• 제목/요약/키워드: BIM based Architectural Design

검색결과 171건 처리시간 0.027초

PRELIMINARY STUDY REGARDING A DB CONSTRUCTION PLAN TO SUPPORT PERFORMANCE TECHNICAL A REMODELING ELEMENT TO BIM

  • Yong-Hyun Lee;Jong-soon Park;Jong-Sik Lee;Jae-Sauk Lee;Jae-Youl Chun
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1300-1306
    • /
    • 2009
  • If a brief direction and plan for a remodeling project are decided, it may moves to a concrete design step of which to select the most suitable alternative out of applicable compounding devices to reveal dynamic drifting performance. However, the volume of knowledge baseed utility which can refer to systematic evaluation regarding remodeling element technology and the accumulation of realistic cases are not only sufficient, but also short including its system for expression and consistency. Therefore, it may necessary to deliver the main frame which make enables the Owner, designer and builder to get performance technology for applying advanced remodeling element and knowledge based utility. There is a necessity to provide an information with latest made by virtue of modeling in the 3D/4D based on construction-based knowledge etc. which we can use for life cycle of a project, as a prominent way of knowledge based utility. Then, it is sure that remodeling can become more activative by sharing of knowledge based utility formed in electronic 3D/4D which is a systematic and expressed consistently to a performance and applicability in preservation of savings. It is expected for modeling of the 3D/4D in knowledge based utility enables to verify the practicability of each technology on effective application, and the use of technology might be spread widely due its obvious and oriented expressions. Further, this knowledge based utility formed in electronic 3D/4D may applicable for VE process in addition to remodeling design fields.

  • PDF

건축설계에서 융합설계를 위한 디지털 모델과 물리 모델의 역할과 상호보완성 - 건축설계 회사와 교육환경의 사례를 중심으로 - (Synergies between Digital Models and Physical Models in Convergence Design - Case Studies using Projects of Architectural Firms and Educational Environments -)

  • 김도영
    • 한국BIM학회 논문집
    • /
    • 제9권2호
    • /
    • pp.29-44
    • /
    • 2019
  • This paper is to explore examples of complementary use of digital and physical models. The reason for this is to suggest a method for commercializing architectural design considering high technology. These cases are the practical and educational environment in which design processes based on digital computation technology are performed. Also, in this environment, analog design media (eg, physical models) still being used in the design process using digital computing. Indeed, in this environment, designers are exploiting digital and physical models to address the types of risks that can be discovered when designs are implemented and these risks. By analyzing these cases, we define the roles of digital and physical models to visualize and resolve risks. This paper focuses on one of method as "prototyping", which is used in the field of machinery and is a difficult method to carry out in the conventional design process. In particular, designers look for benefits that encourage designers in utilizing current digital computation technologies (eg, parametric design, simulation, building information models, and digital fabrication). Among the roles of the physical model, roles that can not be replaced by the digital model are explored. It is clear that this case-based study has difficulty in generalizing the design method. However, it helps the designers of today's practical and educational environment to verify and design the actual details of construction and operation when applying and developing unfamiliar materials and methods in the field of architecture.

건축 내부 마감부재의 BIM 기반 상세설계 자동화를 위한 실무적 요구사항 분석 (Evaluation of Practical Requirements for Automated Detailed Design Module of Interior Finishes in Architectural Building Information Model)

  • 홍성현;구본상;유영수;하대목;원영권
    • 한국건설관리학회논문집
    • /
    • 제23권5호
    • /
    • pp.87-97
    • /
    • 2022
  • 건축 프로젝트에서 BIM 도입이 활성화되고 있으나 단순 반복적인 모델링 작업과 잦은 설계 오류는 BIM의 실무 활성화의 방해요소로 잔존해 있다. 특히, 건축 내부 마감부재는 가장 많은 상세화 요구사항을 포함하고 있는 만큼 설계품질 확보를 위해 모델링 효율성 증대 및 설계 오류 해결이 중요하다. 효율성 증대를 위한 방안으로 최근 실무에서는 BIM 소프트웨어에 특화된 비주얼 프로그래밍 툴을 활용한 모듈을 개발하여 일련의 반복적인 모델링 작업을 자동화하는 시도가 이루어지고 있다. 그러나 기존의 모듈 개발은 실무적 요구사항을 반영하지 않고 단순히 반복 작업을 대체하는 것에만 집중하고 있기 때문에, 실무 활용도가 떨어지거나 적용 결과물에 대한 전면적인 재검토가 필요한 문제점이 존재하였다. 본 연구는 실무에서 인력 투입량이 가장 많으면서도 오류가 빈번하게 발생하는 벽, 바닥, 천장 부재를 대상으로 비주얼 프로그래밍 기반 자동 상세화 모듈을 구축하였다. 성능 검증을 위해 구축된 모듈을 계획설계 단계의 근린생활시설 BIM 모델에 적용하였으며, 검토 결과 실무적 요구사항이 적절히 반영되었고 수작업 모델링에서 발생하는 오류사항이 적절히 해결된 것으로 확인되었다.

