• Title/Summary/Keyword: Automatic Water Management

Search Result 158, Processing Time 0.024 seconds

The design for automatic operation of Tidal power generation equipment (조력발전설비 자동기동 및 최대출력 운전 설계)

  • Kang, D.H.;Kim, J.D.;Him, J.L.;Shin, A.C.;Oh, M.H.;Kim, J.H.
    • Proceedings of the KIEE Conference
    • /
    • 2005.07d
    • /
    • pp.2579-2581
    • /
    • 2005
  • The Tidal Power Plant Management is defined to devise the optimum operating plan and control generating output automatically to obtain maximum production by using adaptive control method. The method to use tidal level observation results is suggested as two(2) kinds of manner, that is the two(2) layer design method by power model simulation and power automatic control.

  • PDF

Study on Remote Communication System for Automatic Water Meter Reading using Embedded Processor (임베디드프로세서를 이용한 상수도 자동검침용 원격통신시스템에 관한 연구)

  • Park, Hyoung-Keun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.12 no.6
    • /
    • pp.2718-2721
    • /
    • 2011
  • This research developed a remote communication system for automatic water meter reading and charge calculation from the field of a house or apartment complexes within the same district. Developed system was applied to perform measurements of the pulse-sensing technology, the minimum power consumption, temperature compensation, short-range wireless communications technology, the handset and wireless communication capabilities of the DB management embedded software to efficiently control. Through this reading-related tasks that are required in a temporal, material and human resources can be minimized.

Design of Automatic Monitoring Network for the Water Quality Management of River Basin (하천 및 호소수 수질관리를 위한 자동측정망의 설계)

  • Choi, Ji-Yong;Park, Won-Kqyu;Lee, Sang-Il
    • Water for future
    • /
    • v.29 no.2
    • /
    • pp.167-178
    • /
    • 1996
  • In designing automatic water quality monitoring networks for a river basin, determination of measurement locations and items is critical to the effectiveness of the total system. In this paper we studied how to decide these two design factors when a monitoring network is designed for the purposse of water quality surveillance and emergency alarm. For measurement locations, candidate sites are chosen based on the intake amount for water supply and the point sources of contamination. Then, detailed locations are decided according to the contaminant flow distance. As for measurement items, characteristics and the accident history of water pollution in the basin must be taken into account. Considering economic aspects, we proposed a two-stage measurement plan: basic components for all locations and selective ones variable for different locations. Proposed methodology is demonstrated through a case study for Nak-dong River Basin.

  • PDF

Optimized Ballast Water Exchange Management for Bulk Carrier (BULK 선용자동 Ballast Water Management Plan 개발)

  • HONG CHUNG YOU;PARK JE WOONG
    • Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
    • /
    • 2004.05a
    • /
    • pp.67-72
    • /
    • 2004
  • Many port states such as New Zealand, the USA, Australia and Canada have strict regulations to prevent ships which arrive in their port from discharging polluted ballast water which contain harmful aquatic organism and pathogens. They are notified that transfer of polluted ballast water can cause serious injury to public health and damage to property and environment. For this reason, they perceived that the ballast exchange in deep sea is the most effective method, together with submitting the ballast management plan which contains the effective exchange method, ballast system and safety consideration. In this study, we pursued both nautical engineering analysis and optimization of algorithm in order to generate the sequence of stability and rapidity. Heuristic Algorithm was chosen on the basis of optimality and applicability to a sequential exchange problem. We have built an optimized algorithm, for automatic exchange of ballast water, by redefining core elements of the $A^\ast$ algorithm, such as node, operator and evaluation function. Final version of the optimized algorithm has been applied to existing bulk carrier and the performance of the algorithm has been verified successfully.

