Journal of Korean Society of Industrial and Systems Engineering
/
v.40
no.1
/
pp.50-56
/
2017
The IRR (internal rate of return) is often used by investors for the evaluation of engineering projects. Unfortunately, it is widely known that it has serial flaws. Also, External rate of returns (ERRs) such as ARR (Average Rate of Return) or MIRR (MIRR, Modified Internal Rate of Return) do not differentiate between the real investment and the expenditure. The PRR (Productive rate of return) is faithful to the conception of the return on investment. The PRR uses the effective investment instead of the initial investment. In this paper, we examined two cases of the engineering project. the one is a traditional engineering project with financing activity, another is the project with R&D. Although the IRR has only one value, it overestimates or underestimate profitabilities of Engineering Projects. The ARR and the MARR assume that a returned cash reinvest other projects or assets instead of the project currently executing. Thus they are only one value of a project's profitability, unlike the IRR. But the ARR does not classify into the effective investment and non-investment expenditure. It only accepts an initial expenditure as for an investment. The MIRR also fails to classify into the investment and the expenditure. It has an error of making a loss down as the investment. The IRR works as efficiently as a NPW (Net Present Worth). It clearly expresses a rate of return in respect of an investment in an engineering project with a loan. And it shows its ability in an engineering project with a R&D investment.
Journal of The Korean Society of Agricultural Engineers
/
v.52
no.1
/
pp.41-49
/
2010
Return flow rate of irrigation water was estimated by water balance method. Daepyeong pumping district to irrigate 75.8 ha of rice paddy in the Geum river basin was selected to install gauging instruments to collect data such as weather, water levels, infiltration rate and evapotranspiration during irrigation season (May 27 to Sept. 20) in 2003 and 2004. Irrigation and drainage discharge were calculated from the rating curve and evapotranspiration was estimated both by the modified Penman formula and by the lysimeter. The results were as followed : 1. Total amounts of pumping water during irrigation season were $1,076,000\;m^3$ in 2003 and $1,848,000\;m^3$ in 2004. Total amounts of rainfall were 1336.0mm and 1003.0mm respectively during the irrigation season in 2003 and 2004. 2. It was surveyed that the amount of infiltration was 196.5 mm (2.2 mm/day). The gauged evapotranspiration was 311.0 mm (3.5 mm/day) and the calculated evapotranspiration was 346.0 mm (3.9 mm/day) during irrigation period in 2003. It was surveyed that the amount of infiltration was 169.9 mm (2.4 mm/day). The amount of gauged evapotranspiration was 377.3 mm (5.3 mm/day) and the calculated evapotranspiration was 454.5 mm (6.6 mm/day) during irrigation period in 2004. 3. The rates of quick and delayed return flow were 52.4 % and 17.7 % respectively, and so return flow rate was 70.1 % in 2003. The rates of quick and delayed return flow were 45.4 % and 16.1 % respectively, and so return flow rate was 61.5 % in 2004. It means that average return flow rate in the Daepyeong pumping district was assumed to be 65 %.
Journal of Korean Society of Industrial and Systems Engineering
/
v.38
no.3
/
pp.95-99
/
2015
The IRR(internal rate of return) is often used by investors for the evaluation of engineering projects. Unfortunately, it has serial flaws: (1) multiple real-valued IRRs may arise; (2) complex-valued IRRs may arise; (3) the IRR is, in special cases, incompatible with the net present value (NPV) in accept/reject decisions. The efforts of management scientists and economists in providing a reliable project rate of return have generated over the decades an immense amount of contributions aiming to solve these shortcomings. Especially, multiple internal rate of returns (IRRs) have a fatal flaw when we decide to accep it or not. To solve it, some researchers came up with external rate of returns (ERRs) such as ARR (Average Rate of Return) or MIRR (MIRR, Modified Internal Rate of Return). ARR or MIRR. will also always yield the same decision for a engineering project consistent with the NPV criterion. The ERRs are to modify the procedure for computing the rate of return by making explicit and consistent assumptions about the interest rate at which intermediate receipts from projects may be invested. This reinvestment could be either in other projects or in the outside market. However, when we use traditional ERRs, a volume of capital investment is still unclear. Alternatively, the productive rate of return (PRR) can settle these problems. Generally, a rate of return is a profit on an investment over a period of time, expressed as a proportion of the original investment. The time period is typically the life of a project. The PRR is based on the full life of the engineering project. but has been annualised to project one year. And the PRR uses the effective investment instead of the original investment. This method requires that the cash flow of an engineering project must be separated into 'investment' and 'loss' to calculate the PRR value. In this paper, we proposed a tabulated form for easy calculation of the PRR by modifing the profit and loss statement, and the cash flow statement.
Kim, Ha-Young;Nam, Won-Ho;Mun, Young-Sik;Bang, Na-Kyoung;Kim, Han-Joong
Journal of The Korean Society of Agricultural Engineers
/
v.63
no.2
/
pp.85-96
/
2021
Irrigation return flow is defined as the excess of irrigation water that is not evapotranspirated by direct surface drainage, and which returns to an aquifer. It is important to quantitatively estimate the irrigation return flow of the water cycle in an agricultural watershed. However, the previous studies on irrigation return flow rates are limitations in quantifying the return flow rate by region. Therefore, simulating irrigation return flow by accounting for various water loss rates derived from agricultural practices is necessary while the hydrologic and hydraulic modeling of cultivated canal-irrigated watersheds. In this study, the irrigation return flow rate of agricultural water, especially for the entire agricultural watershed, was estimated using the SWMM (Storm Water Management Model) module from 2010 to 2019 for the Madun reservoir located in Anseong, Gyeonggi-do. The results of SWMM simulation and water balance analysis estimated irrigation return flow rate. The estimated average annual irrigation return flow ratio during the period from 2010 to 2019 was approximately 55.3% of the annual irrigation amounts of which 35.9% was rapid return flow and 19.4% was delayed return flow. Based on these results, the hydrologic and hydraulic modeling approach can provide a valuable approach for estimating the irrigation return flow under different hydrological and water management conditions.
