• Title/Summary/Keyword: BIM deliverables

Search Result 9, Processing Time 0.022 seconds

How to automatically extract 2D deliverables from BIM?

  • Kim, Yije;Chin, Sangyoon
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1253-1253
    • /
    • 2022
  • Although the construction industry is changing from a 2D-based to a 3D BIM-based management process, 2D drawings are still used as standards for permits and construction. For this reason, 2D deliverables extracted from 3D BIM are one of the essential achievements of BIM projects. However, due to technical and institutional problems that exist in practice, the process of extracting 2D deliverables from BIM requires additional work beyond generating 3D BIM models. In addition, the consistency of data between 3D BIM models and 2D deliverables is low, which is a major factor hindering work productivity in practice. To solve this problem, it is necessary to build BIM data that meets information requirements (IRs) for extracting 2D deliverables to minimize the amount of work of users and maximize the utilization of BIM data. However, despite this, the additional work that occurs in the BIM process for drawing creation is still a burden on BIM users. To solve this problem, the purpose of this study is to increase the productivity of the BIM process by automating the process of extracting 2D deliverables from BIM and securing data consistency between the BIM model and 2D deliverables. For this, an expert interview was conducted, and the requirements for automation of the process of extracting 2D deliverables from BIM were analyzed. Based on the requirements, the types of drawings and drawing expression elements that require automation of drawing generation in the design development stage were derived. Finally, the method for developing automation technology targeting elements that require automation was classified and analyzed, and the process for automatically extracting BIM-based 2D deliverables through templates and rule-based automation modules were derived. At this time, the automation module was developed as an add-on to Revit software, a representative BIM authoring tool, and 120 rule-based automation rulesets, and the combinations of these rulesets were used to automatically generate 2D deliverables from BIM. Through this, it was possible to automatically create about 80% of drawing expression elements, and it was possible to simplify the user's work process compared to the existing work. Through the automation process proposed in this study, it is expected that the productivity of extracting 2D deliverables from BIM will increase, thereby increasing the practical value of BIM utilization.

  • PDF

Development of Dynamo Algorithm Based on BIM for Direct Sunlight Impact Analysis of Tunnel Outlet (BIM 기반 터널 출구부 직광영향검토 Dynamo 알고리즘 개발)

  • Kwon, Bareum;Yeom, Chunho
    • Journal of KIBIM
    • /
    • v.12 no.4
    • /
    • pp.41-51
    • /
    • 2022
  • BIM was introduced under the leadership of public institutions, and projects such as road, railway, and site creation, including BIM tasks, are currently being ordered. In addition, as the Ministry of Land, Infrastructure and Transport(MOLIT) is pushing for the full design of BIM, public institutions under its jurisdiction are also pushing for the full design of BIM. Full design of BIM means that all designs are done with BIM. Public institutions' BIM guidelines only require BIM deliverables, and there is a limited direction for the BIM design process to respond to traditional design approaches. Therefore, it is necessary to develop a BIM-based design process corresponding to the full design of BIM.

Analysis of Singapore's BIM tender documents for the development of infrastructure BIM guidelines in Korea (국외 BIM 발주지침 분석을 통한 국내 토목 분야 BIM 가이드라인 개발 방향 제시에 관한 연구 - 싱가폴 토목 사업 과업지시서를 중심으로-)

  • Koo, Bon-Sang;Ok, Hyun;Yu, Young-Su;Jung, Rae-Kyu
    • Journal of KIBIM
    • /
    • v.8 no.2
    • /
    • pp.19-28
    • /
    • 2018
  • Recent increase in the interest and adoption of BIM for infrastructure projects has created a need for formal BIM guidelines in the civil engineering domain. Currently a BIM guideline has been developed in Korea exclusively for the road sector. However, the guideline has gaps in the specification of how BIM models should be generated, managed and applied for maximum effect in projects. This study reviewed the guidelines and tender documents of Singapore to determine potential improvements to adopt in Korea. Results showed that Korea's guideline should focus more on process integration as to stipulating BIM deliverables, encourage a common data environment, clearly distinguish between compulsory and selective BIM applications, and require data and models that can be leveraged in the operation phase of the facility.

A Case study on the Remodeling Design through BIM(Building Information Modeling) (BIM을 활용한 리모델링계획 사례연구)

  • Min, Young-Gi;Lee, Jae-Kook
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.12 no.4
    • /
    • pp.125-132
    • /
    • 2012
  • In this study based on BIM(Building Information Modeling) apply for performing efficient remodeling project and utilized. And this study will examine a real project where a BIM based process was used in the remodeling of an single-family homes. In the remodeling design phase of the planning process was conducted for the BIM process modeling, BIM in the remodeling stage while performing the required range and level of the remodeling process were studied. Based on this, communication between client and remodeling designer, participants more expect that smooth and speeds up in remodeling. For client decision support, troubleshooting of remodeling of the design process to be effective in the BIM have been identified. The BIM model and deliverables data used for the remodeling design process of building remodeling is the most effective way, due to the increased efficiency gained in many areas.