클라우드 컴퓨팅 기술을 활용한 데스크탑 가상화 기반의 BIM 설계 환경 구축에 관한 연구 (A Study of the Establishment of BIM Design Environment based on Virtual Desktop Infrastructure(VDI) of Cloud Computing Technology)

  • 신중환;이규협;권순욱;최규성;고형렬
    • 한국건설관리학회논문집
    • /
    • 제16권4호
    • /
    • pp.118-128
    • /
    • 2015
  • BIM 기술은 현재 빠르게 건설 산업 전반에 적용 및 확산되고 있다. 그러나 고비용의 BIM 인프라, 법령의 부재, 운영 프로세스 등의 문제로 도입 초기의 기대와 달리 그 활용도면에서 만족할 만한 기대치를 채우지 못하고 있다. 설계 단계에서 수행되는 BIM 기술 기반의 협업 설계 인프라 구축은 성공적인 건설 프로젝트를 위한 필수 요소로 볼 수 있다. 현재 BIM은 클라우드 컴퓨팅기술과 결합하여 드로잉, 3D 모델링, 객체 데이터, 속성 정보 등을 생성할 수 있는 서비스 들이 파생되고 있으며 설계 인프라를 위한 핵심으로 떠오르고 있다. 본 논문은 VDI 시스템 환경 설정 및 구축을 통해 BIM 모델링, Viewing, 모델 체크, 마크업 등 BIM을 수행할 수 있는 서버 인프라 서비스 구축 방안을 제시한다. VDI 성능 시스템 테스트를 통하여 BIM 설계 환경에 필요한 가상 머신 리소스를 산정하고 배분하는 방식을 제안하여 클라우드 컴퓨팅 기반 BIM 설계 및 BIM 설계정보를 활용 프로젝트 운영 방향을 제시하고자 한다.

특성화고 전문제도 과목을 위한 BIM 기반 3D 주택설계 수업자료 개발 및 적용 (Development of BIM-based 3D Modeling Instruction Materials and its Application Analysis for Professional Drafting Subject of Specialized Vocational High School)

  • 권세정;유현석
    • 대한공업교육학회지
    • /
    • 제43권1호
    • /
    • pp.1-19
    • /
    • 2018
  • 최근 건설 분야에서 BIM 설계 기술이 의무 적용됨에 따라 실무 현장이나 대학의 건축설계 교육은 3D 모델링 중심으로 크게 변화하고 있다. 그러나 건설 분야 특성화 고등학교에서의 건축설계 교육은 수제도와 2D CAD 중심으로 구성되어 그 변화에 적절하게 대응하지 못하고 있다. 학생들에게는 새로운 건축 설계 흐름에 부합하는 3D 모델링 설계능력을 필수적으로 갖추어야 함에도 불구하고 이를 충족할 수 있는 3D 주택설계 수업자료가 매우 부족한 실정이다. 이 연구는 특성화 고등학교 전문제도 과목을 위한 BIM 기반의 3D 주택설계 수업 자료를 개발하고, 특성화고 학생들에게 적용하여 학생들의 흥미도와 주택설계 과제수행능력이 얼마나 향상되는지를 분석하기 위한 연구이다. 이 연구에 사용되는 3D 주택설계 수업자료는 PDIE 모형 절차에 따라 준비, 개발, 실행, 평가의 4단계를 거쳐 개발하였으며, 가설 검증을 위한 실험설계 모형은 이질통제집단 전후검사설계를 사용하였다. 실험설계 모형에 따라 실험 집단에는 BIM 기반의 3D 주택설계 수업자료를 적용하여 수업을 실시하였으며, 통제 집단에는 2D CAD 기반의 일반적인 주택설계 수업자료로 수업을 실시하였다. 실험 처치는 건설 분야 특성화 고등학교 학생들을 대상으로 실시하였고, 총 12차시의 전문제도 교과 수업에 적용하였다. 실험 처치의 전과 후에는 각각 흥미도와 주택설계 과제수행능력에 대한 검사를 실시하였으며, 검사결과를 바탕으로 독립표본 t-검정을 통해 3D 주택설계 수업자료에 대한 효과를 분석하였다. 이 연구에서 개발된 BIM 기반의 3D 주택설계 수업자료는 학생들의 수업 흥미도를 향상시키는데 효과적이었으며, 기존 2D 기반의 주택설계 수업보다 과제수행능력을 향상시키는 것으로 나타났다.

