• Title/Summary/Keyword: BIM 모델

Search Result 411, Processing Time 0.027 seconds

A Proposal of the Usage Metering Functions on Cloud Computing-Based Building Information Modeling (BIM) and the Law for the Open BIM Ecosystem (열린 BIM 생태계 조성을 위한 클라우드 컴퓨팅 기반 BIM 서비스 환경의 사용량 측정 기술 및 법 규정 제안)

  • Kim, Byungkon;Kim, Jongsung
    • Journal of KIBIM
    • /
    • v.6 no.3
    • /
    • pp.49-56
    • /
    • 2016
  • As project opportunities for the Architecture, Engineering and Construction (AEC) industry have grown more complex and larger, the utilization of Building Information Modeling (BIM) technologies for three-dimensional (3D) design and simulation practices has been increasing significantly; the typical applications of the BIM technologies include clash detection and design alternative based on 3D planning, which have been expanded over to the technology of construction management in the AEC industry for virtual design and construction. As for now, commercial BIM software has been operated under a single-user environment, which is why initial costs for its introduction are very high. Cloud computing, one of the most promising next-generation Internet technologies, enables simple Internet devices to use services and resources provided with BIM software. Recently in Korea, studies to link between BIM and cloud computing technologies have been directed toward saving costs to build BIM-related infrastructure, and providing various BIM services for small- and medium-sized enterprises (SMEs). This study addressed development of the usage metering functions of BIM software under cloud computing architecture in order to archive and use BIM data and create an optimal revenue structure so that the BIM services may grow spontaneously, considering a demand for cloud resources. For the reason, we surveyed relevant cases, and then analyzed needs and requirements from AEC industry. Based on the relevant cases, customizing for cloud BIM and design for the development was performed. We also surveyed any related-law to support cloud computing-based BIM service. Finally, we proposed herein how to optimally design and develop the usage metering functions of cloud BIM software.

A Method for Information Management of Defects in Bridge Superstructure Using BIM-COBie (BIM-COBie를 활용한 교량 상부구조의 손상정보 관리 방법)

  • Lee, Sangho;Lee, Jung-Bin;Tak, Ho-Kyun;Lee, Sang-Ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.2
    • /
    • pp.165-173
    • /
    • 2023
  • The data management and the evaluation of defects in the bridge are generally conducted based on inspection and diagnosis data, including the exterior damage map and defect quantity table prepared by periodic inspection. Since most of these data are written in 2D-based documents and are difficult to digitize in a standardized manner, it is challenging to utilize them beyond the defined functionality. This study proposed methods to efficiently build a BIM (Building Information Modeling)-based bridge damage model from raw data of inspection report and to manage and utilize the damage information linking to bridge model through the spread sheet data generated by COBie (Construction Operations Building Information Exchange). In addition, a method to conduct the condition assessment of defects in bridge was proposed based on an automatic evaluation process using digitized bridge member and damage information. The proposed methods were tested using superstructure of PSC-I girder concrete bridge, and the efficiency and effectiveness of the methods were verified.

A Study for the Optimal Expression Level Definition of BIM Model in Construction Phase (시공단계 BIM모델의 적정표현수준 정의를 위한 기초 연구)

  • Noh, Hae-ra;Kim, Ji-yun;Lee, Da-un;Yun, Seok-heon
    • Korean Journal of Computational Design and Engineering
    • /
    • v.21 no.4
    • /
    • pp.378-388
    • /
    • 2016
  • As the needs for the mega-sized, high-rise and irregular shape of building increase, domestic application of BIM in construction industry is increasing in recent years. In this circumstance, interests in BIM modeling and modeling detail level have been also increased. BIM that is based on a three-dimensions, requires a specific and precise building expressions. And model expression level required for each phase such as design, construction, and maintenance of the construction project could be different as its needs. Because that it is not clear to define the criteria for the expression level of construction BIM model, It is difficult to decide how detail and what to model is appropriate in the practical application of BIM model. It could be the reason why the productivity in construction project became lower and lower. In this study we consider the way how to improve the productivity of BIM and analyze the appropriate representation level of construction BIM model through the experts' survey. The results of study could suggest the basis for an appropriate expression level of construction BIM model.

