Identification of Major BIM-applicable Tasks with Contribution to Achieving Objectives and Expected Benefit in Construction Stage: Focused on the Case of Public Apartment Housing Projects (목표달성기여도와 예상적용효과에 의한 시공단계 BIM 주요 업무 도출 - 공공부문 공동주택 건설사업 사례를 중심으로 -)

  • Song, Sanghoon;Bang, Jong-Dae;Sohn, Jeong-Rak
    • Journal of KIBIM
    • /
    • v.9 no.3
    • /
    • pp.41-53
    • /
    • 2019
  • As a central part in smart construction, BIM has been rapidly spread in construction industry at large. However, the level of applying BIM in construction stage is still relatively lower than that in design stage due to unclear application method, inadequate design BIM model, technical faults of BIM itself, etc. Under these circumstances, public owners inevitably need to adjust the scope and pace in BIM application considering their internal support and capabilities of contractors. This study aims to suggest major BIM-applicable tasks during construction stage in the process of establishing gradual long-term and short-term introduction strategy for public apartment housing projects. Those major tasks were identified with the combination of the importance of tasks and the future benefits of BIM using IPA method. To do so, the degrees of contribution to achieving objectives in construction, current task execution, and communication requirement were investigated by internal site managers. On the other hand, the expected benefits and current level of using BIM were assessed by BIM experts. Among operational tasks by phases, design review, construction plan review, making as-built drawing, etc. were categorized as major tasks. In addition, progress control, regular meeting, master schedule development, work inspection, on-site quality check, etc. were also drawn as major tasks by management areas. The results of this study will provide the useful reference for owners concerned about the introduction of new technologies.

Improvement of Quantity Take-Off and BoQ through the LOD Criteria Analysis of BIM Models (BIM 모델 표현 수준(LOD) 분석을 통한 내역체계 개선방안 연구)

  • Choi, Hyunjun;Yun, Seokheon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.6
    • /
    • pp.89-97
    • /
    • 2019
  • Recently, BIM has been actively introduced in construction projects. In particular, the introduction of BIM in cost estimating process is expected to improve the accuracy and efficiency of the cost estimate. However, the quantity calculation and BoQ documents preparation process still require manual work. Although the BIM model may support quantification process, it is still problematic that the level of detail of the model must be very detailed to meet the items in BoQ. To address this, it is necessary to analyse the LOD criteria and to analyze the extent to which quantity can be computed according to the level of detail in the BIM model. For the analysis of LOD-based work items, the work item grades were divided into A,B, and C. In this study, the ratio and cost of each item that can be calculated at the LOD level in the detailed design phase are reviewed for each type of work, and the method for improving the quantity calculation using BIM is proposed. In the LOD 300 stage(Detailed design stage), the largest number of items in the class B, the major improvement class, are window and glass work. In addition, the most expensive type of work was analyzed by reinforced concrete work. In the future, it is necessary to suggest appropriate improvement way for items with high item ratios and items with high cost ratios. The results of this study are expected to be used as a BIM-based cost estimation or as basic data for improving the current BoQ system.

Derivation of BIM Project Properties Through an Analysis of On-Line BIM Project Cases (온라인 BIM(Building Information Modeling) 사례 분석을 통한 BIM 프로젝트 속성정보 도출)

  • Lee, Kyungha;Uhm, Miyoung;Lee, Hwayeon;Lee, Ghang
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.194-195
    • /
    • 2015
  • When starting a new project, generally similar existing projet are searched. As Building Modeling Information(BIM) has short history and experience, the dependence on similar project is high. Small and medium sized design companies are depending on website search tool for information of BIM project besides companies maintaining the Database(DB) from lots of project experience. However, the information level and contents provided by websites differ drastically from each other which makes it difficult to utilize the information and apply cases. Furthermore, the different classification system of the sites makes the situation even worse. Therefore, we collected and analyzed over 100 BIM cases from 18 global websites, to develop a system for BIM case application. Result showed that over 90% of our subject pool provided basic information including the construction type, characteristics of the client (public/ private), location of the project, and detailed information such as primary usage. Moreover, the reasons for applying BIM where to solve problems of geometric design, building system like MEP and construction. Furthermore, there was a contrast between cases conducted only within Korea and cases conducted with other countries. While there was almost always helpful information regarding the administrative steps for Korean BIM cases, there was close to no information for projects carried out outside of Korea. These results could contribute to verifying the trend of information provision of the websites for BIM projects data, and this is believed to be helpful for developing an application system for BIM cases which have an organized information provision system and level as well as for bench marking.

