Evaluating Effectiveness of BIM-based Idea Bank during VE Workshop

  • Kim, Hojun;Park, Heetaek;Park, Chansik
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.650-651
    • /
    • 2015
  • Value Engineering has been recognized as one of the construction management techniques for improving the value and benefits of whole project. However, due to the lack of the past data and inefficient free-thinking techniques, the idea generation during VE workshop is still inefficient and ineffective. Even though various studies related to theoretical methodology and technical systems relevant to database were conducted, VE team still mainly rely on their experience for idea generation. With this regard, this study suggests an approach of BIM-based idea bank and assesses its effectiveness by interviewing 20 VE experts in the industry. This approach covers the three steps of idea generation, consisting of 1) Developing BIM based VE database, 2) Generating VE ideas, 3) Updating VE ideas. The result showed that the proposed approach has great potentials to support VE team and improve the quality of VE ideas during creativity phase.

  • PDF

Smart Quality Inspection Scheme for Construction Project Using 3D Scanning Technology (3D스캐닝을 이용한 건설공사 스마트 품질점검 방안에 관한 연구)

  • Lee, Don-Soo;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.2
    • /
    • pp.191-198
    • /
    • 2020
  • The several smart construction technologies are being introduced to the construction industry, and among these technologies, a few companies are attempting quality control using 3D scanning and BIM. Therefore, in this study, 3D scanning and BIM were applied to cases of on-site quality inspection to confirm the applicability and utility. As a result, it was confirmed that the quality inspection using 3D scanning and BIM was shorter in time than the previously performed quality inspection and can be realized with less manpower. Therefore, it is considered that 3D scanning and BIM-enabled technologies can be applied to various items of quality inspection.

Development of IFC Standard for Securing Interoperability of BIM Data for Port Facilities (항만 BIM 데이터의 상호운용성 확보를 위한 IFC 표준 개발)

  • Moon, Hyoun-Seok;Won, Ji-Sun;Shin, Jae-Young
    • Journal of KIBIM
    • /
    • v.10 no.1
    • /
    • pp.9-22
    • /
    • 2020
  • Recently, BIM has been extended to infrastructures such as roads and bridges, and the demand for BIM standard development for ports is increasing internationally. Due to the low level of utilization of classification system and drawing standards compared to other infrastructures, and the closed nature of national security facilities, ports have insufficient level of connection and sharing environment among external systems or users. In addition, since the standardization of data for port facilities is not made, it is still necessary to establish an independent DB for each system and to ensure interoperability of data between these systems since it does not have a shared environment among similar data. Therefore, the purpose of this study is to develop and verify IFC, the international standard for BIM, in order to cope with the BIM environment and to be commonly used in the design, construction, and maintenance of port facilities. To this end, we build a standard schema with port-specific Express Notation according to buildingSMART International's standard development methodology. First, domestic and international reference model standards were analyzed to derive components such as space and facilities of port facilities. Based on this, the components of the port facility were derived through the codification, categorization, and normalization process developed by the research team. This was extended based on the port BIM object classification system developed by the research team. Normalization results were verified by designers and associations. Then, IFC schema construction was based on Express-G data modeling based on IFC 4 * 2 Candidate, which is a bridge candidate standard based on IFC4 (ISO16739), and IFC 4 * 3 Draft, which is developed by buildingSMART International. The final schema was validated using the commercialized validation tool. In addition, in order to verify the structural verification of the port IFC schema, the transformation process was verified by converting the caisson model into a Part21 file. In the future, this result will not only be used as a delivery standard for port BIM products, but will also be applied as a linkage standard between systems and a common data format for port BIM platforms when BIM is used in the maintenance phase. In particular, it is expected to be used as a core standard for data exchange in the port maintenance stage.

