) based on Industry Foundation Classes (IFC) and web technologies such as immersive web (WebXR). The VRMP is compatible with mobile and desktop devices currently by workers and demonstrates scenario models familiar to workers. Also, it reduces development time by utilizing Building Information Models (BIM). Additionally, The VRMP collects data from workers in a virtual environment to assess each worker's safety level, assisting workers in effectively and comfortably gaining a better understanding and raising their awareness. This paper develops a case study based on the VRPM in order to assess its effectiveness.

  • PDF

Establishment of Integrated Design Bases Management System of APR1400 Using BIM based Algorithm (BIM기반 Algorithm을 활용한 APR1400 설계기준 통합관리 체계 구축)

  • Shin, Jaeseop;Choi, Jaepil
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.5
    • /
    • pp.52-60
    • /
    • 2019
  • The APR1400 is a 1400MWe nuclear power plant developed through national technology development project over a period about 10years. Approximately 65,000 design drawings are produced for APR1400 construction. In order to maintain consistency among numerous drawings, the highest level of design bases drawings (DBDs) are created according to design bases and this is used in the subsequent design. However, DBDs are produced and managed on a document basis and they are managed various field, it was difficult to accurately reflect the design bases information in the subsequent design. Therefore, this study recognizes limitations of the document based DBDs and develops a system that can accurately reflect the design bases information to subsequent design by adopting BIM based design bases integrated information system. Especially, by introducing DBIL(Design Bases Information Layer) concept, DBIL was created and analyzed based on five design bases(Physical protection, Fire protection, Internal missile protection, Internal flood protection, Radiation protection) applied to APR1400. In the final result DBIL set and Datasheet are integrated of room, design bases information, building data(wall, slab, door, window, penetrations). So it can be used for subsequent design automation and design verification. Furthermore, it is expected that APR1400 DBILs data can be used extensively in constructability and design economics analysis through comparison with next generation nuclear power plant.

A Case Study of BIM-based Framework on Constructability Tasks (BIM기반 골조공사의 시공성분석 업무 적용사례에 관한 연구)

  • Lee, Seung-Il;Kwon, Nam-Ha;Cho, Young-Sang
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.5
    • /
    • pp.45-54
    • /
    • 2010
  • Recently more and more construction projects have become high-rise, complex and intelligent. Accordingly, such projects require an integrated management system for tasks, with a lean approach to construction with work processes for management and productivity. In particular, Construction Information Technology (CIT) fields are concerned with Building Information Modeling (BIM), which represents the process of generating and managing building data during its life cycle. Constructability research has progressed for the project goal which is a cost-time-quality of optimization by integrated construction knowledge and experience. However, the current constructability process has not been performed efficiently, as the existing 2D drawings and papers lack consistent and accurate information, it is difficult to share the contents of work, and the use of information is inefficient. This study proposes that the reformation and enhancement of BIM-based constructability work process can lead to brilliant performance in the framework of the construction phase through achieving collaboration between the design team and the workers at the site.

Analysis on Green BIM based Atrium Sizes in the Early Design Stage

  • Jeong, Seung-Woo;Lee, Kweon-Hyoyng;Choo, Seung-Yeon
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.260-266
    • /
    • 2013
  • This study for establishing specific standards of atrium design aims to discuss design of atrium to consider energy performance according to the types of atrium of office building. In order to evaluate a type and a scale of atrium at the early design stage, modeling details of mass design were set as standards of conceptual design. In the experiment, Project Vasari was used to analyze modeling and energy consumption, based on the LOD 100-step suggested by AIA, because there is no guideline to specify a level of modeling details at each design process. From this analysis, the correlation among a simple-typed atrium and scale and energy load was understood, and the followings are the considerations for designing an atrium. First, the single-sided atrium reduced energy the most, and it was followed by three-sided, two-sided, four-sided and continuous-typed ones. On the whole, they could decrease energy by up to about 15%. Also, the atrium with a wide facade facing in the south was more favorable to reduce energy. Second, planning an atria within 10~30% of the whole building area was more energy efficient. Third, rather than the depth, adjusting the length in designing an atrium could reduce cooling and heating loads by 1.5% per 1m. As explained above, energy performance evaluation considering types and planning elements of atrium helps to assess alternatives in a reasonable way. In particular, considering the use of building needs to be preceded to select a type of atrium, although it is also important to consider its planning elements.