  • PDF

A Case Study of Status and Characteristics of the BIM Standard in China (중국 BIM 표준의 현황과 특성에 관한 사례 분석)

  • Shin, Kyoo-Chul
    • Journal of KIBIM
    • /
    • v.8 no.3
    • /
    • pp.20-30
    • /
    • 2018
  • The Standard for BIM in Construction of China was released in 2017. The Unified Standard for BIM of China also took effects on 2017. The BIM standards of China needs to be compared with those related guidelines of Korea to find the status and characteristics for future development of BIM application in both countries' construction industries. The research methodology is a case study of comparing various standards of both countries. The case study results reveals many interesting issues for future BIM application and guidelines for practice of design and construction process. The research foundings include followings : LOD (Level of development) are well defined including LOD 350 in Chinese Standard. P-BIM(Practice based BIM) concepts and series of standards are set for the well-defined design and construction process by work stage in China. Korean standards shows more processes of design and documentation in detail. Major three aspects, particularity in BIM standard by work trade, practicality in BIM work process of design and construction, and professionality in subjects of BIM application, are analyzed and compared with various Guidelines of BIM in both countries.

Open BIM-based quantity take-off system for schematic estimation of building frame in early design stage

  • Choi, Jungsik;Kim, Hansaem;Kim, Inhan
    • Journal of Computational Design and Engineering
    • /
    • v.2 no.1
    • /
    • pp.16-25
    • /
    • 2015
  • Since construction projects are large and complex, it is especially important to provide concurrent construction process to BIM models with construction automation. In particular, the schematic Quantity Take-Off (QTO) estimation on the BIM models is a strategy, which can be used to assist decision making in just minutes, because 70-80% of construction costs are determined by designers' decisions in the early design stage. This paper suggests a QTO process and a QTO prototype system within the building frame of Open BIM to improve the low reliability of estimation in the early design stage. The research consists of the following four steps: (1) analyzing Level of Detail (LOD) at the early design stage to apply to the QTO process and system, (2) BIM modeling for Open BIM based QTO, (3) checking the quality of the BIM model based on the checklist for applying to QTO and improving constructability, and (4) developing and verifying a QTO prototype system. The proposed QTO system is useful for improving the reliability of schematic estimation through decreasing risk factors and shortening time required.

Development of Model Requirements Checklist for Utilizing BIM in Construction Phase - Focused on the MEP - (시공단계 BIM 활용을 위한 모델 요구조건 체크리스트 개발 - MEP를 중심으로 -)

  • Kim, Woojin;Park, Jinho;Cha, Yongwoon;Hyun, Changtaek;Han, Sangwon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.1
    • /
    • pp.22-31
    • /
    • 2019
  • The application of BIM that can manage and integrate information generated during the entire life cycle of buildings in domestic and overseas construction projects is becoming active. When BIM is utilized in the construction phase, it can shorten the construction period, reduce the occurrence of reworks and improve collaboration capability. However, there are limitations in applying BIM to the construction phase due to the insufficient definition level of domestic BIM guidelines and inadequate design standards. In this regard, this study developed BIM model requirements checklist for the application of BIM in the construction phase. To develop the checklists, 21 domestic and overseas BIM guidelines, three public construction projects and four private construction projects to which construction BIM was applied, were analyzed. Based on the guidelines and cases, a total of 62 construction BIM model requirements (31 model objects and 31 attribute rules) and proposed construction BIM model requirement checklists by dividing the 61 requirements according to the requirement and purpose for utilization were identified. It is expected that the practical applications of the checklists proposed in this study will improve the level of BIM model in construction phase. In addition, this study has its significance as a basic research that can be used in the development of standardized guidelines for BIM model in construction phase from academic aspects.

Design of Browser for The Harbor BIM Service Based on Cloud Computing (클라우드 컴퓨팅 기반 항만 BIM 서비스를 위한 브라우저 설계)

  • Chang, Jae-Yeol;Moon, Hyoun-Seok
    • Journal of KIBIM
    • /
    • v.8 no.4
    • /
    • pp.60-71
    • /
    • 2018
  • The port BIM technology has many problems such as lack of relevant system, high cost of BIM infrastructure construction, and process difference of existing domestic inter-industry. Since the port facilities as national key industries are managed and operated by public organizations, it is necessary to integrate IT resources and have a system that needs collective construction and joint utilization management. In this paper, we proposed the convergence of cloud computing technology and BIM as a way to reduce the infrastructure cost required for port BIM operation and to provide various BIM services for domestic process. To do this, we collected system requirements based on demand surveys of port staff and designed a BIM browser that provides IFC-based BIM server and customized services to reduce infrastructure cost in cloud computing environment. In terms of infrastructure, we designed cloud-based IaaS to support cost reduction, which is an essential component, and designed SaaS to support customized services in terms of services. We will perform performance verification with focus on whether port BIM servers and browsers have reached a level where they can manage four BIM models with different types and capacities.