  • PDF

Development of LoRa IoT Automatic Meter Reading and Meter Data Management System for Smart Water Grid (스마트워터그리드를 위한 LoRa IoT 원격검침 및 계량데이터 시스템 개발)

  • Park, Jeong-won;Park, Jae-sam
    • Journal of Advanced Navigation Technology
    • /
    • v.26 no.3
    • /
    • pp.172-178
    • /
    • 2022
  • In this paper, water meter AMR(automatic meter reading), one of the core technologies of smart water grid, using LoRa IoT network is studied. The main content of the research is to develop the network system and show the test results that one PC server receives the readings of water meters from multiple households through LoRa communication and stores them in the database, and at the same time sends the data to the web server database through internet. The system also allows users to monitor the meter readings using their smartphones. The hardware and firmware of the main board of the digital water meter are developed. For a PC server program, MDMS(meter data management system) is developed using Visual C#. The app program running on the user's smartphone is also developed using Android Studio. By connecting each developed parts, the total network system is mounted on a flow test bench in the laboratory and tested. For the fields test, 5 places around the university are selected and the transmission distances are tested. The test result show that the developed system can be applied into the real field. The developed system can be expanded to various social safety nets such as monitoring the living alone or elderly with dementia.

Development of Runoff and Sediment Auto-calibration Tool for HRSM4BMP Model (HRSM4BMP 모형 유출/유사 자동 보정 툴 개발)

  • Kum, Donghyuk;Ryu, Jichul;Choi, Jaewan;Kang, Hyunwoo;Jang, Chun Hwa;Shin, Dong Suk;Lee, Jae Kwan;Lim, Kyoung Jae
    • Journal of Korean Society on Water Environment
    • /
    • v.29 no.1
    • /
    • pp.29-35
    • /
    • 2013
  • Recently, various Best Management Practices (BMPs) have been applied at a field to reduce soil erosion. Hourly Runoff and Sediment Model for Best Management Practices (HRSM4BMP) model could be used to evaluate soil erosion reduction for various agricultural BMPs at fields. Runoff and sediment yield from source areas have to be predicted with greater accuracies to evaluate sediment reduction efficiently with BMPs. To achieve this, the best parameters related with runoff and sediment modules of the HRSM4BMP model should be identified with proper calibration processes. Although manual calibration is often utilized in calibrating runoff and sediment using the HRSM4BMP, objective calibration method would be recommended. The purpose of the study was to develop an automatic calibration tool of the HRSM4BMP model with PARASOL method. This automatic calibration tool was applied to Bangdongri, Chuncheon-si to evaluate its calibration performance. The $R^2$, NSE and RMSE value for runoff estimation were 0.92, 0.92, $0.3m^3$, and for sediment yield estimation were 0.94, 0.94, 0.0027 kg. As shown in this result, automatic calibration tool of HRSM4BMP model would be used to determine the best parameters and can be used to simulate runoff and sediment yield with acceptable accuracies.

Application of a Penalty Function to Improve Performance of an Automatic Calibration for a Watershed Runoff Event Simulation Model (홍수유출 모형 자동 보정의 벌칙함수를 이용한 기능 향상 연구)

  • Kang, Taeuk;Lee, Sangho
    • Journal of Korea Water Resources Association
    • /
    • v.45 no.12
    • /
    • pp.1213-1226
    • /
    • 2012
  • Evolutionary algorithms, which are frequently used in an automatic calibration of watershed runoff simulation models, are unconstrained optimization algorithms. An additional method is required to impose constraints on those algorithms. The purpose of the study is to modify the SCE-UA (shuffled complex evolution-University of Arizona) to impose constraints by a penalty function and to improve performance of the automatic calibration module of the SWMM (storm water management model) linked with the SCE-UA. As indicators related to peak flow are important in watershed runoff event simulation, error of peak flow and error of peak flow occurrence time are selected to set up constraints. The automatic calibration module including the constraints was applied to the Milyang Dam Basin and the Guro 1 Pumping Station Basin. The automatic calibration results were compared with the results calibrated by an automatic calibration without the constraints. Error of peak flow and error of peak flow occurrence time were greatly improved and the original objective function value is not highly violated in the automatic calibration including the constraints. The automatic calibration model with constraints was also verified, and the results was excellent. In conclusion, the performance of the automatic calibration module for watershed runoff event simulation was improved by application of the penalty function to impose constraints.

