• Title/Summary/Keyword: BIM model

Search Result 535, Processing Time 0.026 seconds

A study on the Electronic Delivery Process and the Configuration Functional Modules of Railway Infrastructure BIM Digital Model (철도 인프라 BIM 디지털 모델의 전자납품 프로세스 및 기능 모듈 구성방안 연구)

  • Choi, Gwang-Yeol;Kim, Jin-Young;Choi, Hyung-Lae;Kim, Lee-Hyeon
    • Journal of KIBIM
    • /
    • v.11 no.3
    • /
    • pp.55-66
    • /
    • 2021
  • Recently, Building Information Modeling(BIM) has become a hot topic in the construction industry such as quantity calculation, interference check, process management, and construction cost management. It is also trying to convert the existing 2D design to 3D design and introduce the BIM in various fields, thus, many new deliverable are being presented but there are many issues due to the lack of standard guides on the preparation and delivery criteria for such new deliverable and how to utilize performance data. Therefore, In order to develop the electronic delivery process, we analyzed the process related to the delivery of BIM digital models presented in domestic and international BIM guidelines and the delivery of products from the Korea National Railway. The analysis focused on the list of achievements, delivery process, quality review standards, and the utilization code system of the Korea National Railway through BIM guidelines and the National Railroad Service's business procedures. Based on these analysis results, it presents a plan to construct an functional module of electronic delivery.

A Study on Priority of BIM Introduction Policy - Focusing on Overseas Cases and Analytic Hierarchy Process Analysis - (BIM 도입정책 우선순위에 관한 연구 - 해외 사례와 AHP분석을 중심으로 -)

  • Park, Jin;Yeom, Chun-Ho
    • Journal of KIBIM
    • /
    • v.11 no.2
    • /
    • pp.17-23
    • /
    • 2021
  • BIM (Building Information Model/Modeling) is attracting attention not only as a unit technology, but also as a factor that can promote the transformation of the entire construction industry process. This study aims to investigate the status and cases of policy introduction and legalization of BIM in foreign countries for the advancement of their own construction industry, and to discover policy implications that can be applied to Korea. The first survey uncovered policy elements, and based on this, the second survey conducted an in-depth survey of experts in actual BIM service and research activities. Looking at each priority, BIM standardization, mandating BIM in projects, payment standard establishment, and PQ additional points were given the highest level of importance.

A Study on Development of the Spatial Network Analysis Tool based on Open BIM Technologies (개방형 BIM 기반 공간네트워크 분석도구 개발에 관한 연구)

  • Park, Young-Sup
    • Korean Journal of Computational Design and Engineering
    • /
    • v.17 no.1
    • /
    • pp.7-16
    • /
    • 2012
  • One distinguishing feature of BIM(Building Information Modeling) is the objectification of spatial elements independently, which makes it easy to represent spatial network. From this perspective, this study aimed to develop the spatial network analysis tool based on open BIM technologies. From the literature review, an object model of spatial network with nodes and links and a process model from construction to visualization were established. A prototype system implementing the proposed models, named SNAT(Spatial Network Analysis Tool), was developed in Java platform with using its open source packages. SNAT can create a spatial network from IFC-BIM model, calculate the indices of spatial network analysis, and visualize it with the representing types(map, graph, matrix and table).

Application of Building Information Modeling for Steel Structures (강구조물 건설에서의 Building Information Modeling(BIM)의 도입)

  • Lee Suk-Joo;Cheon Jin-Ho
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2006.04a
    • /
    • pp.192-199
    • /
    • 2006
  • BIM is a collaborative. model-based way to work. Structural BIM is one of the key elements in the building process where the majority of structural information is created. Open BIM interfaces make it possible for all design information to be produced and managed within a single 3D product model. To make structural BIM a reality between owners, general contractors, architects and engineers. the software used need to be open in their communication. We used to Tekla Structures to provide an open environment through standard interfaces and Tekla Open API collaboration. We have developed MCP(machine cutting plan) and PIM(product information management)to provide cutting plan and drawing and manage to B.O.M, Materials, Production, Shipping and Project.

  • PDF

A Methodology of Open BIM-based Quantity take-off for Schematic Estimation of the Frame Work in Early Design Stage

  • Hansaem Kim;Jungsik Choi;Inhan Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.419-425
    • /
    • 2013
  • Recently AEC industry has required construction automation according to becoming large and complex. Thus BIM-based construction project is increased and used in whole fields of AEC industry. Quantity take-off and estimation fields are important factor for decision-making in conceptual and schematic design stages of construction projects. The purpose of this study improves reliability of the estimation through QTO based on Open BIM. Scope and method to apply QTO is to select conceptual design stage through LoD(Level of Detail) in AEC field and to extract information from BIM model through analysis of IFC structure. This study proceeds three step to make BIM model and check the model quality and calculate QTO. The methodology of QTO using IFC is to verify of result in this study and expects utilizing in design stage of construction projects. The result from this study is expected to decrease the risk factor and time of estimation in the project early phase through improving reliability of schematic estimation.