Analysis of 3D Laser Scanner Input Performance in Structual Safety Diagnosis (구조안전진단에서의 3D 레이저 스캐너 투입 성과 분석)

  • Seong, Do-Yun;Baek, In-Soo;Kim, Jea-Jun;Ham, Nam-Hyuk
    • Journal of KIBIM
    • /
    • v.11 no.3
    • /
    • pp.34-44
    • /
    • 2021
  • This study quantitatively analyzes the work performance of the structural safety diagnosis team that diagnoses pipe racks. To this end, a method for evaluating the performance of the structural safety diagnosis team using the queuing model was proposed. For verification, the case of applying the existing method and the method of introducing a 3D laser scanner for one site was used. The period, number of people, and initial investment cost of each project were collected through interviews with case project experts. As a result of analyzing the performance of the structural safety diagnosis team using the queuing model, it was possible to confirm the probability of delay in the work of each project and the amount of delayed work. Through this, the cost (standby cost) when the project was delayed was analyzed. Finally, economic analysis was conducted in consideration of the waiting cost, labor cost, and initial investment cost. The results of this study can be used to decide whether to introduce 3D laser scanners.

Methods for Quantitative Disassembly and Code Establishment of CBS in BIM for Program and Payment Management (BIM의 공정과 기성 관리 적용을 위한 CBS 수량 분개 및 코드 정립 방안)

  • Hando Kim;Jeongyong Nam;Yongju Kim;Inhye Ryu
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.36 no.6
    • /
    • pp.381-389
    • /
    • 2023
  • One of the crucial components in building information modeling (BIM) is data. To systematically manage these data, various research studies have focused on the creation of object breakdown structures and property sets. Specifically, crucial data for managing programs and payments involves work breakdown structures (WBSs) and cost breakdown structures (CBSs), which are indispensable for mapping BIM objects. Achieving this requires disassembling CBS quantities based on 3D objects and WBS. However, this task is highly tedious owing to the large volume of CBS and divergent coding practices employed by different organizations. Manual processes, such as those based on Excel, become nearly impossible for such extensive tasks. In response to the challenge of computing quantities that are difficult to derive from BIM objects, this study presents methods for disassembling length-based quantities, incorporating significant portions of the bill of quantities (BOQs). The proposed approach recommends suitable CBS by leveraging the accumulated history of WBS-CBS mapping databases. Additionally, it establishes a unified CBS code, facilitating the effective operation of CBS databases.

Productivity Analysis for Strutural Formwork Using 3D BIM (3D BIM을 활용한 골조 거푸집 공사의 생산성 분석에 관한 연구)

  • Choi, Chang-Hoon;Park, Young-Jin;Soh, Ji-Yoon;Kim, Sung-Yeon;Lee, Junbok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.4
    • /
    • pp.292-300
    • /
    • 2014
  • The construction progress control is very important because there are many unexpected factors affecting time schedule delay and cost overruns. A complicated measure including item quantity and inherent time and costs is used to monitor the progress. Another element to be considered is a productivity, which is cost effectiveness because productivity is primarily measured by the costs. Productivity is stated as constant in-place value divided by inputs such as worker-hour. The main purpose of this paper is to analyze the productivity of structural formwork using a 3D BIM. In order to achieve the research objective, an integrated model of a BIM with a daily foreman's report is developed. The quantities being extracted from a 3D model and information are integrated with manpower utilized. The developed model is applied to a case project to measure and analyze the productivity in terms of individual building and work crew team. The results are discussed and further research topics will be addressed.

Application of Lean Theory to BIM-Based Coordination - A Case Study on Process Re-Engineering of MEP Coordination - (린 기법의 BIM 기반 설계조율 프로세스 접목 - 설비전기 설계조율 프로세스 재설계 사례연구 -)

  • Jang, Se-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.1
    • /
    • pp.67-79
    • /
    • 2018
  • This paper provides theoretical deformation of lean concept and its application for usage of building information modeling (BIM) process. Recently, much research is focused on application of lean concept for more efficient usage of BIM. The lean theory and its basic function and feature is based on manufacturing industry. The manufacturing process can be improved by process re-engineering steps of lean concept which consist of the steps of value, value stream, flow, pull, perfection. However manufacturing process and construction process has different characteristics. Due to the differences, five steps of the traditional lean's process re-engineering can't be directly applied to the BIM based engineering process. In order to solve this problem, we conduct analysis on the characteristics of the manufacturing process and BIM based engineering. We propose modified and expanded concept of lean for process re-engineering and the modified theory was applied to the mechanical, electrical and plumbing (MEP) coordination process. Through the proposed 8 steps of methodology, 2D based process was changed to integrated and using BIM based MEP coordination process. In addition, the results showed the potentiality of cost reduction and process improvement. The results of this study can be a foundation for the theoretical combination of lean and a variety part of construction engineering process.