생성형 AI 기반 초기설계단계 외관디자인 시각화 접근방안 - 건축가 스타일 추가학습 모델 활용을 바탕으로 - (Generative AI-based Exterior Building Design Visualization Approach in the Early Design Stage - Leveraging Architects' Style-trained Models -)

  • 유영진;이진국
    • 한국BIM학회 논문집
    • /
    • 제14권2호
    • /
    • pp.13-24
    • /
    • 2024
  • This research suggests a novel visualization approach utilizing Generative AI to render photorealistic architectural alternatives images in the early design phase. Photorealistic rendering intuitively describes alternatives and facilitates clear communication between stakeholders. Nevertheless, the conventional rendering process, utilizing 3D modelling and rendering engines, demands sophisticate model and processing time. In this context, the paper suggests a rendering approach employing the text-to-image method aimed at generating a broader range of intuitive and relevant reference images. Additionally, it employs an Text-to-Image method focused on producing a diverse array of alternatives reflecting architects' styles when visualizing the exteriors of residential buildings from the mass model images. To achieve this, fine-tuning for architects' styles was conducted using the Low-Rank Adaptation (LoRA) method. This approach, supported by fine-tuned models, allows not only single style-applied alternatives, but also the fusion of two or more styles to generate new alternatives. Using the proposed approach, we generated more than 15,000 meaningful images, with each image taking only about 5 seconds to produce. This demonstrates that the Generative AI-based visualization approach significantly reduces the labour and time required in conventional visualization processes, holding significant potential for transforming abstract ideas into tangible images, even in the early stages of design.

Case Study of Concrete Surface Design and Construction Method for Freeform Building Based on BIM -Focused on Tri-Bowl, Korea-

  • Ryu, Han-Guk;Kim, Sung-Jin
    • 한국건축시공학회지
    • /
    • 제12권3호
    • /
    • pp.347-357
    • /
    • 2012
  • While it is generally possible to install curved panels manufactured in a factory within the permitted error range on an irregular surface frame of concrete or steel, it is difficult and expensive. Freeform architecture is thus designed and constructed differently from formal buildings. In order to more easily and inexpensively actualize freeform architecture, Building Information Modeling (hereinafter referred to as BIM) has recently been applied in the construction industry. However, the related research and case analyses are not sufficient to identify the implications and contributions of freeform buildings in future similar projects. Therefore, this research will study design and construction methods for freeform surfaces, particular the concrete surface frame of freeform buildings based on BIM, focused on the Tri-Bowl project. This study attempts to analyze the pros and cons of each method for the concrete surface frame of the Tri-Bowl, and then presents the lessons learned and implications related to the design and construction process of the freeform architecture. Several implications for design and construction of concrete surface frame of the freeform building, the Tri-Bowl, are found. The first is that manufacturing and installation of a curved concrete frame is precisely performed based on the exact numerical values of materials and installation made using BIM 3D technologies, such as CATIA and Rhino. The second is that close and continuous collaboration among the different participants in the construction of the Tri-Bowl allowed them to cope with virtual conditions. The third is that design and construction processes have changed, and high quality of the surface frame of a freeform building is required.

