• Title/Summary/Keyword: BIM Performance Analysis

Search Result 77, Processing Time 0.022 seconds

Development of the IFC based IDF Converter for Energy Performance Assessment in the Early Design Phase (초기 설계단계 에너지 성능평가를 위한 IFC 기반 IDF 변환기 개발)

  • Kim, In-Han;Kim, Ji-Eun;Choi, Jung-Sik
    • Korean Journal of Computational Design and Engineering
    • /
    • v.16 no.2
    • /
    • pp.146-155
    • /
    • 2011
  • As the seriousness of environmental pollution being on a rise, a low carbon and environment-friendly design for energy efficiency has been issued. With respect to energy in the construction industry, an adoption of BIM which is possible for the various energy performance assessments in the early design phase has been actively working on. In the most cases of energy performance assessment, the data compatibility from the lack of standard software and format became a problem and the improvement for data compatibility system has been needed. This study is to develop the IFC based IDF converter as a middleware which connects between BIM software and energy analysis software. For the building energy performance assessment, Energy Plus and IFC are selected for the standard energy analysis software and its file format. Parameters are organized by steps and the integrated material library is built so it is trying to reduce the existing problem of energy software interface as much as possible. The development of IDF Converter will promote the spread of related fields with increasing the BIM standard and the utilization of energy performance assessment.

BIM-DRIVEN ENERGY ANALYSIS FOR ZERO NET ENERGY TEST HOME (ZNETH)

  • Yong K. Cho;Thaddaeus A. Bode;Sultan Alaskar
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.276-284
    • /
    • 2009
  • As an on-going research project, Zero Net Energy Test Home (ZNETH) project investigates effective approaches to achieve whole-house environmental and energy goals. The main research objectives are (1) to identify energy saving solutions for designs, materials, and construction methods for the ZNETH house and (2) to verify whether ZNETH house can produce more energy than the house uses by utilizing Building Information Modeling (BIM) and energy analysis tools. The initial project analysis is conducted using building information modeling (BIM) and energy analysis tools. The BIM-driven research approach incorporates architectural and construction engineering methods for improving whole-building performance while minimizing increases in overall building cost. This paper discusses about advantages/disadvantages of using BIM integrated energy analysis, related interoperability issues between BIM software and energy analysis software, and results of energy analysis for ZNETH. Although this investigation is in its early stage, several dramatic outcomes have already been observed. Utilizing BIM for energy analysis is an obvious benefit because of the ease by which the 3D model is transferred, and the speed that an energy model can be analyzed and interpreted to improve design. The research will continue to use the ZNETH project as a testing bed for the integration of sustainable design into the BIM process.

  • PDF

AUTOMATIC AS-IS BIM EXTRACTION FOR SUSTAINABLE SIMULATION OF BUILT ENVIRONMENTS

  • Chao Wang;Yong K. Cho
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.47-51
    • /
    • 2013
  • Existing buildings now represent the greatest opportunity to improve building energy efficiency. Building performance analysis is becoming increasingly important because decision makers can have a better visualization of their building's performance and quickly make the solution for improving building energy efficiency and reducing environmental impacts. Nowadays, building information models (BIMs) have been widely created during the design phase of new buildings, and it can be easily imported to third party software to conduct various analyses. However, a BIM is not always available for all existing buildings. Even if a BIM is available during the design and construction phases, it is very challenging to keep updating it while a building is aged. A manual process to create or update a BIM is very time consuming and labor intensive. A laser scanning technology has been a popular tool to create as-is BIM. However it still needs labor-intensive manual processes to create a BIM out of point clouds. This paper introduces automatic as-is simplified BIM creation from point clouds for energy simulations. A framework of decision support system that can assist decision makers on retrofits for existing buildings is introduced as well. A case study on a residential house was tested in this study to validate the proposed framework, and the technical feasibility of the developed system was positively demonstrated.

