• Title/Summary/Keyword: Available capacity

Search Result 1,150, Processing Time 0.028 seconds

A study on the capacity payment in cost based pool (비용기반 전력시장에서의 용량요금 산정방안에 관한 연구)

  • Han, Seok-Man;Lee, Cheon-Ho;Shin, Hye-Kyung;Chung, Koo-Hyung;Kang, Dong-Joo;H.Kim, Bal-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.111-112
    • /
    • 2007
  • This paper presents the capacity payment in electricity power markets. The capacity payment (CP) needs to recover fixed costs. But most CP is allocated by energy policy. So, this paper analysis CP using capacity proportion and Reliability Pricing Model (RPM). The capacity proportion method uses base capacity price and supply available capacity. The RPM method uses value of each region and operation attribute of each generator.

  • PDF

The Monthly Water Supply Reliability Indexes in the Parallel Reservoir System

  • Park, Ki-Bum;Kim, Sung-Won;Lee, Yeong-Hwa
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2009.05a
    • /
    • pp.1612-1615
    • /
    • 2009
  • Water supply reliability indexes (WSRI) is estimated for assessment of water supply capacity in the downstream for parallel reservoir system in Nakdong River, South Korea, using allocation rule (AR) according to the water supply capacity of each reservoir and the characteristic of parallel reservoir system. The result of the analyzing parallel reservoir system for Andong and Imha reservoir in Nakdong River does not include evidences available enough to decide whether the results of water supply analysis are excellent in the current reliability evaluation or not. However, AR (C) shows a good result in the water supply capacity for each reservoir based on the connected operation system and the total water supply capacity at the control point of downstream by the average water supply capacity and possible range of water supply capacity suggested by this study. The average water supply capacity is analyzed by the reliability of monthly average water supply capacity. Furthermore, the possible range of water supply capacity is estimated by the standard deviation when water deficit occurs. Therefore, AR (C) is useful to establish and estimate the planning water supply capacity according to the monthly water supply condition and the possible range of water supply capacity when the water supply capacity deficit occurs, South Korea.

  • PDF

Lateral capacity of piles in layered soil: a simple approach

  • Mandal, Bikash;Roy, Rana;Dutta, Sekhar Chandra
    • Structural Engineering and Mechanics
    • /
    • v.44 no.5
    • /
    • pp.571-584
    • /
    • 2012
  • Appropriate assessment of lateral capacity of pile foundation is known to be a complex problem involving soil-structure interaction. Having reviewed the available methods in brief, relative paucity of simple and rational technique to evaluate lateral capacity of pile in layered soil is identified. In this context, two efficient approaches for the assessment of lateral capacity of short pile embedded in bi-layer cohesive deposit is developed. It is presumed that the allowable lateral capacity of short pile is generally dictated by the permissible lateral displacement within which pile-soil system may be assumed to be elastic. The applicability of the scheme, depicted through illustration, is believed to be of ample help at least for practical purpose.

Dependence of Nutrient Supplying Capacity on Chemical reactions of Paddy Soil (논토양 화학특성 변화와 양분공급력과의 관계)

  • Kim, Yoo-Hak;Kim, Myung-Sook;Kang, Seong-Soo;Jun, Hee-Joong
    • Korean Journal of Soil Science and Fertilizer
    • /
    • v.42 no.spc
    • /
    • pp.33-39
    • /
    • 2009
  • The practice of supplying nutrients for paddy soil with sustaining human health and ecological soundness is to utilize indicators considering soil chemical reactions. The long-term basis experiment of fertilizer and amendment of paddy soil and an experiment of yield response of soil types on nitrogen level from 2000 till 2002were used to search indicators of nutrient supplying capacity related to soil chemical reactions. Chemical reactions of paddy soil was composed of dissociating and/or adsorbing nutrients and of decomposing soil organic matter (SOM) into $H^+$, $e^-$, $CO_2$ in paddy soil. The indicators of nutrient supplying capacity, which were established by considering soil chemical reactions, were SOM or soil protein for nitrogen and available phosphate for phosphorus and cation exchangeable capacity (CEC) and exchangeable potassium for potassium. Korea has used fertilizer recommendation equations established with the indicators of nutrient supplying capacity for paddy soil.

Experimental behaviour of composite beams subjected to a hogging moment

  • Pecce, Marisa;Rossi, Fernando;Bibbo, Fabio Antonio;Ceroni, Francesca
    • Steel and Composite Structures
    • /
    • v.12 no.5
    • /
    • pp.395-412
    • /
    • 2012
  • The present work addresses the rotational capacity of steel-concrete composite beams, which is a key issue for the seismic design of composite frames. Several experimental tests from the literature are summarised, and the effects of various parameters on the available plastic rotation are discussed. Furthermore, a number of remarks are made regarding the need for supplementary experimental results. The authors carried out experimental tests on four composite beams in which the type, width and connection degree of the slab were varied. During the tests, the deflection and strains in the steel profiles and bars were measured and recorded, wherein the observed trends in the measured parameters indicated that the failure mode of the beam was influenced by global and local buckling. A comparison of the experimental results to the theoretical ultimate strengths and moment-curvature relationships confirms that buckling phenomena occurred after section yielding, even if a consistent plastic rotation developed. This rotational capacity is well evaluated by a formulation that is available in the literature.