BIM기반 에너지절약계획서 건축부문 부분자동화 작성 시스템 제안 - BIM 소프트웨어와 EXCEL VBA를 이용한 자동화과정을 중심으로 - (A Proposal for Partial Automation Preparation System of BIM-based Energy Conservation Plan - Case Study on Automation Process Using BIM Software and Excel VBA -)

  • 류재호;황종민;김솔이;서화영;이지현
    • 한국BIM학회 논문집
    • /
    • 제12권2호
    • /
    • pp.49-59
    • /
    • 2022
  • The main idea of this study is to propose a BIM-based automation system drawing up a report of energy conservation plan in the architecture division. In order to obtain a building permit, an energy conservation plan must be prepared for buildings with a total floor area of 500m2 or more under the current law. Currently, it is adopted as a general method to complete a report by obtaining data and drawings necessary for an energy conservation plan through manual work and input them directly into the verification system. This method takes a lot of effort and time in the design phase which ultimately increases the initial cost of the business, including the services of companies specialized in the environmental field. However, in preparation for mandatory BIM work process in the future, it is necessary to introduce BIM-based automatic creation system that has an advantage for shortening the whole process to enable rapid permission of energy-saving designs for buildings. There may be many methods of automation, but this study introduces how to build an application using Dynamo of Revit, in terms of utilizing BIM, and write an energy conservation plan by automatic completion of report through Dynamo and Excel's VBA algorithm, which can save time and cost in preparing the report of energy conservation plan compared with the manual process. Also we have insisted that the digital transformation of architectural process is a necessary for an efficient use of our automation system in the current energy conservation plan workflow.

공간정보를 중심으로 재구성한 BIM 기반 형상정보의 자동추출 및 데이터베이스 구축 모듈 개발 (The development of module for automatic extraction and database construction of BIM based shape-information reconstructed on spatial information)

  • 최준우;김신;송영학;박경순
    • 대한건축학회연합논문집
    • /
    • 제20권6호
    • /
    • pp.81-87
    • /
    • 2018
  • In this paper, in order to maximize the input process efficiency of the building energy simulation field, the authors developed the automatic extraction module of spatial information based BIM geometry information. Existing research or software extracts geometry information based on object information, but it can not be used in the field of energy simulation because it is inconsistent with the geometry information of the object constituting the thermal zone of the actual building model. Especially, IFC-based geometry information extraction module is needed to link with other architectural fields from the viewpoint of reuse of building information. The study method is as follows. (1) Grasp the category and attribute information to be extracted for energy simulation and Analyze the IFC structure based on spatial information (2) Design the algorithm for extracting and reprocessing information for energy simulation from IFC file (use programming language Phython) (3) Develop the module that generates a geometry information database based on spatial information using reprocessed information (4) Verify the accuracy of the development module. In this paper, the reprocessed information can be directly used for energy simulation and it can be widely used regardless of the kind of energy simulation software because it is provided in database format. Therefore, it is expected that the energy simulation process efficiency in actual practice can be maximized.

BIM기반의 초고층 빌딩 내부마감 개략견적 코스트모델 개발 (Framework of Conceptual Estimation Model for BIM based Internal Finishes of High-rise Building Project)

  • 정수완;권순욱
    • 한국건설관리학회논문집
    • /
    • 제15권2호
    • /
    • pp.53-61
    • /
    • 2014
  • 건설 프로젝트는 생산과정 이전에 설계도면을 바탕으로 예상되는 비용이 산정되며, 기획단계는 소요예산을 책정하고 설계단계는 예산에 합당한 효율적 대안을 찾으며, 정확한 입찰금액을 예측하기 위해 수차례 이루어진다. 특히, 물량산출 이전까지 예측되는 공사비의 정확도와 신뢰도는 매우 중요하다. 그러나 국내의 경우 면적당 단가 방식 공사비 예측을 벗어나지 못할 뿐 아니라, 단계별 예측방법, 프로세스, 데이터 분석 및 관리기술 등이 표준화되어 체계적이고 종합적으로 관리되지 못하고 있다. 그리고 복합용도 프로젝트에서의 견적은 그 사례도 적고 단가정보를 얻기가 매우 어렵다. 이에 국내 복합용도 프로젝트 공사비 예측기술 및 관리기술 발전을 위하여 BIM의 공간정보를 활용한 내부마감 개략견적 코스트 모델을 개발하여 제시하였다.