철도인프라 BIM 성과물의 품질검토 절차 및 룰 기반 적용성 검토 (Rule-based Review and Automated Quality Management Process of BIM deliverables for Railway Infrastructures)

  • 강전용;하산 사이에드 모빈;민지선;안준상;최재웅
    • 한국BIM학회 논문집
    • /
    • 제12권1호
    • /
    • pp.23-34
    • /
    • 2022
  • In the current 2D-based design, design reliability is lowered due to interference and inconsistency between plans, errors in drawings and quantities, etc. At the time of transition to BIM-based 3D design, it is necessary to expand the reliability and usability of BIM by eliminating these errors from the design stage through securing the quality of the BIM digital model. Therefore, in the railway infrastructure design stage, the quality management process and standards of the BIM digital model were defined and quality management index were developed. Based on the rule extracted from the quality management index, a pilot quality management was conducted in connection with the commercial Model-Checker rule, problems and improvement plans were derived, and a rule-based automated quality management plan was prepared.

건설프로젝트 생애주기 BIM 활용 기능도출 및 시스템 구축 -교량공사를 중심으로- (Development of BIM Functions and System for Construction Project Through Project Life Cycle -Focusing on Bridge Construction Project-)

  • 김현승;문현석;최광열;김창학;강인석
    • 한국건설관리학회논문집
    • /
    • 제13권2호
    • /
    • pp.11-24
    • /
    • 2012
  • 최근 공공사업 발주조건에 BIM(Building Information Modeling)이 의무화되고 있고, 실무 도입을 통한 성공 사례가 증가되면서 건설 분야의 BIM 도입이 본격화되고 있다. 그러나 기존의 BIM 관련 연구는 대부분 설계 또는 시공단계에 한정되어 수행됨에 따라 건설프로젝트의 생애주기를 고려하지 못하고 있고, 특정 업무지원 기능 위주로 진행되고 있다. 따라서 본 연구에서는 건설공사 프로젝트의 기획부터 유지관리단계의 생애주기 동안 단계별 BIM 적용이 가능한 통합 BIM 운영 프로세스를 제안하고 이를 토대로 통합 BIM 시스템을 개발한다. 이를 위해 교량공사를 대상으로 수행단계별 정보체계를 분석하여 BIM 활용 기능과 적용 프로세스를 제시하였으며, 이에 근거하여 수행단계별 BIM 운영 시스템을 구축하였다. 연구에서는 개발된 시스템의 실무 적합성 검증을 위해서 사례적용과 건설 실무자의 활용성 설문 조사를 수행하였다. 이러한 BIM 통합 운영체계는 생애주기를 고려한 건설공사의 3차원 기반 통합정보관리체계로 활용성이 기대된다.

Optimal Implementation Strategies of Building Information Modeling for Construction Projects of LH

  • Lee, Ji-Eun
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.60-62
    • /
    • 2015
  • The BIM-based architectural design can be the optimal method to improve all sectors of construction industry and reduce environmental impact through digital technologies. The goals and effects of BIM needs in LH to be newly planned based on the experience of public sectors, which will ultimately contribute to maximization of effectiveness. Referring the excellent case in the UK, the current BIM standards according to maturity level 2 handle the contents related to modeling, collaborative data production, data management and assure BIM data have to be used from building construction to operation and maintenance of buildings. Therefore the strategy for the utilization of BIM for construction projects in LH consisted of three steps; first, the minimization of defects via BIM: second, strengthening the competitiveness of construction and asset management: third, upgrading the system of building production and maintenance control. After this trial, LH can accumulate know-how for building construction to be more costeffective and competitive.