  • PDF

A Development Plan for PMIS based on Total Life Cycle (전수명주기를 고려한 PMIS개발 방안)

  • Park, Soo-Choong;Lee, Seong-Gwon;Jung, Kye-Young;Kim, Jae-Jin
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1282-1288
    • /
    • 2011
  • Recently, the demand regarding reliability and safety of the railroad are increased as built to high-speed railway and Driverless LRT systems. Accordingly, effective management of construction projects is being applied, with the introduction and use of PMIS computerized systems. Due to the construction of railways, from the start of PMIS research planning, design, procurement, to construction and commissioning, various expertise is being carefully gathered, and by integrating it into the unified budget ideas and processes, rational, efficient, organized, and manageable financial plans are developed for the computerized system. However, the current PMIS does not take into account the life-cycle. Therefore, this study is to bring attention to the BIM smart BOM-based configuration management for life-cycle through the consideration for railway construction project management.

  • PDF

An Exploratory Study on 3D-based Building Information Management for Multi-User Fire Protection System

  • Kim, Dahee;Cha, Heesung
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1162-1169
    • /
    • 2022
  • As buildings become more and more complicated, the importance of developing and managing facility management information is increasing. In a building fire situation, various information is generated and needed to be quickly shared among participants. However, the current fire response system fails to monitor the relevant information in a real time basis. This study aims to develop a system prototype for fire protection management which can quickly and accurately manage and effectively deliver the pertinent information to the target participants. The research contributes to the efficiency of fire protection endeavors by interpreting both dynamic and static fire information in an appropriate manner.

  • PDF

An Effect Analysis of Subtracting Rebar Volumes in Reinforced Concrete Members on Quantity Take-off (콘크리트 내 철근 부피 공제가 물량산출에 미치는 영향)

  • Kang, Jong-Min;Kim, Seong-Ah;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.6
    • /
    • pp.24-32
    • /
    • 2012
  • Reinforced Concrete is the most dominant structure type for buildings in South Korea. Reinforced Concrete is one of materials having the most cost and quantity at construction projects. It is important to manage concrete quantity so that the total project cost is not affected due to underestimate or overestimate of its quantity. Generally the concrete quantity is taken-off based on the volume of the space inside forms without subtracting volumes of rebar embedded, which cannot be considered to make quite accurate results. Resource waste and extra cost due to over or under estimate of quantity occur since they cannot estimate accurate quantity at practices. Therefore, the objective of this paper is to analyze the effect of the volume for rebars embedded in reinforced concrete members. By comparing the quantity based on the existing method with the one from BIM data, it was found that about 1~2% of quantity discrepancy was observed while the typical concrete waste rate is 1 % at the current practice.

Linking LOD and MEP Items towards an Automated LOD Elaboration of MEP Design

  • Shin, Minso;Park, SeongHun;Kim, Tae wan
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.768-775
    • /
    • 2022
  • Current MEP designs are mostly applied by 2D-based design methods and tend to focus on simple modeling or geometry information expression such as converting 2D-written drawings into 3D modeling without taking advantage of the strength of BIM application. To increase the demand for BIM-based MEP design, geometric information, and property information of each member of the 3D model must be conveniently linked from the phase of the Design Development (DD) to the phase of Construction Document (CD). To conveniently implement a detailed model at each phase, the detailed level of each member of the 3D model must be specific, and an automatic generation of objects at each phase and automatic detailing module for each LOD are required. However, South Korea's guidelines have comprehensive standards for the degree of MEP modeling details for each design phase, and the application of each design phase is ambiguous. Furthermore, in practice, detailed levels of each phase are input manually. Therefore, this paper summarized the detailed standards of MEP modeling for each design phase through interviews with MEP design companies and related literature research. In addition, items that enable auto-detailing with DYNAMO were selected using the checklist for each design phase, and the types of detailed methods were presented. Auto-detailing items considering the detailed level of each phase were classified by members. If a DYNAMO algorithm is produced that automates selected auto-detailing items in this paper, the time and costs required for modeling construction will be reduced, and the demand for MEP design will increase.

  • PDF