Functional Analysis of 4D CAD System and Improvement of Function for Applying Linear Construction Project (4D CAD시스템의 기능분석 및 선형시설물 적용을 위한 기능 개선 방안)

  • Kim, Hyeon-Seoug;Kang, Leen-Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.9
    • /
    • pp.269-278
    • /
    • 2018
  • In Korea, BIM technology is applied mainly to building construction projects, but is expected to be applied rapidly to civil engineering projects because the government is currently considering the mandatory application of BIM for infrastructure facilities. Because the infrastructure project is processed in a horizontal work area, the application of BIM technology is more useful in the schedule management of the construction phase than the interference management of the design phase. The 4D CAD system is a typical BIM technology applied to the schedule management in the construction phase, but the application to the actual project is limited due to the lack of practical functions. This study examined the functions of four representative 4D CAD systems commercialized so that the selection criterion can be provided according to the characteristics of the project, and suggests that the functions that should be improved to have practicability. As a result of functional analysis, the application characteristics of each system were analyzed and the user convenience was suggested. In addition, a linear 4D simulation methodology was developed to improve the functions applicable to civil engineering projects, and ways to improve the utilization of the infrastructure projects as the construction phase BIM were suggested. In railway and road construction projects, most activities, such as earthwork, bridges, and tunnels proceed along the distance axis in a horizontal space. Therefore, a linear 4D simulation method, in which an activity is expressed along a distance axis, can be more practically useful rather than a simple 4D simulation method with a Gantt chart.

Information Modeling of Railway Track using Information Iinkage of Railway Alignment and Alignment-based Objects (철도 선형중심의 객체 정보연계를 통한 철도 궤도부 정보모델 생성 방안)

  • Kwon, Tae Ho;Park, Sang I.;Shin, Min Ho;Lee, Sang-Ho
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.30 no.6
    • /
    • pp.507-514
    • /
    • 2017
  • As BIM has been widely used in the field of architecture, efforts to apply BIM to civil engineering structures are increasing rapidly. Since commercial BIM softwares are focused on building structure, it is difficult to apply to alignment-based civil infrastructures. In this study, we proposed a method to generate an information model that reflects cant by sharing information between alignment-centered modeling tools and BIM authoring tools to manage information of railway track. The railway track modeling process consists of classifying structures into continuous and non-continuous structures, creating continuous structures by alignment-centered modeling tools, and using the shared alignment information to generate information model of the non-continuous structures. Non-continuous structures were generated by an algorithm that calculates the position and rotation information of each structure based on discretized railway alignment and cant information transmitted to the BIM authoring tools. The availabilities of proposed method were studied by applying to the osong test-line. Using the test model, it was shown that the objects were identified, the properties were extracted, and the quantities of each structure were calculated.

A Case Study of BIM-based Framework on Constructability Tasks (BIM기반 골조공사의 시공성분석 업무 적용사례에 관한 연구)

  • Lee, Seung-Il;Kwon, Nam-Ha;Cho, Young-Sang
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.5
    • /
    • pp.45-54
    • /
    • 2010
  • Recently more and more construction projects have become high-rise, complex and intelligent. Accordingly, such projects require an integrated management system for tasks, with a lean approach to construction with work processes for management and productivity. In particular, Construction Information Technology (CIT) fields are concerned with Building Information Modeling (BIM), which represents the process of generating and managing building data during its life cycle. Constructability research has progressed for the project goal which is a cost-time-quality of optimization by integrated construction knowledge and experience. However, the current constructability process has not been performed efficiently, as the existing 2D drawings and papers lack consistent and accurate information, it is difficult to share the contents of work, and the use of information is inefficient. This study proposes that the reformation and enhancement of BIM-based constructability work process can lead to brilliant performance in the framework of the construction phase through achieving collaboration between the design team and the workers at the site.