  • PDF

Organizational Transformation Strategies for Adopting Building Information Modeling in the Engineering-Construction Industry

  • Yong Han Ahn;Young Hoon Kwak;Sung Jun Suk
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.94-102
    • /
    • 2013
  • The architecture, engineering and construction (AEC) industry is beginning to utilize Building Information Modeling (BIM), benefiting from the resulting improved visualization and productivity, better coordination of construction drawings, building documents that contain embedded links to virtual information, faster delivery, and lower costs. However, construction firms often face challenges when reorganizing their company structure to take full advantage of these benefits. This paper proposes an organizational structure that will enable engineering-construction firms to successfully adopt and implement BIM for major construction projects. A case study research method is utilized based on in-depth interviews with four BIM directors and vice presidents charged with BIM adoption, implementation and education. Organizational transformation challenges and recommendations are discussed in detail for those considering implementing BIM in the engineering-construction industry. Topics such as organizational changes in the firm, costs and benefits of BIM implementation, strategies of BIM implementation (execution) plan, BIM education, risks and opportunities associated with BIM, BIM software, contract methods, human resource management and new hires, and the future implementation and direction of BIM are discussed in detail.

  • PDF

BIM 기반 지능형 굴삭시스템 (BIM Based Intelligent Excavation System)

  • 김정환;서종원
    • 한국BIM학회 논문집
    • /
    • 제1권1호
    • /
    • pp.1-5
    • /
    • 2011
  • 토공사는 타공종에 비하여 건설공사에서 차지하는 비용 및 공사기간의 비중이 높다. 이에 따라 토공사는 건설공사의 생산성에 높은 영향을 미치게 되는데, 종래의 토공사 시스템에서는 숙련된 굴삭조종자의 휴리스틱스에 의한 토공사 계획 및 토공작업을 수행하는 노동집약적 프로세스를 고수하고 있어 생산성을 높이기 힘든 상황이다. 이러한 당면과제를 극복하고자 본 논문에서는 BIM 기반의 지능형 굴삭시스템을 소개하며 굴삭 작업 계획 생성 시스템, 원격조종 및 자율 굴삭 작업에 필수적인 Human-Machine Interface(HMI), 웹기반 Project Management Information System(PMIS)이 개발되는 과정에서 적용된 BIM 요소기술에 대하여 검토하고, 적용된 결과를 제시하고자 한다.

BIM기반 화력발전시설 유지관리를 위한 EBS(Elements Breakdown Structure)개발 (EBS for BIM based maintenance management of Thermal Power Plant)

  • 김창수;차상훈;지성민
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 추계 학술논문 발표대회
    • /
    • pp.81-82
    • /
    • 2015
  • BIM has been a reliable construction project management tool to handle various kinds of construction information generated in the facility life cycle. To take these advantages, researchers have been promoted numerous studies in a residential, a commercial, and an educational facilities with a large number of on-going projects. However, despite running as the role of essential energy supplier, power plant related BIM research is relatively insufficient than others. In particular, due to the extending of the facility service period and the requirement of the complicated construction project management for 'overhaul' and 'repowering' in the power plant maintenance phase, the needs for using BIM have been increased gradually. For using BIM based maintenance, it is needed to consider an information collecting methods and necessary to develop an appropriate breakdown structure to share information. Therefore, 'EBS' is produced by reviewing the previous research related to BIM and analyzing the repair activities in the maintenance phase. Proposed 'EBS' must be useful not only a judgment between capital expenditure versus revenue expenditure but also appropriate maintenance strategies development for property management.

  • PDF

CM(ConstructionManagement)에의 효율적 BIM활용에 관한 연구 (A Study on the good use of Construction Management Model based on BIM)

  • 민영기;김경준
    • 한국디지털건축인테리어학회논문집
    • /
    • 제10권3호
    • /
    • pp.87-95
    • /
    • 2010
  • The CM(Construction Manager) of D-university has been seeking the advice of my BIM-team to adopt CM(Construction Management) and BIM best practices to improve project delivery results, and has authored best practice reports for spatial validation, BIM, 3D, 4D and 5D performance. Building Information Modeling(BIM) Process, Integration, and Adoption looks at BIM implementation from a company and project level laying out a process for companies to use BIM. Following this studies, participants will be able to: 1. BIM participants has been creating a BIM process diagram for a project, and has been evaluating and selecting process options for a specific BIM project. 2. BIM participants has been describing the roles and responsibilities of participants in the BIM process, and has been communicating the BIM process to management, colleagues, and project stakeholders. 3. BIM participants has been identified consistent factors influencing BIM return on investment at the project level and the company level, and has been outlining a process for BIM adoption on the project level and company level.

