• Title/Summary/Keyword: BIM 설계검증

Search Result 71, Processing Time 0.021 seconds

Automation Review of Road Design Standard using Visual Programming (비주얼 프로그래밍 기법을 활용한 도로설계기준 자동검토 방안)

  • Hyoun-seok Moon;Hyeoun-seung Kim
    • Journal of the Society of Disaster Information
    • /
    • v.18 no.4
    • /
    • pp.891-898
    • /
    • 2022
  • Purpose: There is not much time left for mandatory BIM implementation for all sectors and stages of the construction industry. Therefore, it is necessary to find a way to secure technology to substantially improve the productivity of BIM work. In the research, we proposed a method to automatically verify related construction standards for major objects produced by BIM modeling procedures so that engineers can verify construction standards in the BIM-based design process. Method: We defined a modeling work procedure for BIM-based road design work and prepared a method for constructing related design standards in a database. In addition, a process map for developing a BIM-based design basis review automation system was also presented. Result: A BIM-based design standard review automation module was developed using Civil3D and Dynamo. And it was confirmed by the test application that it is possible to quickly judge whether the BIM object manufactured in the design process conforms to the construction design standard. Conclusion: BIM-based design standard review automation technology can improve the productivity of BIM model production work and secure the quality of the BIM model.

BIM-based Design Verification Performance Analysis with Priority Rules Applied (우선순위 규칙을 적용한 BIM 기반 설계검증 성과 분석)

  • Huh, Seung-Ha;Shim, Jae-Hyeong;Ham, Nam-Hyuk;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.11 no.3
    • /
    • pp.1-11
    • /
    • 2021
  • BIM is one of the means of reducing the economic loss caused by design errors. These features of BIM have led to increased use of BIM. With the increasing use of BIM, several studies have been conducted to analyze the performance of BIM. As the importance of BIM staff is emphasized in the performance analysis of BIM, the human resource allocation of BIM staff can become an important research issue. However, there are few studies to measure the workforce effectiveness of BIM staff. Ham et al (2020) measured BIM workforce efficiency using FCFS queue model rules. Since design errors can have different effects on the project depending on the type, there are design errors that must be dealt with first. Therefore, in this study, a priority queue was used to solve design errors with high priority first. The performance of BIM-based design verification was analyzed by quantitatively analyzing the performance of BIM staff when the priority rule was applied to the design error processing sequence.

A Development of Interface Module between Structural Design and Detail Design based on BIM (BIM 기반의 구조설계와 상세설계의 인터페이스 모듈 개발)

  • Eom, Jin-Up;Shin, Tae-Song
    • Journal of Korean Society of Steel Construction
    • /
    • v.23 no.1
    • /
    • pp.113-124
    • /
    • 2011
  • This study concerned the interoperability between the structural-analysis model and the default detail model in steel structures available for the structural-design process based on BIM. The purpose of the study was to develop an interface module that can perform data conversion between the analysis and design applications and the BIM applications, through the dotnet frame work development environment using OpenAPI provided by the BIM application vendor. The direct-link method was applied for BIM interoperability. A basic-frame model for detail design and modeling was created from the structural-analysis model to verify if the application was developed. Finally, the proposed process was compared with the existing process to verify the efficiency of the former.

A Study on the Possibility of 2D Design Drawing Implementation by Revit Architecture (Revit Architecture를 이용한 2D 설계도면 구현 가능성에 관한 연구)

  • Cho, Yong-Sang;Lee, Heewon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.10
    • /
    • pp.5243-5250
    • /
    • 2013
  • BIM(Building Information Modeling) enables 3D model-base management for all information produced by construction project during its life cycle. Also as a national policy, BIM has been institutionalized as design criteria. But, on the matter of 2D drawing using BIM software (Revit Architecture), it has been recognized as difficult to realize the same quality drawing drawn by CAD. The purpose of this study is verifying the possibility of printable design drawing implemented by BIM software at the same quality of 2D shop drawing drawn by 2D CAD. Through the analysis of basic design elements of 3D BIM software and 2D CAD software, with the case of partial cross sectional drawing which is most faithful representation of the basic design elements, this study find out that the 3D BIM software can produce the same quality 2D printable drawing utilizing its implicit function.