Analysis of reinforced concrete corbel beams using Strut and Tie models

  • Parol, Jafarali;Al-Qazweeni, Jamal;Salam, Safaa Abdul
    • Computers and Concrete
    • /
    • v.21 no.1
    • /
    • pp.95-102
    • /
    • 2018
  • Reinforced concrete corbel beams (span to depth ratio of a corbel is less than one) are designed with primary reinforcement bars to account for bending moment and with the secondary reinforcement placed parallel to the primary reinforcement (shear stirrups) to resist shear force. It is interesting to note that most of the available analytical procedures employ empirical formulas for the analysis of reinforced concrete corbels. In the present work, a generalized and a simple strut and tie models were employed for the analysis of reinforced corbel beams. The models were benchmarked against experimental results available in the literature. It was shown here that increase of shear stirrups increases the load carrying capacity of reinforced concrete corbel beams. The effect of horizontal load on the load carrying capacity of the corbel beams has also been examined in the present paper. It is observed from the strut and tie models that the resistance of the corbel beam subjected to combined horizontal and vertical load did not change with increase in shear stirrups if the failure of the corbel is limited by concrete crushing. In other words, the load carrying capacity was independent of the horizontal load when failure of the beam occurred due to concrete crushing.

A Study of TRM and ATC Determination for Electricity Market Restructuring (전력산업 구조개편에 대비한 적정 TRM 및 ATC 결정에 관한 연구)

  • 이효상;최진규;신동준;김진오
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.53 no.3
    • /
    • pp.129-134
    • /
    • 2004
  • The Available Transfer Capability (ATC) is defined as the measure of the transfer capability remaining in the physical transmission network for further commercial activity above already committed uses. The ATC determination s related with Total Transfer Capability (TTC) and two reliability margins-Transmission Reliability Capability (TRM) and Capacity Benefit Margin(CBM) The TRM is the component of ATC that accounts for uncertainties and safety margins. Also the TRM is the amount of transmission capability necessary to ensure that the interconnected network is secure under a reasonable range of uncertainties in system conditions. The CBM is the translation of generator capacity reserve margin determined by the Load Serving Entities. This paper describes a method for determining the TTC and TRM to calculate the ATC in the Bulk power system (HL II). TTC and TRM are calculated using Power Transfer Distribution Factor (PTDF). PTDF is implemented to find generation quantifies without violating system security and to identify the most limiting facilities in determining the network’s TTC. Reactive power is also considered to more accurate TTC calculation. TRM is calculated by alternative cases. CBM is calculated by LOLE. This paper compares ATC and TRM using suggested PTDF with using CPF. The method is illustrated using the IEEE 24 bus RTS (MRTS) in case study.

Optimal sensing period in cooperative relay cognitive radio networks

  • Zhang, Shibing;Guo, Xin;Zhang, Xiaoge;Qiu, Gongan
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.10 no.12
    • /
    • pp.5249-5267
    • /
    • 2016
  • Cognitive radio is an efficient technique to improve spectrum efficiency and relieve the pressure of spectrum resources. In this paper, we investigate the spectrum sensing period in cooperative relay cognitive radio networks; analyze the relationship between the available capacity and the signal-to-noise ratio of the received signal of second users, the target probability of detection and the active probability of primary users. Finally, we derive the closed form expression of the optimal spectrum sensing period in terms of maximum throughput. We simulate the probability of false alarm and available capacity of cognitive radio networks and compare optimal spectrum sensing period scheme with fixed sensing period one in these performance. Simulation results show that the optimal sensing period makes the cognitive networks achieve the higher throughput and better spectrum sensing performance than the fixed sensing period does. Cooperative relay cognitive radio networks with optimal spectrum sensing period can achieve the high capacity and steady probability of false alarm in different target probability of detection. It provides a valuable reference for choosing the optimal spectrum sensing period in cooperative relay cognitive radio networks.

Strength Prediction of Corbels Using Strut-and-Tie Model Analysis

  • Kassem, Wael
    • International Journal of Concrete Structures and Materials
    • /
    • v.9 no.2
    • /
    • pp.255-266
    • /
    • 2015
  • A strut-and-tie based method intended for determining the load-carrying capacity of reinforced concrete (RC) corbels is presented in this paper. In addition to the normal strut-and-tie force equilibrium requirements, the proposed model is based on secant stiffness formulation, incorporating strain compatibility and constitutive laws of cracked RC. The proposed method evaluates the load-carrying capacity as limited by the failure modes associated with nodal crushing, yielding of the longitudinal principal reinforcement, as well as crushing or splitting of the diagonal strut. Load-carrying capacity predictions obtained from the proposed analysis method are in a better agreement with corbel test results of a comprehensive database, comprising 455 test results, compiled from the available literature, than other existing models for corbels. This method is illustrated to provide more accurate estimates of behaviour and capacity than the shear-friction based approach implemented by the ACI 318-11, the strut-and-tie provisions in different codes (American, Australian, Canadian, Eurocode and New Zealand).

A Model Test Study on the Bearing Capacity of the Crushed Stone Pile (쇄석말뚝의 지지력 특성에 관한 모형시험 연구)

  • 이상익;박용원;김병일;윤길림
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2001.03a
    • /
    • pp.299-306
    • /
    • 2001
  • Crushed Stone Pile(CSP) is one of the ground improvement methods available to loose sand and clayey ground by forming compacted CSP in the weak soil layer. The effects of this method are enhancement of ground bearing capacity, reduction of settlement and prevention of lateral ground movement in cohesive layer, reduction of liquefaction potential in sandy ground. This study performs model tests in 1.0m${\times}$1.0m${\times}$1.0m and 1.5m${\times}$1.5m${\times}$l.2m model tank to observe bearing capacity of CSP treated ground. The area replacement ratio of CSP composite ground varies 20%, 30% and 40% with square grid pattern. After the composite ground was consolidated under pressure of 0.5kg/$\textrm{cm}^2$ and 1.0kg/$\textrm{cm}^2$, load tests were carried out. The results show that ultimate bearing capacity increases with area replacement ratio and the preconsolidation pressure of ground.

  • PDF