Proceedings of the Korean Institute of Building Construction Conference
/
2023.05a
/
pp.73-74
/
2023
The purpose of this study is to derive the cause of the quantity difference and present the considerations when take-off rebar quantity based on BIM model by comparing the quantity of rebar based on BIM model with 2D drawing. This research was limited to take-off the quantity of rebars in the building frame work, and after take-off the quantity of rebars by 3D modeling the 2D drawing of the target building with Revit, the quantity difference was compared with 2D-based software. Therefore, when take-off the quantity of rebars based on the BIM model, instead of take-off the existing 2D-based quantity premium proportion, according to general structural consider development length, lap splice length, covering thickness, reinforcing bars and spacing. In the future, this study is expected to contribute to improving the accuracy of BIM-based frame construction quantity take-off.
Korean Journal of Construction Engineering and Management
/
v.25
no.4
/
pp.24-33
/
2024
Recently, as smart construction has become more active, construction companys are evaluating their smart construction capabilities in order to transform into smart construction companies. However, the revitalization of smart construction doesn't only apply to construction companies, the level of utilization of all participants, including owners, designers, construction project managers, and construction company, must be improved. Therefore, this study aims to present a model that evaluate the building information modeling (BIM) utilization level for measuring the BIM utilization level of construction management companies in executing construction project management. In this study, an AHP questionnaire survey targeting BIM practitioners to calculate the weight of each BIM utilization item and score it to construct evaluation model and evaluate it by applying it to construction management companies are conducted. As a result of the evaluation using model, there were differences between companies in the number of BIM users, and in the qualitative evaluation, it is mainly used for interference review, constructability review, and design change management. Therefore, in order to revitalize BIM, it is believed that it is necessary to strengthen BIM utilization ability through separate training for construction manager (CMr) and to present clear utilization standards and scope of work for BIM utilization in performing construction management tasks. Consequently, evaluating more construction management companies using the model presented in this study will result in the transition of CM companies to smart construction and revitalization of BIM adoption.
BIM is one of the means of reducing the economic loss caused by design errors. These features of BIM have led to increased use of BIM. With the increasing use of BIM, several studies have been conducted to analyze the performance of BIM. As the importance of BIM staff is emphasized in the performance analysis of BIM, the human resource allocation of BIM staff can become an important research issue. However, there are few studies to measure the workforce effectiveness of BIM staff. Ham et al (2020) measured BIM workforce efficiency using FCFS queue model rules. Since design errors can have different effects on the project depending on the type, there are design errors that must be dealt with first. Therefore, in this study, a priority queue was used to solve design errors with high priority first. The performance of BIM-based design verification was analyzed by quantitatively analyzing the performance of BIM staff when the priority rule was applied to the design error processing sequence.
Korean Journal of Computational Design and Engineering
/
v.21
no.2
/
pp.130-142
/
2016
BIM library, as a systematic collection of BIM objects where the building information is stored, is a vital factor to construct the BIM based work environment. However, construction business is faced the problems relating BIM library such as the absence of the standard for establishing BIM library, the discontinuity of BIM library's compatibility and the lack of practice applicable BIM library. These problems cause the decreasing work efficiency and the recreating BIM model, by delivering inefficient information required in each stage and application field. The purpose of this study is to suggest the integrated management system for property information of BIM library in order to minimize the reworking and to manage information of each stage and application field when exchanging and sharing information. To achieve this, the BIM information classification, the criteria of property requirements for information exchange in BIM application field and the BIM library management system are developed. This study could contributes to ensuring the reliability and accuracy of results of BIM based analysis and to enhancing the speed of business process with sharing and exchanging building information utilizing a single BIM model.