Interview - "BIM, Fits well with small and medium-sized architect offices!" (인터뷰 - "BIM, 중소규모 건축사사무소에도 잘 맞는다!")

  • Yuk, Hye-Min
    • Korean Architects
    • /
    • s.615
    • /
    • pp.32-35
    • /
    • 2020
  • 코로나19 이후 건축사업계 비대면 작업 등의 필요성이 대두되면서, 스마트건설 플랫폼 기술인 BIM(Building Information Modeling, 건설정보모델링) 활성화에 관한 목소리도 높아지고 있다. 최근 한국건설기술연구원에서는 공공분야 BIM 기술의 성숙도를 4단계(레벨1~4)로 봤을 때, 우리나라의 평가치는 '레벨1' 초보 수준에 머물러 있다는 진단을 냈다. 이미 '레벨3' 수준에 진입한 영국 등 선진국보다 뒤처져 있다는 분석인데, 이는 2D 환경을 기반으로 설계 또는 시공업무에 대해 제한적으로 BIM을 적용하면서, 일정 규모 이상의 설계BIM만 의무화한 수준이기 때문이다. BIM 트렌드가 '기술개발'에서 '활용' 단계로 넘어가는 과정 가운데 건축분야에서의 활성화 방안은 무엇일까. 월간 '건축사'가 'WBIM(주.더블유빔)'사(社)의 이재환 대표를 만나 BIM의 현장 활용성, 그리고 적용 측면에서의 현실문제 등에 대한 현장 이야기를 들어봤다. 각종 개발사업과 설계파트를 지원하며 BIM전문가로 활동해 온 이재환 대표는 "기획단계부터 BIM을 활용하면 사업 진행 전 과정에서 실시간 검증이 가능하고 동시에 각종 아이디어를 효과적으로 적용할 수 있다"면서도 "활용성을 확보하려면 업계뿐 아니라 발주처, 감독 등도 BIM에 대한 이해도를 높여야 한다"고 말했다.

  • PDF

Establishment of BIM-LCC Analysis System for Selecting Optimal Design Alternative using Open KBIMS Libraries (개방형 KBIMS 라이브러리를 활용한 최적설계대안 선정을 위한 BIM-LCC분석 시스템 구축)

  • Lee, Chun-Kyong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.12
    • /
    • pp.153-161
    • /
    • 2020
  • Building information modeling (BIM) is a smart construction technique that is recognized as essential for current construction facility projects. The Public Procurement Service (a construction project-ordering agency) announced a plan to introduce BIM and has required changing the operation of projects by using BIM design information. LCC analysis is essential for items, quantity, and cost information of the construction, and it is expected that efficient work will be achieved by using BIM design information. In this study, a BIM-LCC analysis system was established for selecting optimal design alternatives by actively using open KBIMS libraries. The BIM-LCC analysis system consists of a single alternative and an optimal alternative LCC analysis, but it has a limitation in that only the architecture and machine libraries have been applied. However, by applying BIM, practical use and work efficiency can be expected. In order to use the method as an LCC analysis support tool with BIM design information in the future, it will be necessary to collect user opinions and improve the UI.

Interface Module Developement of Structural Design for Brace Connections on based BIM (BIM기반의 브레이스 접합부의 구조설계 인터페이스 모듈 개발)

  • Kim, Tae Hyeong;Shin, Tae Song
    • Journal of Korean Society of Steel Construction
    • /
    • v.25 no.2
    • /
    • pp.197-207
    • /
    • 2013
  • This study is aimed at developing the structural design interface module for the brace connections in order to improve the efficiency of the interoperability between structural design and BIM modeling at the construction design phase of steel structures. For this purpose, structural design module is first established according to the algorithm built by structural design standards of domestic and foreign. Then, it is developed interface module which can export the data of 3D model obtained from the BIM design tools to structural design module and feed structural design results back to 3D BIM model. Finally, the efficiency and practicality of the developed interface module is verified by applying to a sample model.