BIM Model Generation at Building Level using Automated Scan-to-BIM Process - Focused on Demonstration of BIM Modeling for Gangwon Fire Service Academy - (Scan-to-BIM 자동화 기술을 활용한 건축물 단위의 BIM 모델 생성 - 강원소방학교 BIM 모델링 실증을 중심으로 -)

  • Park, Jun-Woo;Kim, Jae-Hong;Kim, So-Hyun;Lee, Ji-Min;Choi, Chang-Soon;Jeong, Kwang-Bok;Lee, Jae-Wook
    • Journal of KIBIM
    • /
    • v.11 no.4
    • /
    • pp.53-62
    • /
    • 2021
  • The successful implementation of Scan-to-BIM automation depends on the entire process from scanning of buildings, including indoor facilities and furniture, to generating BIM models. However, the conventional Scan-to-BIM process requires a lot of time, manpower, and cost for the manual generation of BIM models including indoor objects. To solve this problem, this study applied a Scan-to-BIM automation process using a deep learning model and parametric algorithm to an existing building, Kangwon Fire Service Academy. To improve the accuracy of the BIM model, after object data was extracted from the scan data, the data was corrected according to actual object-specific conditions. As a result, the accuracy of the BIM model created by the proposed Scan-to-BIM automation process was 91% compared to the actual area of the construction drawings. In addition, it was confirmed that the BIM objects were automatically generated for 10 object classes.

A Study on the Evaluation Management of Public Housing Architectural Competition using BIM (공공 공동주택의 BIM적용 설계 경기 평가관리에 한 연구 - BIM적용 가능 평가항목 선정을 중심으로 -)

  • Min, Byoung-Jik;Lim, Jae-Bok;Kim, Ju-Hyung;Seo, Jong-Won;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.2 no.2
    • /
    • pp.1-9
    • /
    • 2012
  • In Korea, recently, efforts have been made to introduce BIM(Building Information Modeling) to housing complex projects. However, there have been several problems including excessive competition for building design and outcome-oriented evaluation due to a lack of clear evaluation criteria and poorly organized management process. Under this circumstance, the study surveyed opinions of project managers and conducted a pilot test to improve evaluation criteria of BIM-based design for housing complexes. The objective is to assess the level of BIM technology and its applicability, and to propose a list of reasonable evaluation criteria for better project management. First, the study examined the current condition of evaluation on the BIM-based housing complexes, and identified 15 preliminary items that might be suitable for application of BIM. Second, the study conducted a pilot test for the 15 items to determine their suitability for the level of BIM technology, clarity of the calculation process, and the extent of fulfilling information quality, and short-listed eight items for application of BIM. In particular, in the design concept stage, mostly 3D visual images and area-related items are suitable for BIM-based evaluation. Accordingly, formerly used items such as project cost, energy and environmental analysis, building structure, and facilities were deemed more relevant to the subsequent stages of basic design and its implementation.

A Methodology of Open BIM-based Quantity take-off for Schematic Estimation of the Frame Work in Early Design Stage

  • Hansaem Kim;Jungsik Choi;Inhan Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.419-425
    • /
    • 2013
  • Recently AEC industry has required construction automation according to becoming large and complex. Thus BIM-based construction project is increased and used in whole fields of AEC industry. Quantity take-off and estimation fields are important factor for decision-making in conceptual and schematic design stages of construction projects. The purpose of this study improves reliability of the estimation through QTO based on Open BIM. Scope and method to apply QTO is to select conceptual design stage through LoD(Level of Detail) in AEC field and to extract information from BIM model through analysis of IFC structure. This study proceeds three step to make BIM model and check the model quality and calculate QTO. The methodology of QTO using IFC is to verify of result in this study and expects utilizing in design stage of construction projects. The result from this study is expected to decrease the risk factor and time of estimation in the project early phase through improving reliability of schematic estimation.

  • PDF