• Title/Summary/Keyword: BIM비전

Search Result 12, Processing Time 0.029 seconds

Study of the BIM technology, market trends and visions in the design phase (설계단계에서 BIM 기술, 시장 동향 및 비전에 관한 연구)

  • Lee, Da-un;Yun, Seok-heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.215-216
    • /
    • 2015
  • In order to facilitate the introduction of BIM technology in the construction project of fact, many countries such as Singapore and the United States, is developing a roadmap of BIM technology development. To develop this, recently, it must be analyzed in advance the state of BIM technology domestic projects. In this study, we define the elements of technology BIM, and analyzed the current situation. In addition, I was evaluated and priority importance to the elemental technology derived. As a result, elemental technology most was the level inferior to foreign countries, and the field of ordering standard planning and has been highly valued and priority of particular importance, but currently, the level of domestic, analysis and most delayed has been. These results are judged to be useful in the development of the roadmap and direction of technological development of BIM in the future.

  • PDF

Basic Study of the Application of BIM to Classroom Spatial Information of School Facilities (학교시설 교사공간정보의 BIM 적용에 관한 기초연구)

  • Lee, Sang-Heon;Choi, Joong-Hyun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.11
    • /
    • pp.6922-6931
    • /
    • 2014
  • The development of modern science and technology and computer engineering breakthroughs in the field of information and communication have brought about many changes in lifestyle. The government announced the goal of educational policy in 2030 to educate people in future society on a future-oriented perspective. Changes in the curriculum along with changes in educational facilities are essential. Therefore, the operation of a classroom should be associated with classroom spatial information. The BIM design based on 3D geometry information was designed. The BIM design can link the design information and non-geometric information of spatial information. This study examined the operation of school facilities based on classroom spatial information with BIM. This study suggests standardization of classroom spatial information based on BIM. The scenarios of BIM ordering and design for departmentalized classrooms management is proposed.

Simultaneous Tracking of Multiple Construction Workers Using Stereo-Vision (다수의 건설인력 위치 추적을 위한 스테레오 비전의 활용)

  • Lee, Yong-Ju;Park, Man-Woo
    • Journal of KIBIM
    • /
    • v.7 no.1
    • /
    • pp.45-53
    • /
    • 2017
  • Continuous research efforts have been made on acquiring location data on construction sites. As a result, GPS and RFID are increasingly employed on the site to track the location of equipment and materials. However, these systems are based on radio frequency technologies which require attaching tags on every target entity. Implementing the systems incurs time and costs for attaching/detaching/managing the tags or sensors. For this reason, efforts are currently being made to track construction entities using only cameras. Vision-based 3D tracking has been presented in a previous research work in which the location of construction manpower, vehicle, and materials were successfully tracked. However, the proposed system is still in its infancy and yet to be implemented on practical applications for two reasons. First, it does not involve entity matching across two views, and thus cannot be used for tracking multiple entities, simultaneously. Second, the use of a checker board in the camera calibration process entails a focus-related problem when the baseline is long and the target entities are located far from the cameras. This paper proposes a vision-based method to track multiple workers simultaneously. An entity matching procedure is added to acquire the matching pairs of the same entities across two views which is necessary for tracking multiple entities. Also, the proposed method simplified the calibration process by avoiding the use of a checkerboard, making it more adequate to the realistic deployment on construction sites.

Augmented Reality Framework for Efficient Access to Schedule Information on Construction Sites (증강현실 기술을 통한 건설 현장에서의 공정 정보 활용도 제고 방안)

  • Lee, Yong-Ju;Kim, Jin-Young;Pham, Hung;Park, Man-Woo
    • Journal of KIBIM
    • /
    • v.10 no.4
    • /
    • pp.60-69
    • /
    • 2020
  • Allowing on-site workers to access information of the construction process can enable task control, data integration, material and resource control. However, in the current practice of the construction industry, the existing methods and scope is quite limited, leading to inefficient management during the construction process. In this research, by adopting cutting edge technologies such as Augmented Reality(AR), digital twins, deep learning and computer vision with wearable AR devices, the authors proposed an AR visualization framework made of virtual components to help on-site workers to obtain information of the construction process with ease of use. Also, this paper investigates wearable AR devices and object detection algorithms, which are critical factors in the proposed framework, to test their suitability.

