As a train control system becomes a large scale and complex, it is necessary to control rigorously the system requirements specification of the train control system at the early phase. This paper describes Use Cases and activity diagrams of ATS functions requirements in the train control system. Basic functions of the train control system refers to IEC 62290-land are suggested. And the basic functions includes train operation without a driver. It is anticipated that this paper will be helpful for the analysis of ATS functions, ATO functions and EI function in the train control system.
The Transactions of the Korean Institute of Electrical Engineers P
/
v.59
no.2
/
pp.158-162
/
2010
PSD is automatically opened and closed when subway train arrive on the station. This system was designed to control electric automatic system. These doors will provide passenger safety, energy saving and a good environment in subway. The monitoring and control systems of PSD are configured so that they can be operated in automatic mode in connection with ATO through the composite control panel in the station control room. The objective of this paper is to obtain high reliability that is essential for monitoring and control systems of PSD. The power supply is based on protection circuit using DC power bridge from two UPS. Also, stable communication system consists of CAN communication line redundancy and RF cross protection algorithm. Monitoring state display results show the validity of the proposed high reliability monitoring and control systems of PSD.
Kim, Seok-Heon;Han, Jae-Mun;Park, Tan-Se;Cho, Yong-Gee
Proceedings of the KSR Conference
/
2011.05a
/
pp.363-367
/
2011
In this paper a simulator for Integrated Onboard Signalling System(IOSS) will be presented and illustrated. IOSS which is integrated with there signalling systems such as ERTMS/ETCS Level 1 ATP(Automatic Train Protection), ATC(Automatic Train Control) and ATS(Automatic Train Stop) is a signalling system for HEMU-400X(Highspeed Electric Multiple Unit - 400km/h eXperiment). HEMU-400X is under development as the next generation high-speed train in Korea. Before conducting a trial run of HEMU-400X with IOSS, we must carry out functional test of IOSS. The simulator is suggested in this paper for testing and verification of IOSS. The simulator can help to test all function of IOSS although a real train and trackside equipments are not existed. Also the simulator can make a fault in trackside equipment intentionally. In that scenario, we can figure out how IOSS handle emergency situations.
The Transactions of the Korean Institute of Electrical Engineers D
/
v.50
no.3
/
pp.114-119
/
2001
An automatic train operation(ATO) system executes the operation of constant speed travelling and fixed point parking by using microprocessors instead of driver's manual operation. This paper describes the mathematical model for the train considering unknown disturbances which consist of start resistance, travelling resistance, slope resistance, curve resistance, and so on. The speed controller of ATO system is designed by considering the disturbances. The simulation is executed to verify the speed control and fixed point parking performance and to compare its performance with that of a PID-type ATO control system under disturbances. Simulation results show that the control performance of gain scheduled control scheme for ATO system is better than that of the conventional PID controller.
Kim, Doo-Gyum;Kim, Min-Seok;Kim, Min-Kyu;Lee, Jong-Woo
Proceedings of the KSR Conference
/
2011.10a
/
pp.211-225
/
2011
Railroad signalling systems are to control intervals and routes of trains. There are ATS(Automatic Train Stop), ATP(Automatic Train Protection), ATO(Automatic Train Operation) and ATC(Automatic Train Control) system. Trains are operated in the section which is met on the signalling system because various signalling systems are used in Korea. On the other words, trains are not operated in the section which is used in the other signalling system. To solve this problem, recently combined on-board system has been developed. The combined on-board system is designed by doubling the ATS, ATP and ATC system. Information signal is received by magnetic sensors in the ATC system and is received by antennas in the ATS and ATP system. Therefore, it is possible to arise transmission problems by magnetic coupling. In this paper, electric model of the ATS and ATP antenna is suggested and interference frequency by the magnetic coupling between the ATS and ATP antenna is estimated numerically. As a results of the magnetic coupling, the value of the magnetic coupling is presented without magnetic induction.