The main source in financing the National Pension benefits is the contribution raised from the insured's earnings. So, Most of the insured take a great interest in the questions of what return on the payment of contribution National Pension benefits provide and whether there be the difference in return according to earnings level. The Purpose of this study is to assess money's worth of National Pension and to answer the above questions. There are two basic types of money worth analysis, empirical and hopothetical. This study basically belongs to the former in terms that it is based on actual earnings and insured term. For performing money's worth analysis, four different measures which are referred as the "break-even period", the "benefit/tax ratio", the "net lifetime transfer", the "internal rate of return" are used and they all involve the way in which the relationship between the present value of contributions and the present values of benefit is present. The results which evaluate average money's worth of accrued rights before 1999 are le as follows. Break-even period is about 43 months, benefit/tax ratio being 4.9, net lifetime transfers being about 37 mil1ion won, internal rate of return being 33.2%. This verifies that money' worth of National Pension is much higher than actuarially fair. In the mean while, money' worth is proved to be very different according to earnings level. The progressivity relationship between earnings level and rate of return is found in all measures but net lifetime transfer.
Park, Suwan;Kim, Bong Jae;Jun, Hwan Don;Kim, In Chul
Journal of Korean Society on Water Environment
/
v.22
no.5
/
pp.905-912
/
2006
In this paper, simulation methods of the system dynamics model developed by Das et al. (1997) for activated-sludge wastewater treatment plants are illustrated in an attempt to determine the operating rules and the policies related to capacity expansion of an activated-sludge wastewater treatment plant. For existing conditions, the analyses were performed by varying activated-sludge return rate to observe changes in effluent water quality and treatment efficiency. The effluent water quality is also analyzed for various average daily inflow conditions and activated-sludge return rates. As a result, without expanding the aeration tank, maximum average daily inflow that can satisfy the effluent water quality standard of BOD $0.02kg/m^3$ was determined as $2,840m^3/hr$, subject to 100% of activated-sludge return rate while other factors remain constant. When the activated-sludge return rate is less than 100%, expansion of the aeration tank is necessary and minimum sizes of the aeration tank to satisfy the effluent water quality standard were determined for various activated-sludge return rates. In addition, the total operating and maintenance as well as unit treatment cost regression equations for activated-sludge wastewater treatment plants are suggested by using the cost data that are obtained from Water and Wastewater Division, Ministry of Environment. The regression analyses showed that the economies of scale phenomena exist in the operating and maintenance costs of activated-sludge wastewater treatment plants.
The safe return home system automatically tracks and makes a video-recording the client by selecting and controlling CCTV cameras near the client using GPS location information received from the smart device possessed by the service client. This service helps clients to return home safely when there is a crime-ridden district on their late night return home route. If the CCTV cameras that can capture the client are already occupied and used by other clients, concession of occupied CCTV cameras is required to capture the new client. To tackle the limitation, we developed an extended method that considered both the average distances between the client and CCTV cameras and the service rates. As a result, the average distance between CCTV cameras and clients is kept close, and service rates are improved.
Journal of Korean Society of Industrial and Systems Engineering
/
v.42
no.1
/
pp.137-142
/
2019
There are two methods for evaluating two or more mutually exclusive projects. One is a total investment approach and the other is an incremental investment approach. The former can rank projects by the criterion of the net present value, but the latter can't do it. An incremental investment approach is only possible when all pairwise alternatives are compared. Thus an incremental investment approach is superior in ranking them over an incremental investment approach. To do so, a principle of comparison must be established. Comparisons of profitability are reasonable when operating the same amount of investment over the same period of time. One principle is that all projects are invested in the largest of the projects. Another principle is that all projects are invested during the longest project life of the projects. In this paper, even if the principle is followed, it will be shown that the external rate of return fails to rank them. However, the productive rate of return criterion would prove to be able to rank them like the net present value standard, provided that the principle of comparison is kept. In addition, rate of returns can be assessed so that all mutually exclusive projects can be compared at once, such as on the criterion of the net present value. That is, it can be also compared with many other returns, such as the profit rates on financial investments or real investments.
The paper aims to establish the characteristics of the Korean firms' R&D investment and to estimate the private rate of return to R&D investment. For the empirical analysis, a balanced panel data is constructed with 695 firms on 8 year observations. The panel data enables to characterize R&D investment of the Korean firms, which is mostly conformed to the 'stylized facts' of R&D investment that found in the previous studies on foreign firms. Klette model was used to estimate the private rate of return on R&D investment and depreciation rate of R&D capital. The paper estimates that the rate of return on R&D investment is 10.5% on average or 16.4% on median for the whole industry whereas manufacturing firms show 10.4% on average or 16.4% on median. The depreciation rate was estimated about 32.9% for whole industry, where it ranges from the minimum 11.6% for metal industry and 49.5% for services. The median estimate of the rate of return for R&D investment of Korean firms is roughly two times higher than real interest rates for the same period, which implies that R&D investment allows sizable rent in addition to the opportunity cost of capital investment.
Proceedings of the Korean Operations and Management Science Society Conference
/
2000.10a
/
pp.77-80
/
2000
Feedback herding strategy in stock market means considering other investor's strategy as a basis of market forecasting of next term. Generally, individual investors use that strategy which mimics the strategy of institutional investors. When it is used in stock market, both kind of investors, preceders and followers, can take the higher average of rate of return to normal market in which no feedback herding strategy is not use, the more investors take part in. And variance of return, the risk of investment, are same to both group.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.