Research on Digital Construction Site Management Using Drone and Vision Processing Technology (드론 및 비전 프로세싱 기술을 활용한 디지털 건설현장 관리에 대한 연구)

  • Seo, Min Jo;Park, Kyung Kyu;Lee, Seung Been;Kim, Si Uk;Choi, Won Jun;Kim, Chee Kyeung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.239-240
    • /
    • 2023
  • Construction site management involves overseeing tasks from the construction phase to the maintenance stage, and digitalization of construction sites is necessary for digital construction site management. In this study, we aim to conduct research on object recognition at construction sites using drones. Images of construction sites captured by drones are reconstructed into BIM (Building Information Modeling) models, and objects are recognized after partially rendering the models using artificial intelligence. For the photorealistic rendering of the BIM models, both traditional filtering techniques and the generative adversarial network (GAN) model were used, while the YOLO (You Only Look Once) model was employed for object recognition. This study is expected to provide insights into the research direction of digital construction site management and help assess the potential and future value of introducing artificial intelligence in the construction industry.

  • PDF

Automated Construction Progress Management Using Computer Vision-based CNN Model and BIM (이미지 기반 기계 학습과 BIM을 활용한 자동화된 시공 진도 관리 - 합성곱 신경망 모델(CNN)과 실내측위기술, 4D BIM을 기반으로 -)

  • Rho, Juhee;Park, Moonseo;Lee, Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.5
    • /
    • pp.11-19
    • /
    • 2020
  • A daily progress monitoring and further schedule management of a construction project have a significant impact on the construction manager's decision making in schedule change and controlling field operation. However, a current site monitoring method highly relies on the manually recorded daily-log book by the person in charge of the work. For this reason, it is difficult to take a detached view and sometimes human error such as omission of contents may occur. In order to resolve these problems, previous researches have developed automated site monitoring method with the object recognition-based visualization or BIM data creation. Despite of the research results along with the related technology development, there are limitations in application targeting the practical construction projects due to the constraints in the experimental methods that assume the fixed equipment at a specific location. To overcome these limitations, some smart devices carried by the field workers can be employed as a medium for data creation. Specifically, the extracted information from the site picture by object recognition technology of CNN model, and positional information by GIPS are applied to update 4D BIM data. A standard CNN model is developed and BIM data modification experiments are conducted with the collected data to validate the research suggestion. Based on the experimental results, it is confirmed that the methods and performance are applicable to the construction site management and further it is expected to contribute speedy and precise data creation with the application of automated progress monitoring methods.

Entity Matching for Vision-Based Tracking of Construction Workers Using Epipolar Geometry (영상 내 건설인력 위치 추적을 위한 등극선 기하학 기반의 개체 매칭 기법)

  • Lee, Yong-Joo;Kim, Do-Wan;Park, Man-Woo
    • Journal of KIBIM
    • /
    • v.5 no.2
    • /
    • pp.46-54
    • /
    • 2015
  • Vision-based tracking has been proposed as a means to efficiently track a large number of construction resources operating in a congested site. In order to obtain 3D coordinates of an object, it is necessary to employ stereo-vision theories. Detecting and tracking of multiple objects require an entity matching process that finds corresponding pairs of detected entities across the two camera views. This paper proposes an efficient way of entity matching for tracking of construction workers. The proposed method basically uses epipolar geometry which represents the relationship between the two fixed cameras. Each pixel coordinate in a camera view is projected onto the other camera view as an epipolar line. The proposed method finds the matching pair of a worker entity by comparing the proximity of the all detected entities in the other view to the epipolar line. Experimental results demonstrate its suitability for automated entity matching for 3D vision-based tracking of construction workers.