  • PDF

3-Dimensional Modelling of Civil Engineering Structures for 3D Printing and Its Application (3D 프린터 출력을 위한 토목구조물의 3D 모델링 구성 및 활용방안)

  • Park, Sang Mi;Kim, Hyeon Seung;Han, Seon Ju;Kang, Leen Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.6
    • /
    • pp.1109-1117
    • /
    • 2017
  • Recently, 3D printer technology has been attracting attention in various industrial fields, and research papers are being conducted to utilize 3D printers in the construction industry. Actual structures such as bridges and buildings are being printed to 3D printers, and various applications such as mock-up structures using 3D printers are being proposed. In order to utilize 3D printer technology in the construction field, a 3D model is required, and the 3D BIM data produced at the design stage can be printed by a 3D printers, saving the cost and time of 3D model generation. However, 3D BIM data often does not satisfy the conditions for 3D printer output, causing many errors on output. In this paper, authors propose a problem analysis for 3D BIM model output to 3D printer and a method for reducing errors in 3D printing process of 3D BIM model. In addition, this paper presents a practical application of 3D model output from 3D printer.

A Study on the Automation Process of BIM Library Creation of Air Handling Unit - Development of Revit API module for efficiency and uniformity of library creation - (공기조화기의 BIM 라이브러리 생성 자동화 프로세스에 관한 연구 - 라이브러리 생성의 효율성과 통일성 확보를 위한 Revit API 모듈 개발 -)

  • Kim, Han-Joo;Choi, Myung-Hwan;Kim, Jay-Jung
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.4
    • /
    • pp.75-82
    • /
    • 2018
  • BIM(Building Information Modeling) based design process can initiatively conduct a task through all phases from early design step to construction and maintenance step. Also BIM efficiently manage the building's energy by reflecting 3D design and construction life cycle. This paper proposes an efficient process to build AHU's BIM-based library. This study involves analyzing an AHU model for development of design module, and making the template model using the same 12 parts including the shapes of ducts, doors and frames. In consideration of each shape's direction and the status of existence, which are detailed shapes of parts upon making the template model, all the shapes of the AHU model can be expressed. By applying parametric modeling to the template model, a quick and precise modification and transformation can be conducted, thus the efficiency is enhanced. A user selects an AHU model from a 2D model selection program, and extracts shape information. The final AHU shape is completed through the automation work of unnecessary shape deletion by bringing the extracted shape information to the template model. This enables the user to build efficient AHU's BIM-based library, since the quick and precise modification and transformation of the template model are possibile, and all AHU model shapes can be expressed.

An Estimation Model of Historical Cost Using BIM Library for Road Project (도로분야 BIM 라이브러리를 활용한 실적공사비 산정모델 구축)

  • Moon, HyounSeok;Ju, KiBeom
    • Korean Journal of Computational Design and Engineering
    • /
    • v.20 no.4
    • /
    • pp.431-442
    • /
    • 2015
  • Currently, a BIM-based quantity takeoff (QTO) system is mainly focused on architectural projects. To perform this, diverse quantity takeoff methods such as an object-based automatic quantity takeoff, manual quantity and base functions of calculation have widely been utilizing. However, since BIM library for road projects includes structural elements associated with alignment, it is necessary to establish cost estimation system interlocked with historical cost using 3D library by each unit length. Accordingly, the aim of this study is to develop cost estimation model with using a historical cost approach so that it can be utilized in construction planning based on the BIM library for road projects. For this, based on the BIM library for road, the standardized quantity is estimated, and a process for calculating historical cost and a verification model with a 5D simulation was developed by mapping a WBS code with each BIM library object. This can be applied during the approximate cost estimation process in a project planning and an initial design phase for road projects. Besides, it is expected that these results will be utilized in constructing an optimal historical cost estimation process for project libraries.

A Study on the Development of a Construction Field Management Model based on BIM (BIM기반 건설현장 관리모델 개발에 관한 연구)

  • Jun, Young-Woong;Lee, Myoung-Sik
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.127-135
    • /
    • 2010
  • As the amount of construction information used in the growing construction field increases, the importance of efficient construction field management has been growing. Accordingly, this study aims to identifythe application situation and possibility of BIM through theoretical examinations and domestic & overseas case studies of BIM, and attempts to suggest an approach to the formulation of an efficient construction field management model through the implementation of phase-oriented and cooperation entity-oriented analysis in the construction field. In the future, the conclusions of this study should be used to formulate an actual construction field management model and apply it in the field.

(A) study on location correction method of indoor/outdoor 3D model through data integration of BIM and GIS (BIM과 GIS 데이터 융합을 통한 실내외 3차원 모델 위치보정 방안 연구)

  • Kim, Ji-Eun;Hong, Chang-Hee
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.3
    • /
    • pp.56-62
    • /
    • 2017
  • As the need for 3D spatial information increases, many local governments and related industries are establishing map-based 3D spatial information services and offering them to users. In these services, positional accuracy is one of the most important factors determining their applicability to specific tasks. This study studied the location correction method between indoor and outdoor 3D spatial information through the construction of modeling data on a BIM/GIS platform. First, we selected the sites and processed the BIM/GIS data construction with 3 steps. When connecting the BIM model including indoor spatial data and 3D texturing model based on ortho images, mismatches occurred, so we proposed a location correction method. Using the conversion algorithm, the relative coordinate-based BIM data were converted to the absolute positions and then relocated by means of the texturing data on the BIM/GIS platform.