  • PDF

A Framework Development for Sketched Data-Driven Building Information Model Creation to Support Efficient Space Configuration and Building Performance Analysis (효율적 공간 형상화 및 건물성능분석을 위한 스케치 정보 기반 BIM 모델 자동생성 프레임워크 개발)

  • Kong, ByungChan;Jeong, WoonSeong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.1
    • /
    • pp.50-61
    • /
    • 2024
  • The market for compact houses is growing due to the demand for floor plans prioritizing user needs. However, clients often have difficulty communicating their spatial requirements to professionals including architects because they lack the means to provide evidence, such as spatial configurations or cost estimates. This research aims to create a framework that can translate sketched data-driven spatial requirements into 3D building components in BIM models to facilitate spatial understanding and provide building performance analysis to aid in budgeting in the early design phase. The research process includes developing a process model, implementing, and validating the framework. The process model describes the data flow within the framework and identifies the required functionality. Implementation involves creating systems and user interfaces to integrate various systems. The validation verifies that the framework can automatically convert sketched space requirements into walls, floors, and roofs in a BIM model. The framework can also automatically calculate material and energy costs based on the BIM model. The developed frame enables clients to efficiently create 3D building components based on the sketched data and facilitates users to understand the space and analyze the building performance through the created BIM models.

A Study of the Establishment of BIM Design Environment based on Virtual Desktop Infrastructure(VDI) of Cloud Computing Technology (클라우드 컴퓨팅 기술을 활용한 데스크탑 가상화 기반의 BIM 설계 환경 구축에 관한 연구)

  • Shin, Joonghwan;Lee, Kyuhyup;Kwon, Soonwook;Choi, Gyuseong;Ko, Hyunglyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.4
    • /
    • pp.118-128
    • /
    • 2015
  • Recently BIM technology has been expanded for using in construction project. Due to the high-cost of BIM infrastructure development, lack of regulations, lack of process and so forth, usage of BIM has been delayed than initial expectations. In design phase, especially, collaboration based on BIM system has been a key factor for successful next generation building project. Through the analysis of current research trends about IT technologies, virtualization and BIM service, data exchange such as drawings, 3D model, object data, properties using cloud computing and virtual server system is defined as a most successful solution. The purpose of this study is to enable the cloud computing BIM server to provide several main functions such as editing models, 3D model viewing and checking, mark-up and snapshot in high-performance quality by proper design of VDI system. Concurrent client connection performance is a main technical index of VDI. Through testing of test-bed server client, developed VDI system's multi-connect control is evaluated. Performance-test result of BIM server VDI effect to development direction of cloud computing BIM service for commercialization.

Risk Identification and Management Strategies for BIM Projects

  • Ng, Ron C.W.;Cheng, Jack C.P.;Das, Moumita
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.103-113
    • /
    • 2020
  • The construction industry is undergoing a digital transformation in which Building Information Modelling (BIM) is a key technology. The potential of BIM in several areas such as design optimization, time management, cost management, and asset management/facility management (AM/FM) is widely acknowledged by the AECO (Architecture, Engineering, Construction, and Operation) industry around the world. However, BIM implementation in construction projects is faced with problems such as project delay and cost overruns. The lack of identification of risks in BIM projects and standard guidelines on mitigation techniques furthers poor performance, dissatisfaction, and disputes between employers and project participants, which results in low BIM adoption rates. Therefore, the objective of this paper is to identify the potential risks in BIM implementation under the primary categories - (1) technical, (2) contractual, (3) management-related, and (4) personnel-related risks in BIM projects and present solutions to reduce, manage, and mitigate risks. To meet the objective of this paper, a survey was designed and conducted in the Hong Kong construction industry in which over 140 respondents from different disciplines, with experience in BIM projects, have participated. Based on the analysis of the survey data, the most severe and frequently occurring BIM risks and their potential mitigation strategies were identified and discussed in this paper.