A Study on Architectural Image Generation using Artificial Intelligence Algorithm - A Fundamental Study on the Generation of Due Diligence Images Based on Architectural Sketch - (인공지능 알고리즘을 활용한 건축 이미지 생성에 관한 연구 - 건축 스케치 기반의 실사 이미지 생성을 위한 기초적 연구 -)

  • Han, Sang-Kook;Shin, Dong-Youn
    • Journal of KIBIM
    • /
    • v.11 no.2
    • /
    • pp.54-59
    • /
    • 2021
  • In the process of designing a building, the process of expressing the designer's ideas through images is essential. However, it is expensive and time consuming for a designer to analyze every individual case image to generate a hypothetical design. This study aims to visualize the basic design draft sketch made by the designer as a real image using the Generative Adversarial Network (GAN) based on the continuously accumulated architectural case images. Through this, we proposed a method to build an automated visualization environment using artificial intelligence and to visualize the architectural idea conceived by the designer in the architectural planning stage faster and cheaper than in the past. This study was conducted using approximately 20,000 images. In our study, the GAN algorithm allowed us to represent primary materials and shades within 2 seconds, but lacked accuracy in material and shading representation. We plan to add image data in the future to address this in a follow-up study.

Development of Automation Technology for Structural Members Quantity Calculation through 2D Drawing Recognition (2D 도면 인식을 통한 부재 물량 산출 자동화 기술 개발)

  • Sunwoo, Hyo-Bin;Choi, Go-Hoon;Heo, Seok-Jae
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.227-228
    • /
    • 2022
  • In order to achieve the goal of cost management, which is one of the three major management goals of building production, this paper introduces an approximate cost estimating automation technology in the design stage as the importance of predicting construction costs increases. BIM is used for accurate estimating, and the quantity of structural members and finishing materials is calculated by creating a 3D model of the actual building. However, only 2D basic design drawings are provided when making an estimating. Therefore, for accurate quantity calculation, digitization of 2D drawings is required. Therefore, this research calculates the quantity of concrete structural members by calculating the area for the recognition area through 2D drawing recognition technology incorporating computer vision. It is judged that the development technology of this research can be used as an important decision-making tool when predicting the construction cost in the design stage. In addition, it is expected that 3D modeling automation and 3D structural analysis will be possible through the digitization of 2D drawings.

  • PDF

The Present Status and Vision of Virtual Construction System Development (가상 건설 시스템 개발 현황과 비전)

  • Kim, Jae-Jun;Choi, Cul-Ho;Shin, Hyun-Mok;Jin, Sang-Yoon;Lee, Kwang-Myung
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.170-175
    • /
    • 2008
  • The research team for the virtual construction development was established with the support of Korea Ministry of Construction and Transportation, and KICTEP (Korea Institute of Construction and Transportation Technology Evaluation and Planning). Its aims are to develop system that is to improve productivity & quality, to create a higher value-added business, and to cultivate international competitiveness in the construction industry. The virtual construction system is a design, engineering, and construction management information system that allows the project participants to effectively share the information throughout the construction life cycle with the support of 3D and design information. To achieve this, the research team focuses on developing several systems. First, the team focuses on developing for the pre-planning, the structural engineering, MEP, and the 3D based estimation system. Second, they focus on developing a simulation system for the construction process planning and feasibility study with help of the virtual reality technologies. Third, they focus on developing the CPLM (Construction Project Life-cycle Management) system for managing construction project data, and the decision support system that makes the collaboration among the project participants based on 3D technologies and information. We also focus on developing the SDAI (Standard Data Access Interface), the localized guideline for 3D design, and a training program. In addition, we focus on developing the undeveloped area of the commercial system and building an environment that can support the communication and collaboration in the construction life-cycle rather than developing the existing and commercialized system.

  • PDF