• Title/Summary/Keyword: BIM Use

Search Result 292, Processing Time 0.024 seconds

A Development Plan for PMIS based on Total Life Cycle (전수명주기를 고려한 PMIS개발 방안)

  • Park, Soo-Choong;Lee, Seong-Gwon;Jung, Kye-Young;Kim, Jae-Jin
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1282-1288
    • /
    • 2011
  • Recently, the demand regarding reliability and safety of the railroad are increased as built to high-speed railway and Driverless LRT systems. Accordingly, effective management of construction projects is being applied, with the introduction and use of PMIS computerized systems. Due to the construction of railways, from the start of PMIS research planning, design, procurement, to construction and commissioning, various expertise is being carefully gathered, and by integrating it into the unified budget ideas and processes, rational, efficient, organized, and manageable financial plans are developed for the computerized system. However, the current PMIS does not take into account the life-cycle. Therefore, this study is to bring attention to the BIM smart BOM-based configuration management for life-cycle through the consideration for railway construction project management.

  • PDF

Hue-assisted automatic registration of color point clouds

  • Men, Hao;Pochiraju, Kishore
    • Journal of Computational Design and Engineering
    • /
    • v.1 no.4
    • /
    • pp.223-232
    • /
    • 2014
  • This paper describes a variant of the extended Gaussian image based registration algorithm for point clouds with surface color information. The method correlates the distributions of surface normals for rotational alignment and grid occupancy for translational alignment with hue filters applied during the construction of surface normal histograms and occupancy grids. In this method, the size of the point cloud is reduced with a hue-based down sampling that is independent of the point sample density or local geometry. Experimental results show that use of the hue filters increases the registration speed and improves the registration accuracy. Coarse rigid transformations determined in this step enable fine alignment with dense, unfiltered point clouds or using Iterative Common Point (ICP) alignment techniques.

A Study on the Improvement of Practice-based Construction Quantity Takeoff Educational Contents (실무 기반 건축공사 물량산출 교육용 컨텐츠 개선 방안에 관한 연구)

  • Park, Ji-Hwan;Choi, Chang-Hoon;Han, Choong-Hee;Lee, Junbok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.217-218
    • /
    • 2015
  • There are various standards and manuals on the quantity takeoff for construction estimation. However, a lot of time and money has been spent on retraining because of difference between practice and education. Therefore, the main purpose of this paper is to suggest improvement to analyze problems and limitations of the existing educational content for quantity takeoff. In order to achieve research objective, comparative analysis for quantity takeoff contents is carried out. This study will be extended to assist in effective quantity takeoff in building projects by supplementing the existing issues with quantity takeoff contents and developing a BIM-based quantity takeoff multimedia contents that use diverse media to increase the understanding on the subject for a non-professional.

  • PDF

A Study on Application of CPLM using Process Model of the Pre-design stage (건축 기획단계 프로세스 모델의 CPLM 적용에 관한 연구)

  • Park, Do-Young;Jun, Yeong-Jin;Moon, Sung-Kon;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.205-208
    • /
    • 2009
  • The purpose of this study is to apply the process model of the pre-design stage to CPLM(Construction Project Life-cycle Management). Life-cycle consists of 4 stage; Pre-design, Design, Construction, Maintenance. Each stage has organic relations between front and rear stage. Therefore it is important to manage and use the information data of each stage. But these data are not carried to the next stage smoothly, especially at the pre-design stage. It is even vague to define the process of the pre-design stage. To carry and share the information well, this study defines Pre-design stage process and CPLM at first, VA-Cityplanner which is the development system of the pre-design process model is applied to CPLM for the smooth current of the data between participants.

  • PDF

A Methodological Shift in Building Design through Development of Collaborative Design Platforms

  • Schumacher, Jonatan;Naugle, Matthew
    • International Journal of High-Rise Buildings
    • /
    • v.3 no.4
    • /
    • pp.279-283
    • /
    • 2014
  • This paper introduces two platforms created by the development team at CORE studio, Thornton Tomasetti's global innovation studio. Collaborative platforms change the way that parties communicate and develop projects. Wikipedia is one of many great examples for a platform that supports collaborative development of a product - the world's largest encyclopedia. In the AEC industry, no such platform exists that can be used for collaborative development of a building project, and hence, information exchange between the parties involved, and modeling programs used in a project is slow and opaque. The platforms introduced in this paper allow for much greater transparency at all stages of the building design process, and hence improve the flow of information between parties involved in the process, both firm-internal and external. While traditionally, the use of a large number of different modeling and analysis platforms is hard to manage by a project team; this paper introduces methods that strengthen the design process by using a multitude of programs needed in the different building design phases.

A Study on 3D Data Model Development by Normalizing and Method of its Effective Use - Focused on Building Interior Construction - (정규화를 통한 3차원 데이터 모델 구축 및 활용성 향상 방안 연구 -건축 마감 공사 중심으로 -)

  • Lee, Myoung-Hoon;Ham, Nam-Hyuk;Kim, Ju-Hyung;Kim, Jae-Jun
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.10 no.3
    • /
    • pp.11-18
    • /
    • 2010
  • Cost estimation through fast and correct quantity take offs are crucial in the process of construction project. The existing methods for cost estimation are mainly based on 2D-based drawings and the estimation result tends to be different according to the estimator's experience, the quality and quantity of used information and estimation time. To solve these problems, the domestic construction industry have recently tried to use the data extracted from 3D data modeling based on BIM(Building Information Modeling) in order to achieve more accurate and objective cost estimation. However it tends to increase dramatically the quantity of information that can be used in cost estimation by estimators. Therefore in order to achieve quality information data from 3D data modeling, the characteristics of the project should be reflected on the 3D model and it is most important to extract information only for cost estimation from the whole 3D model fast and accurately. Thus this study aims to propose the 3D modeling method through Data Normalization which maximizes the usability of 3D Data modeling in cost estimation process.