  • PDF

A Proposal of BIM Work Process to Support Construct-ability Analysis from Practitioners Viewpoint (현장실무자 관점에서의 시공성 검토 지원을 위한 BIM 업무프로세스 제안)

  • Kim, Dae-Sung;Choi, Hye-Mi;Kim, Ju-Hyung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.6
    • /
    • pp.561-569
    • /
    • 2014
  • In construction site, BIM is used in part of construct-ability review and design mistake checking. However, in a current domestic construction site, except public order project, most of work in private order project has been processing based on 2D work. As an expert resists to certain point in introduction of new technique, it may be shown in the introduction of BIM. For this, We need to analysis construct-ability of introducing BIM, work field of introducing and operational capability about present domestic construction engineers. Therefore, this study solves the problem of existing construct-ability analysis, and it visualizes the various information and objects for an effective job performance. Furthermore, construct-ability analysis by BIM that can use an intergrated management is theoretically examined and practical field-application priority among conclusions is proposed through a survey targeting on the hand-on worker. Therefore, this study suggests a factor supplying for a business-centric introduction plan and support condition.

A Deep Learning Model to Predict BIM Execution Difficulty Based on Bidding Texts in Construction Projects (건설사업 입찰 텍스트의 BIM 수행 난이도 추론을 위한 딥러닝 모델)

  • Kim, Jeongsoo;Moon, Hyounseok;Park, Sangmi
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.6
    • /
    • pp.851-863
    • /
    • 2023
  • The mandatory use of BIM(Building Information Model) in larger Korean public construction projects necessitates participants to have a comprehensive understanding of the relevant procedures and technologies, especially during the bidding stage. However, most small and medium-sized construction and engineering companies possess limited BIM proficiency and understanding. This hampers their ability to recognize bidding requirements and make informed decisions. To address this challenge, our study introduces a method to gauge the complexity of BIM requirements in bidding documents. This is achieved by integrating a morphological analyzer, which encompasses BIM bidding terminology, with a deep learning model. We investigated the effects of the parameters in our proposed deep learning model and examined its predictive validity. The results revealed an F1-score of 0.83 for the test data, indicating that the model's predictions align closely with the actual BIM performance challenges.

Development of Framework for Digital Map Time Series Analysis of Earthwork Sites (토공현장 디지털맵 시계열 변화분석 프레임워크 기술개발)

  • Kim, Yong-Gun;Park, Su-Yeul;Kim, Seok
    • Journal of KIBIM
    • /
    • v.13 no.1
    • /
    • pp.22-32
    • /
    • 2023
  • Due to the increased use of digital maps in the construction industry, there is a growing demand for high-quality digital map analysis. With the large amounts of data found in digital maps at earthwork sites, there is a particular need to enhance the accuracy and speed of digital map analysis. To address this issue, our study aims to develop new technology and verify its performance to address non-ground and range mismatch issues that commonly arise. Additionally, our study presents a new digital map analysis framework for earthwork sites that utilizes three newly developed technologies to improve the performance of digital map analysis. Through this, it achieved about 95% improvement in analysis performance compared to the existing framework. This study is expected to contribute to the improvement of the quality of digital map analysis data of earthworks.

3D BIM-based Building Energy Efficiency Solution for Carbon Emission Reduction (탄소저감을 위한 3D BIM 기반 건물 에너지 효율화 방안)

  • Lee, Dong Hwan;Kwon, Kee Jung;Shin, Ju Ho;Park, Seunghee
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.3
    • /
    • pp.1235-1242
    • /
    • 2013
  • This study deals with the BIM (Building Information Modeling)-based energy performance analysis implemented in EnergyPlus. The BIM model constructed at Revit is updated at Design Builder, adding HVAC models and converted compatibly with the EnergyPlus. We can obtain the input values about HVAC system and building environment such as HVAC system efficient, the number of air changes and energy consumption of equipment on applying GAs (Genetic algorithms). After modification about HVAC system, Optimization about HVAC system energy consumption can be analyzed. In order to maximize the building energy performance, a genetic algorithm (GA)-based optimization technique is applied to the modified HVAC models. Throughout the proposed building energy simulation, finally, the best optimized HVAC control schedule for the target building can be obtained in the form of "supply air temperature schedule". Throughout the supply air temperature schedule is applied to energy performance simulation, we obtained energy saving effect result on simulation.