BIM기반 공동주택 마감 물량 산출 정확도 연구 (A Study on the Accuracy of BIM-based Quantity Take-Off of Apartment Interior)

  • 이문규;진상윤
    • 한국건설관리학회논문집
    • /
    • 제14권1호
    • /
    • pp.12-22
    • /
    • 2013
  • 건설 산업 생애주기 전반에 걸친 정보를 BIM을 활용하여 관리할 수 있게 되었다. 그 중에서도 BIM기반 물량산출은 공사비와 직결되는 중요한 관리 요소로서 사업 타당성 및 경제성 분석을 위한 필수적인 관리 요소 중에 하나이다. 또한, BIM기반 물량산출 Data는 작업자마다 물량산출 결과가 상이하게 나타날 수 있으므로 BIM모델 구축에 대한 정확한 기준이 필요하다. 이러한 BIM기반 물량 산출은 정보의 신뢰성과 정확도 측면에서 매우 중요하다. 따라서 본 연구에서는 BIM기반 물량산출 결과의 정확도 및 신뢰성을 판단하고, BIM 모델링의 현실적이고 바람직한 방법을 제시하고자 단위세대 내부 마감재를 개별부재와 복합부재로 모델링하여 산출되는 BIM기반 물량산출 결과를 정량적으로 비교 검증하였다. 연구의 결과, 정확한 BIM기반 물량산출을 위해서는 다양한 마감재를 개별부재로 모델링하는 것이 바람직하지만, 작업의 생산성 측면에서 보다 현실적인 BIM기반 물량산출을 위해서는 개별부재와 복합부재를 병용하여 모델링 작업을 실시하는 것이 현실적인 BIM 모델링 방법임이 검증되었다.

대구순환고속도로 제5공구 BIM 시범설계의 신뢰성분석 및 제언 (Analysis of Reliability and Suggestion on BIM design at Daegu Expressway Lot No.5)

  • 설운호;배병훈;박종서;신재철;이근일
    • 한국BIM학회 논문집
    • /
    • 제4권4호
    • /
    • pp.1-12
    • /
    • 2014
  • As interest for visualization and real time processing of construction management information was heightened recently, a diversity of management tools have been developed and corresponding systems also have been changed. In the case of BIM(Building Information Modeling) which is being spotlighted as such kind of management tool, its outcome such as technical innovation and time saving through overseas success case, reducing effect of unnecessary work, and so forth has continuously been established. The BIM in which various information related with life cycle of project are managed with the base of 3D object is useful as an information management tool of construction project which becomes complex and large in its scale. The aim of this paper is analysis or reliability on BIM design for expressway. To solve these issues, this study analyzes the design document, road design handbook, guide. Also this paper performed analysis of reliability 2D vs. BIM quantity calculation. This pilot projects "BIM design at Daegu expressway Lot No.5" lays the foundation for future work on BIM based civil engineering design.

CRITICAL FACTORS FOR ASSESSMENT OF BIM BASED QUANTITY-TAKE OFF

  • Seong-Ah Kim;Chang-Hee Lee ;Sangyoon Chin;Cheolho Choi
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.7-11
    • /
    • 2011
  • Quantity take-off (QT) is one of the most important tasks for determining the total cost of a construction project, and it requires accuracy and reliability for the result. Accuracy and reliability in BIM-based QT are also required to assure the completeness of the result. However, there has been no basis to measure the completeness of the BIM-based QT result. As BIM is increasingly being adopted in the construction industry with a wide variety of purposes, it becomes more important to have a method to improve the completeness of BIM-based QT and criteria to measure it. This research focuses on the hypothesis that the completeness of BIM-based QT relies on the accuracy and reliability of BIM and the BIM-based QT process. As a basic research to determine the completeness of BIM-based QT, this research analyzes and derives factors that affect the completeness of BIM-based QT.

  • PDF