Workflow Procedures and Applications in BIM-based Design for Safety (DfS) (BIM 기반 설계안전성검토의 업무 절차와 활용 방안에 관한 연구)

  • Jaewoong Hwang;Heetaek Yoon;Junhyun Bae;Youngkon Park
    • Land and Housing Review
    • /
    • v.15 no.2
    • /
    • pp.125-137
    • /
    • 2024
  • A conventional Design for Safety (DfS), introduced to eliminate potential hazards in the design phase proactively, has encountered persistent challenges, such as perfunctory risk assessments and hazard identifications based on 2D drawings and inefficient workflow processes. This study proposes a BIM-based approach to Design for Safety (DfS) to address the limitations of conventional methods, aiming to enhance efficiency and achieve practical safety management benefits. The proposed workflow process for BIM-based DfS has been refined and validated for on-site applicability through various case studies, including risk assessments during the design phase and field applications for safety management activities during the construction phase. Specifically, the critical process of risk assessment within the DfS methodology has also been transitioned to a BIM-based approach. This BIM-based risk assessment process has been evaluated through case studies, encompassing safety reviews for structural design, construction equipment operation, and construction methodology with sequence in design projects. Additionally, the proposed BIM-based DfS has demonstrated exceptional on-site applicability and efficiency, as validated by the application of a BIM deliverable embedded in DfS information for CDE-based daily activity briefing, VR-based safety training, AR-based mitigation measures inspections, and other safety management activities in the construction phase.

Development of Augmented Reality Tool for Architectural Design (건축설계 검증을 위한 증강현실 설계지원도구 개발)

  • Ryu, Jae-Ho
    • Journal of the Korea Society of Computer and Information
    • /
    • v.20 no.1
    • /
    • pp.49-62
    • /
    • 2015
  • In this study we have proposed the prototype of design support device for architectural design assessment using the building information modeling(BIM) data and the augmented reality(AR) technology. The proposed system consists of novel hardware composition with the transparent display, the mock-up model and the digital architectural model in the new shape of frame. The removal of background and the correction of viewer point in the capture video are proposed in order to use the transparent display in AR application. The BIM data formats are reviewed to be converted for using in AR application. Also the proposed system can be expanded to multi-user collaboration system from two user system through the suggested hardware and software compositions. The results of this study will be applied to use the mock-up model and digital architectural model in order to carry out the design assessment process efficiently and economically in the architectural design field.

Analysis of the Relations between Design Errors Detected during BIM-based Design Validation and their Impacts Using Logistic Regression (로지스틱 회귀분석을 이용한 BIM 설계 검토에 의하여 발견된 설계 오류와 그 영향도간의 관계 분석)

  • Won, Jong-Sung;Kim, Jae-Yeo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.6
    • /
    • pp.535-544
    • /
    • 2017
  • This paper analyzes the relations between design errors, prevented by building information modeling (BIM)-based design validation, and their impacts in order to identify critical consideration factors for implementing BIM-based design validation in architecture, engineering, and construction (AEC) projects. More than 800 design errors detected by BIM-based design validation in two BIM-based projects in South Korea are categorized according to their causes (illogical error, discrepancy, and missing item) and work types (structure, architecture, and mechanical, electrical, and plumbing (MEP)). The probabilistic relations among the independent variables, including the causes and work types of design errors, and the dependent variables, including the project delays, cost overruns, low quality, and rework generation that can be caused by these errors, are analyzed using logistic regression. The characteristics of each design error are analyzed by means of face-to-face interviews with practitioners. According to the results, the impacts of design error causes in predicting the probability values of project delays, cost overruns, low quality, and rework generation were statistically meaningful.