Analysis of 3D Building Construction Applications in Augmented Reality

  • Khan, Humera Mehfooz;Waseemullah, Waseemullah;Bhutto, Muhammad Aslam;Khan, Shariq Mahmood;Baig, Mirza Adnan
    • International Journal of Computer Science & Network Security
    • /
    • v.22 no.10
    • /
    • pp.340-346
    • /
    • 2022
  • Construction industry is considered as one of the oldest industries in the world since human came into being and the need of their own space is realized. All this led to make the world a space of many beautiful constructive ventures. As per the requirements of today's world, every industry is recognizing the need for use and adoption of modern as well as innovative technologies due to their benefits and timely production. Now construction industry has also started adopting the use of modern and innovative technologies during their projects but still the rate of adoption is so slow. From design to completion, construction projects take a lot to manage for which technology based solutions have continuously been proposed. These include Computer Aided Design (CAD), building information modeling (BIM) and cloud computing have been proved to be much successful until now. The construction projects are high budgeted, and direly require timely and successful completion with quality, resource and other constraints. So, the researchers observe the need of more clear and technology based communication between the construction projects and its constructors and other stakeholders is required before and during the construction to take timely precautions for expected issues. This study has analyzed the use of Augmented Reality (AR) technology adopting GammaAR, and ARki applications in construction industry. It has been found that both applications are light-weighted, upgradable, provide offline availability and collaborative environment as well as fulfil most of the requirements of the construction industry except the cost. These applications also support different screen size for better visualization and deep understanding. Both applications are analyzed, based on construction's application requirements, usability of AR and ratings of applications user collected from application's platform. The purpose of this research is to provide a detail insight of construction applications which are using AR to facilitate both the future developers and consumers.

Freeform 3D Coordinate Control Technology using CNC Twisted Tube Method -Focused on The ARC in DaeGu- (CNC Twisted Tube공법을 이용한 비정형 3차원 좌표제어 기술 -대구 대표물문화관(디아크)를 중심으로-)

  • Kim, Sung-Jin;Ryu, Geun-seok;Ryu, Han-Guk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.227-228
    • /
    • 2012
  • In contemporary architectural practice, flat sections and plan drawings are no longer a primary means of representation and communication with participants. A typical building design has an ornamental exterior wall system and a roof system that should have water-proof quality and drainage function. By comparison, distinction between exterior wall and roof are unclear in freeform buildings, and they are integrated into a concept of a building envelope. This study is to propose 3D coordinate control technology for freeform structure by CNC curved tube method in order to develop a BIM-based envelope design and construction method for freeform building. Because a much wider freeform building construction can be achieved with correct 3D data and easy-to-implement in construction field, the proposed 3D coordinate control technology is highly recommended for practical use instead of the conventional CAD system.

  • PDF

A Study on Standardization Method Establishment of Multi Water-Loop System using Multi Water Resources (다중수원을 활용한 멀티워터 루프시스템의 표준화방안 구축에 관한 연구)

  • Lee, Hyundong;Lee, Joonhyung;Kwak, Pilljae
    • KCID journal
    • /
    • v.21 no.1
    • /
    • pp.109-117
    • /
    • 2014
  • Multi water-loop system is the efficient customer centered facilities of water supply by utilizing the multi water resources. Multi water-loop system is divided into various types. The system is classified potable and non-potable type. Mostly, the potable type utilizes surface water and ground water. However, the non-potable type utilize the multi water resources, such as rain water, sea water, reclaimed water, etc. Selective intake is possible when characteristics of region, physiographic condition and purpose of use are considered. For instance, downtown type, new-city type, agriculture type, island type are available. For development and application of these multi water-loop system, standardization is needed. For standardization, several methods are given; design principles, selection and composition method of multi water-loop system structure, BIM/GIS application method, safety inspection method. Consequently, a road map of design standardization method can be established. In this road map, there are three parts for the standardization of multi water-loop system. Three parts are the considerations, base material and ways of standardization. Design standardization become close when this road map followed by someone who plan the multi water-loop system. In this way, loop system's development is more efficient and economic. In hereafter research, each type's characteristic will be analysed and standardization methods can be established.

  • PDF

A Virtual Environment for Optimal use of Video Analytic of IP Cameras and Feasibility Study (IP 카메라의 VIDEO ANALYTIC 최적 활용을 위한 가상환경 구축 및 유용성 분석 연구)

  • Ryu, Hong-Nam;Kim, Jong-Hun;Yoo, Gyeong-Mo;Hong, Ju-Yeong;Choi, Byoung-Wook
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.29 no.11
    • /
    • pp.96-101
    • /
    • 2015
  • In recent years, researches regarding optimal placement of CCTV(Closed-circuit Television) cameras via architecture modeling has been conducted. However, for analyzing surveillance coverage through actual human movement, the application of VA(Video Analytics) function of IP(Internet Protocol) cameras has not been studied. This paper compares two methods using data captured from real-world cameras and data acquired from a virtual environment. In using real cameras, we develop GUI(Graphical User Interface) to be used as a logfile which is stored hourly and daily through VA functions and to be used commercially for placement of products inside a shop. The virtual environment was constructed to emulate an real world such as the building structure and the camera with its specifications. Moreover, suitable placement of the camera is done by recognizing obstacles and the number of people counted within the camera's range of view. This research aims to solve time and economic constraints of actual installation of surveillance cameras in real-world environment and to do feasibility study of virtual environment.