The Transactions of The Korean Institute of Electrical Engineers
/
v.64
no.7
/
pp.1019-1025
/
2015
The performance requirements on the safety-based functionality of railway signal systems have been reinforced and the effort for enhancement of the existing system or development of the new system is being accordingly made. In particular, various technical researches on replacement or improvement of the existing ATS(Automatic Train Stop) signaling system are now in progress for better operational efficiency. In this study, the complementary points for improvement or replacement of the currently used system(i.e., ATS) will be derived in terms of operating efficiency in an integrated operating environment with the newly introduced system(e.g., ATC: Automatic Train Control). This study can contribute to derive the need for improvement of the signaling system by checking the interface problems and comparing between different systems through the analysis of real operation cases in the field. Eventually, this analysis can be applied to prevent and estimate the collision accidents can be caused by the failure of the signaling system in advance. In addition, the results can be used to provide a future direction to secure the reliability in the parallel operation by integration based on different railway signaling systems.
Kim, Min-Kyu;Cha, Gi-Ho;Kim, Min-Seok;Lee, Jong-Woo
Journal of the Korean Society for Railway
/
v.15
no.1
/
pp.42-47
/
2012
There are ATC (Automatic Train Control), ATP (Automatic Train Protection), ATS (Automatic Train Stop) and ATO (Automatic Train Operation) etc. in train control systems. As various train control systems are installed according to sections, on-board signaling systems are installed to apply to the section. Hence, operation flexibility of trains is decreased. In other words, when trains are operated in the section where other train control systems are used, the on-board signaling systems are changed. Recently, a study on the combined on-board signaling system has been researched to solve this problem. The combined on-board signaling system consists of ATC, ATP and ATS device. Because the train control systems are vital, it needs to design the combined on-board signaling system by using k out of n system. In this paper, when k out of n system is applied in the combined on-board signaling system, the reliability and loss cost are analyzed by using failure rate in each device. Hence, the ideal number of systems is presented according to the number of outputs.
Before introducing high speed train, train signal system was operated passively depending on a driver by signal lamp display. Now it is changing to onboard signaling system because of train speed increased(conventional track is 230km/h, high speed track is 380km/h), high speed. low speed freight train operation mixed, operation for high speed train in conventional track and dense operation. ie. ETCS(European Train Control System) Level 1 is introducing. Also, in case of high speed train, the train control system of France was introduced and has operated from 2004, now we have a difficulty for rising speed more than 300km/h because of commercial operation speed limited as 300km/h. Therefore, it need to establish the train control technique according to trackside surroundings and develope standard system like European ERTMS/ETCS, China CTCS(Chinese Train Control System), Japan D-ATC(Digital Automatic Train Control). In this paper, we derive the systematization method for Korea train technique by network-oriented, information-oriented, intelligence-oriented and combination-oriented corresponding train development direction. Proposed method has a merit to prevent cross by mixed operation with existing system and improvement after validity demonstration and system development and supply train system to meet user requirement in exporting.
CBTC(Communication Based Train Control) car-borne equipment, a part of the communication based train control system, mainly consists of automatic train protection(ATP) functions, automatic train operation(ATO) functions as well as the interface functions with other equipment including CBTC wayside equipment and train control management system etc. The CBTC car-borne software implementing ATP/ATO functions is a real-time embedded software requiring a high level of safety and reliability. To satisfy the requirements of the CBTC car-borne software, the model-based design techniques are applied with SCADE(Safety-Critical Application Development Environment) to the development of the CBTC car-borne software. In this paper, we illustrate the process modeling the car-borne ATP/ATO functions satisfying system requirement specification with system requirement management, modeling and document generation tools etc. supported by SCADE. In addition, the developed models corresponding to the ATP/ATO functions are applied to the train with CBTC car-borne equipment through its corresponding EN-50128 standards-compliant C code generated by the code generator. It is shown from the test result that the ATP/ATO models developed by SCADE work well while the trains are running in driverless operation mode.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.