Development of an Integrated IaaS+PaaS Environment for Providing Cloud Computing Service in a BIM Platform for Harbor Facilities (항만 BIM 플랫폼의 클라우드 서비스를 위한 IaaS+PaaS 통합 환경 개발)

  • Moon, Hyoun-Seok;Hyun, Keun-Ju;Kim, Won-Sik
    • Journal of KIBIM
    • /
    • v.9 no.4
    • /
    • pp.62-74
    • /
    • 2019
  • Because the existing BIM platform is based on user services, the focus is on the development of SaaS (Software as a Service), which provides business services online. However, since a harbor is a security facility, the harbor BIM platform is preferably provided in a private form, rather than relying on the infrastructure environment provided by external cloud providers. Therefore, this study analyzes and reviews the main functions to be provided as SaaS services of the harbor BIM platform. The goal is to build a cloud-based harbor BIM platform that can provide this service to users. To this end, we built IaaS (Infrastructure as a Service) environment of the harbor BIM platform based on the open source Open Stack and integrate and develop PaaS environment with Open Shift applied with IaaS. We applied the GPU to the harbor BIM platform to verify the performance of the harbor BIM platform, and found that the rendering and loading times are improved. In particular, it is expected to reduce the cost of introduction and provide it as the basic cloud environment of similar BIM platform for infrastructure facilities.

Development of Fire Detection Model for Underground Utility Facilities Using Deep Learning : Training Data Supplement and Bias Optimization (딥러닝 기반 지하공동구 화재 탐지 모델 개발 : 학습데이터 보강 및 편향 최적화)

  • Kim, Jeongsoo;Lee, Chan-Woo;Park, Seung-Hwa;Lee, Jong-Hyun;Hong, Chang-Hee
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.12
    • /
    • pp.320-330
    • /
    • 2020
  • Fire is difficult to achieve good performance in image detection using deep learning because of its high irregularity. In particular, there is little data on fire detection in underground utility facilities, which have poor light conditions and many objects similar to fire. These make fire detection challenging and cause low performance of deep learning models. Therefore, this study proposed a fire detection model using deep learning and estimated the performance of the model. The proposed model was designed using a combination of a basic convolutional neural network, Inception block of GoogleNet, and Skip connection of ResNet to optimize the deep learning model for fire detection under underground utility facilities. In addition, a training technique for the model was proposed. To examine the effectiveness of the method, the trained model was applied to fire images, which included fire and non-fire (which can be misunderstood as a fire) objects under the underground facilities or similar conditions, and results were analyzed. Metrics, such as precision and recall from deep learning models of other studies, were compared with those of the proposed model to estimate the model performance qualitatively. The results showed that the proposed model has high precision and recall for fire detection under low light intensity and both low erroneous and missing detection capabilities for things similar to fire.

BIM-based Data Mining Model for Effective Energy Management (효과적인 에너지 관리를 위한 BIM 기반 데이터마이닝 모델 연구)

  • Kang, Tae-Wook;Kim, Ji-Eun;Jang, Jin-Woong;Hong, Chang-Hee
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.8
    • /
    • pp.5591-5599
    • /
    • 2015
  • For the effective energy management, this study proposed BIM(Building Information Modeling)-based Data Mining Model(B-DMM). To conduct this, BIM-based data mining researches were surveyed then the use-cases and scenarios related to the energy management were analyzed. By using this results, B-DMM for supporting the decision making related the energy management was proposed. The output will be used as a decision making tool for managing a building energy.