Assessment of BIM-Based Government Funded Projects at the Design Phase (BIM 적용 공공 프로젝트 설계단계의 평가 방안에 관한 연구)

  • Shin, Seung-Hyup;Ham, Nam-Hyuk;Kim, Jea-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.213-216
    • /
    • 2010
  • Nowadays BIM(Building Information System) is applied to the public construction delivery system. BIM can help communications between project applicants through the extraction of the exact and prompt information. It also increases the efficiency of planning, construction, economic feasibility and maintenance in the whole project. Due to increasing demands of BIM, project evaluation and its process on the final deliverables have been in major interests. Thus, through the analysis of the current BIM project, characteristics, types and applications have been researched. We have discussed completeness, relationship and planning of BIM data, which are the standards of evaluation.

  • PDF

Development of a Project Design Stage BIM Guide for Project Owners (공공발주자의 설계단계 BIM 발주업무 지원을 위한 가이드 개발 연구)

  • Kim, Min-Woong;Ock, Jong-Ho
    • Korean Journal of Computational Design and Engineering
    • /
    • v.20 no.3
    • /
    • pp.269-280
    • /
    • 2015
  • Although BIM has been recognized as one of the main streams that advance the construction industry worldwide, it is difficult to ensure the quality of BIM data due to the problems such as internal errors of BIM tools and lack of guidelines that enhance design quality. Such problems cause designers, constructors, and project owners to hesitate applying it to their business. The main objective of this research is to develop a BIM guide for public project owners that is to be usable at the design phase of the public projects. To meet the objective, the study invited 10 BIM experts from Korean construction industry and operated workshops with focus group interview methodology. As well, a number of BIM guidelines from the BIM advanced countries were reviewed to identify valuable contents for the guide. There are four main parts in the guide developed: BIM design procurement process guide, Request for Proposal development guide for BIM design, BIM execution plan development and evaluation guide, and BIM output and deliverables review and evaluation guide.

A Study on the Evaluation Items of BIM Process Maturity Measurement Model (BIM 프로세스 성숙도 측정 모델의 평가항목에 대한 연구)

  • Lee, Jae-sung;Ock, Jong-ho
    • Korean Journal of Computational Design and Engineering
    • /
    • v.21 no.3
    • /
    • pp.281-295
    • /
    • 2016
  • Lately, the management of domestic BIM performance is quite lacking, as the evaluation and management data from successful cases of BIM implementation both on projects and in companies, and related effects (time, cost and other physical gains) are not well kept for future use in BIM development. In order to overcome the above obstacles, a systematic approach to evaluating BIM adoption with focus on particular elements like BIM implementation environment and processes, and the physical factors yielded by BIM, is necessary. In this study, objective and detailed assessment indicators and weights that are appropriate for the domestic situation were derived through research for purposes of developing a web-based BIM maturity measurement program that is tailor-made for the Korean construction atmosphere. Through a company's self-maturity measurement, excellent quality of BIM deliverables and output can be achieved and managed. Furthermore, the domestic BIM capacity can gradually increase since design firms' BIM capability can be judged during procurement basing on measurement indicators.

Rule-based Review and Automated Quality Management Process of BIM deliverables for Railway Infrastructures (철도인프라 BIM 성과물의 품질검토 절차 및 룰 기반 적용성 검토)

  • Kang, Jeon-Yong;Hasan, Syed Mobeen;Min, Ji-Sun;An, Joon-Sang;Choi, Jae-Woong
    • Journal of KIBIM
    • /
    • v.12 no.1
    • /
    • pp.23-34
    • /
    • 2022
  • In the current 2D-based design, design reliability is lowered due to interference and inconsistency between plans, errors in drawings and quantities, etc. At the time of transition to BIM-based 3D design, it is necessary to expand the reliability and usability of BIM by eliminating these errors from the design stage through securing the quality of the BIM digital model. Therefore, in the railway infrastructure design stage, the quality management process and standards of the BIM digital model were defined and quality management index were developed. Based on the rule extracted from the quality management index, a pilot quality management was conducted in connection with the commercial Model-Checker rule, problems and improvement plans were derived, and a rule-based automated quality management plan was prepared.

An Analytical Appraisal of Building Information Modelling (BIM) Guidelines to Identify Variations in the Procedures

  • Das, Dakshata;Moon, Sungkon
    • Journal of KIBIM
    • /
    • v.6 no.3
    • /
    • pp.1-14
    • /
    • 2016
  • The usage of Building Information Modelling (BIM) in building projects has enabled improvement in project planning, implementation and collaboration process amongst various stakeholders within architecture, engineering and construction (AEC) industry. However, variations exist in the current practices of BIM implementation and coordination process in the industry. These variations result in inconsistent degree of BIM use across the construction industry. This inconsistency gives rise to several managerial and technological challenges such as data interoperability issues and purposeful integration and exchange of information within the BIM components. In order to tackle the issue, it is essential to analyse the different BIM approaches employed by the industry practitioners. BIM guidelines serve as a critical link between the BIM model, and its subsequent execution. They therefore provide the best reflection of BIM application and processes. This research paper aims to address the variations existing in BIM practices across the construction industry. It includes an extensive study of 21 existing, publicly available BIM-based guidelines in order to establish an understanding of the present state of practice and deduce issues and concerns related to them. All guidelines analysed in this paper are first categorised based on authorship and the release date for efficient comparison. The points of similarity and difference between them are thereby realized and outlined. In addition, the transition of project implementation process from traditional methods to BIM technology is also explained. The existence of inconsistencies in the BIM guidelines reviewed in this paper reflects the need of a BIM 'Code Compliance Check'. The Code Compliance Check will serve as a regulatory project guideline that will further improve the potential of BIM by incorporating a consistent BIM modelling methodology for the entire construction industry.