In the current 2D-based design, design reliability is lowered due to interference and inconsistency between plans, errors in drawings and quantities, etc. At the time of transition to BIM-based 3D design, it is necessary to expand the reliability and usability of BIM by eliminating these errors from the design stage through securing the quality of the BIM digital model. Therefore, in the railway infrastructure design stage, the quality management process and standards of the BIM digital model were defined and quality management index were developed. Based on the rule extracted from the quality management index, a pilot quality management was conducted in connection with the commercial Model-Checker rule, problems and improvement plans were derived, and a rule-based automated quality management plan was prepared.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2008.11a
/
pp.649-653
/
2008
There are many participants in the construction industry compare to other industry, and its productivity is lower than other industry. Therefore this study has understood that BIM (Building Information Modeling) may contribute to the improvement in the productivity at construction sites, and I wish to suggest a BIM application process suitable for the construction industry, To achieve such goal, this study has examined the theory of BIM and has extracted the subjects to be improved through the analysis of the existing construction process, and has suggested the BIM application process to resolve issues of improvement. And to evaluate the application of the improved process, a case study was conducted with the application of commercialized BIM related software. The possibility of application of BIM model in the construction industry, and its influence and the subjects to be resolved, with the application of BIM in Korea, were able to be confirmed. I wish this study may contribute to the application of BIM in the Korean construction industry.
Jo, Jae-Hun;Kim, Dong-Wook;Lee, Kwang-Myong;Nam, Sang-Hyeok
Journal of KIBIM
/
v.3
no.4
/
pp.11-18
/
2013
Modular technology has become a major issue of the construction industries to enhance their productivity. Modular bridge construction generally requires the collaboration between the contractor, designer, fabricator and constructor. Therefore, a readily accessible information model based on BIM technology should be provided for their communication during a construction project life-cycle. In this study, BIM based 3D information modeling was carried out for the modular bridge pier. First, the product breakdown structure (PBS) and level of detail (LOD) of the pier were defined. Based on them, 3D models were created by using parametric modeling method. In addition, database was constructed for the exchange of geometry and property data of 3D models. Finally, application areas of 3D information model were suggested, including the quantity estimation and the 4D simulation.
Korean Journal of Construction Engineering and Management
/
v.17
no.6
/
pp.24-30
/
2016
Building Information Modeling, and its associated work practices, requires project participants to share not only 3D geometric data, but also information in the model that may be considered proprietary and even trade secrets. Thus protection of intellectual property, or BIM copyrights, must be in place for participants to share proprietary information among project stakeholders. Currently Korea does not have adequate copyright laws or mechanisms to provide such protection. This research examined three BIM copyright legal documents, namely U.S.' ConsensusDOCS 301, AIA Document E203/G202, and U.K.'s CIC BIM Protocol to determine how copyright protection is realized, and to formulate appropriate stipulations within the Korean construction context. The resultant requirements include stipulating ownership at to the BIM originator, adopting a license-sublicense scheme, employing a federated model, and use of a formal model delivey table to allocate responsibilities. Given Korea's adoption stage, liability should be minimal, and license revocation should be allowed if payments are not met. The three BIM legal documents focus on practical measures that allow participants to customize requirements for individual projects, and such conventions should be emulated in Korea.
Journal of the Korea Academia-Industrial cooperation Society
/
v.15
no.3
/
pp.1786-1794
/
2014
The purpose of this study is to suggest BIM-based Reference Model(RM) for Urban Facility Management(UFM) System development efficiently. The urban facility management's objective is to take the user convenience and safety from checking the facility to maintain it's function. Recently, to manage the facilities effectively, the BIM technology is being applied to it. In this study, the research trend related to the UFM system is surveyed and analyzed to develop the BIM-based UFM RM. After developing the RM component and process, the BIM-based UFM RM is proposed.
Journal of the Korea Academia-Industrial cooperation Society
/
v.16
no.4
/
pp.2791-2798
/
2015
The purpose of this study is to suggest Process Reference Model(PRM) for BIM/GIS-based Energy Information Modeling(BG-EIM) efficiently. Through the study, the detail process and consideration were derived to design EIM for the purpose of energy analysis depending on specific use-cases. To do this, we survey related studies and analyze the detailed EIM process. By using the results, BIM/GIS-based energy analysis consideration is defined and BG-EIM PRM is proposed.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.