Algorithm of Level-3 Digital Model Generation for Cable-stayed Bridges and its Applications (Level-3 사장교 디지털 모델 생성을 위한 알고리즘 및 활용)

  • Roh, Gi-Tae;Dang, Ngoc Son;Shim, Chang-Su
    • Journal of KIBIM
    • /
    • v.9 no.4
    • /
    • pp.41-50
    • /
    • 2019
  • Digital models for a cable-stayed bridge are defined considering data-driven engineering from design to construction. Algorithms for digital object generation of each component of the cable-stayed bridge were developed. Using these algorithms, Level-3 BIM practices can be realized from design stages. Based on previous practices, digital object library can be accumulated. Basic digital models are modified according to given design conditions by a designer. Once design models are planned, various applications using the models are linked the models such as estimation, drawings and mechanical properties. Federated bridge models are delivered to construction stages. In construction stage, the models can be efficiently revised according to the changed situations during construction phases. In this paper, measured coordinates are imported to the model generation algorithms and revised models are obtained. Augmented reality devices and their applications are proposed. AR simulations in construction site and in office condition are tested. From this pilot test of digital models, it can be said that Level-3 BIM practices can be realized by using in-house modeling algorithms according to different purposes.

BIM Geometry Cache Structure for Data Streaming with Large Volume (대용량 BIM 형상 데이터 스트리밍을 위한 캐쉬 구조)

  • Kang, Tae-Wook
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.9
    • /
    • pp.1-8
    • /
    • 2017
  • The purpose of this study is to propose a cache structure for processing large-volume building information modeling (BIM) geometry data,whereit is difficult to allocate physical memory. As the number of BIM orders has increased in the public sector, it is becoming more common to visualize and calculate large-volume BIM geometry data. Design and review collaboration can require a lot of time to download large-volume BIM data through the network. If the BIM data exceeds the physical free-memory limit, visualization and geometry computation cannot be possible. In order to utilize large amounts of BIM data on insufficient physical memory or a low-bandwidth network, it is advantageous to cache only the data necessary for BIM geometry rendering and calculation time. Thisstudy proposes acache structure for efficiently rendering and calculating large-volume BIM geometry data where it is difficult to allocate enough physical memory.

A Study on the Application of BIM for Reinforcement Concrete Structural Work (철근 콘크리트 공사에서의 BIM 적용 연구)

  • Ahn, Jae-Hong;Lim, Nam-Gi
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.22 no.1
    • /
    • pp.158-166
    • /
    • 2018
  • The application of the BIM for architectural and structural work accompanied many trials-and-errors on project based on BIM by this time Ten years have passed since BIM issued, but it is not activated. This study suggests ways to activate BIM for architectural and structural work. The reason for choosing the structure construction is as follows. Construction cost is a high proportion of structural construction cost. On the other hand, the number of related materials is small, and the first in the 3D modeling process is structure modeling. And build BIM-based Structural Database by quantity take-off. This study shows the applicability of BIM through practical cases. This study is expected to provide suggestion for the successful implementation of BIM-based projects.

Development of intranet-based Program Management Information System of multi-complex project with application of BIM (BIM을 활용한 다중복합 프로젝트의 인트라넷 기반 통합사업관리체계 구축 방안)

  • Song, Il-Bab;Hur, Young-Ran;Seo, Jong-Won
    • Journal of KIBIM
    • /
    • v.2 no.1
    • /
    • pp.27-39
    • /
    • 2012
  • Public construction projects need complex and multi-functional management skill, since the most of public construction projects are comprised of multi-project and mega-projects. In order to effectively manage construction projects, PMIS is widely used. However the majority of the current PMIS have been developed as a single project-oriented business management system. Thus compatibility problems are encountered during the process of integrating the entire systems to manage the multi-complex projects. In addition, the form of orders applying BIM are increased recently, but the research and development of BIM based PMIS are still lacking. In this study, therefore, the functions of PMIS main objectives based on the analysis of PMIS As-Is and To-Be of PMIS, the dual management system utilizing Internet and Intranet will be proposed to integrate the individual PMIS with Integrated Program Management System. Rather than combining commercial BIM tool and PMIS directly, which is the common method of failure, the sequential process model to adopt BIM based PMIS is also explained. Step-by-step development method of BIM based PMIS is suggested to prepare for the activation of BIM technology in the nearest future.