Implementations of Remote Sensing, GIS, and GPS for Water Resources and Water Quality Monitoring

  • Wu, Mu-Lin;Chen, Chiou-Hsiung;Liu, Shiu-Feng;Wey, Jiun-Sheng
    • Proceedings of the KSRS Conference
    • /
    • 2003.11a
    • /
    • pp.1191-1193
    • /
    • 2003
  • Water quantity and quality monitoring at Taipei Watershed Management Bureau (WRATB) is not only a daily business but also a long term job. WRATB is responsible for providing high quality drinking water to about four millions population in Taipei. The quality of drinking water provided by WRATB is among one of the best in Taiwan. The total area is 717 square kilometers. The water resource pollution is usually divided into two categories, point source pollution and nonpoint source pollution. Garbage disposal is the most important component of the point source pollution, especially those by tourist during holidays and weekends. Pesticide pollution, fertilizer pollution, and natural pollution are the major contributions for nonpoint source pollution. The objective of this paper is to implement remote sensing, geographic information systems, and global positioning systems to monitor water quantity and water quality at WRATB. There are 12 water quality monitoring stations and four water gauge stations at WRATB. The coordinates of the 16 stations were determined by GPS devices and created into the base maps. MapObjects and visual BASIC were implemented to create application modules for water quality and quantity monitoring. Water quality of the two major watersheds at WRATB was put on Internet for public review monthly. The GIS software, ArcIMS, can put location maps and attributes of all 16 stations on Internet for general public review and technical implementations at WRATB. Inquiry and statistic charts automatic manipulations for the past 18 years are also available. Garbage disposal by community and tourist were also managed by GIS and GPS. The storage, collection, and transportation of garbage were reviewed by ArcMap file format. All garbage cart and garbage can at WRATB can be displayed on the base maps. Garbage disposal by tourist during holidays and weekends can be managed by a PDA with a GPS device and a digital camera. Man power allocation for tourist garbage disposal management can be done in an integration of GIS and GPS. Monitoring of water quality and quantity at WRATB can be done on Internet and by a PDA.

  • PDF

Development of Integrated Management System of Stormwater Retention and Treatment in Waterside Land for Urban Stream Environment (도시 하천 환경 관리를 위한 제외지 초기 강우 처리 및 저류 시설 종합 관리 시스템 개발)

  • Yin, Zhenhao;Koo, Youngmin;Lee, Eunhyoung;Seo, Dongil
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.37 no.2
    • /
    • pp.126-135
    • /
    • 2015
  • Increase of delivery effect of pollutant loads and surface runoff due to urbanization of catchment area results in serious environmental problems in receiving urban streams. This study aims to develop integrated stormwater management system to assist efficient urban stream flow and water quality control using information from the Storm Water Management Model (SWMM), real time water level and quality monitoring system and remote or automatic treatment facility control system. Based on field observations in the study site, most of the pollutant loads are flushed within 4 hours of the rainfall event. SWMM simulation results indicates that the treatment system can store up to 6 mm of cumulative rainfall in the study catchment area, and this means any type of normal rainfall situation can be treated using the system. Relationship between rainfall amount and fill time were developed for various rainfall duration for operation of stormwater treatment system in this study. This study can further provide inputs of river water quality model and thus can effectively assist integrated water resources management in urban catchment and streams.

Development on an Automatic Calibration Module of the SWMM for Watershed Runoff Simulation and Water Quality Simulation (유역유출 및 수질모의에 관한 SWMM의 자동 보정 모듈 개발)

  • Kang, Taeuk;Lee, Sangho
    • Journal of Korea Water Resources Association
    • /
    • v.47 no.4
    • /
    • pp.343-356
    • /
    • 2014
  • The SWMM (storm water management model) has been widely used in the world and is a watershed runoff simulation model used for a single event or a continuous simulation of runoff quantity and quality. However, there are many uncertain parameters in the watershed runoff continuous simulation module and the water quality module, which make it difficult to use the SWMM. The purpose of the study is to develop an automatic calibration module of the SWMM not only for watershed runoff continuous simulation, but also water quality simulation. The automatic calibration module was developed by linking the SWMM with the SCE-UA (shuffled complex evolution-University of Arizona) that is a global optimization algorithm. Estimation parameters of the SWMM were selected and search ranges of them were reasonably configured. The module was validated by calibration and verification of the watershed runoff continuous simulation model and the water quality model for the Donghyang Stage Station Basin. The calibration results for watershed runoff continuous simulation model were excellent and those for water quality simulation model were generally satisfactory. The module could be used in various studies and designs for watershed runoff and water quality analyses.