• Title/Summary/Keyword: Automatic Schedule Generation

Search Result 7, Processing Time 0.019 seconds

Method of Deriving Activity Relationship and Location Information from BIM Model for Construction Schedule Management (공정관리 활용을 위한 BIM모델의 공정별 수순 및 위치정보 추출방안)

  • Yoon, Hyeongseok;Lee, Jaehee;Hwang, Jaeyeong;Kang, Hyojeong;Park, sangmi;Kang, Leenseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.2
    • /
    • pp.33-44
    • /
    • 2022
  • The simulation function by the 4D system is a representative BIM function in the construction stage. For the 4D simulation, schedule information for each activity must be created and then linked with the 3D model. Since the 3D model created in the design stage does not consider schedule information, there are practical difficulties in the process of creating schedule information for application to the construction stage and linking the 3D model. In this study, after extracting the schedule information of the construction stage using the HDBSCAN algorithm from the 3D model in the design stage, authors propose a methodology for automatically generating schedule information by identifying precedence and sequencing relationships by applying the topological alignment algorithm. Since the generated schedule information is created based on the 3D model, it can be used as information that is automatically linked by the common parameters between the schedule and the 3D model in the 4D system, and the practical utility of the 4D system can be increased. The proposed methodology was applied to the four bridge projects to confirm the schedule information generation, and applied to the 4D system to confirm the simplification of the link process between schedule and 3D model.

A CSP-based Load Leveling Algorithm for Ship Block Erection Network

  • Ryu, Ji-Sung;Park, Jin-Hyoung;Kim, Hong-Tae;Lee, Byung-No;Shin, Jong-Gye
    • Journal of Ship and Ocean Technology
    • /
    • v.10 no.2
    • /
    • pp.37-44
    • /
    • 2006
  • The erection in shipbuilding is the process to assemble all the blocks one by one in certain order and requires more leveled and efficient schedule than other processes do. However, erection schedule includes too many constraints to be systemized with simple programs and constraints are changed frequently. These difficulties make it rare to find automatic erection schedule generation system with load leveling ability. In this paper, a CSP (Constraint Satisfaction Problem)-based load leveling algorithm using a maximum load diminution technique is proposed and applied to the block erection scheduling of a dock in a shipyard. The result shows that it performs better than currently used scheduling method based on empirical logics. The maximum load of welding length and crane usage are reduced by 31.63% and 30.00% respectively. The deviation of resource usage amount also decreases by 8.93% and 7.51%.

Development of Route Planning System for Intermodal Transportation Based on an Agent Collecting Schedule Information (운송스케줄 정보수집 에이전트 기반 복합운송 경로계획 시스템)

  • Choi, Hyung-Rim;Kim, Hyun-Soo;Park, Byung-Joo;Kang, Moo-Hong
    • Information Systems Review
    • /
    • v.10 no.1
    • /
    • pp.115-133
    • /
    • 2008
  • The third-party logistics industry mainly delivers goods from a place to an arrival place on behalf of the freight owner. To handle the work, they need a transportation route including transportation equipment between the starting place and the arrival place, schedule information for departure/arrival and transportation cost. Actually, automatic searching for an optimal transportation route, which considers arrival and departure points for intermodal transportation, is not a simple problem. To search efficiently transportation route, the collection of schedule information for intermodal transportation and transportation route generation have become critical and vital issues for logistics companies. Usually, they manually make a plan for a transportation route by their experience. Because of this, they are limited in their ability if there is too much cargo volume and a great many transactions. Furthermore, their dependence on the conventional way in doing business causes an inefficient selection of transporters or transportation routes. Also, it fails to provide diverse alternatives for transportation routes to the customers, and as a result, increases logistics costs. In an effort to solve these problems, this study aims to develop a route planning system based on agent, which can collect scattered schedule information on the Web. The route planning system also has an algorithm for transportation route generation in intermodal transportation.

A Study on Automatic Comment Generation Using Deep Learning (딥 러닝을 이용한 자동 댓글 생성에 관한 연구)

  • Choi, Jae-yong;Sung, So-yun;Kim, Kyoung-chul
    • Journal of Korea Game Society
    • /
    • v.18 no.5
    • /
    • pp.83-92
    • /
    • 2018
  • Many studies in deep learning show results as good as human's decision in various fields. And importance of activation of online-community and SNS grows up in game industry. Even it decides whether a game can be successful or not. The purpose of this study is to construct a system which can read texts and create comments according to schedule in online-community and SNS using deep learning. Using recurrent neural network, we constructed models generating a comment and a schedule of writing comments, and made program choosing a news title and uploading the comment at twitter in calculated time automatically. This study can be applied to activating an online game community, a Q&A service, etc.

The Hybrid Road Lighting Control System Design using Solar-Light Generation (태양광 발전을 이용한 하이브리드 도로조명 점등제어 시스템 설계)

  • Hong, Sung-Il;Lin, Chi-Ho
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.12 no.1
    • /
    • pp.109-120
    • /
    • 2013
  • In this paper we proposed the design of the hybrid road lighting control system using solar-light generation. The proposed hybrid road lighting control system be power offer through hybrid controller using Solar-Light Generation, and it is designed so that it can control lighting up. To control supply of continuous power when during power shortages. And the gateway be transmit control command using zigbee to road lighting to ensure that automatic lighting control on human sensing. In this case, the gateway is apply the lighting control algorithm that decisions to the status of the system by a pre-set time schedule and be able to operate. In this paper, the proposed efficiency analysis results of a hybrid road lighting control system was consumed power of 129.6W per day, 3.8KW per month, 47.3KW per annual. As a result, it were able to increase the energy efficiency than existing lighting control system by reduce power consumption of 76.2% and the electricity prices of 76.8%.

Development of an Algorithm for Automatic Quantity Take-off of Slab Rebar (슬래브 철근 물량 산출 자동화 알고리즘 개발)

  • Kim, Suhwan;Kim, Sunkuk;Suh, Sangwook;Kim, Sangchul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.5
    • /
    • pp.52-62
    • /
    • 2023
  • The objective of this study is to propose an automated algorithm for precise cutting length of slab rebar complying with regulations such as anchorage length, standard hooks, and lapping length. This algorithm aims to improve the traditional manual quantity take-off process typically outsourced by external contractors. By providing accurate rebar quantity data at BBS(Bar Bending Schedule) level from the bidding phase, uncertainty in quantity take-off can be eliminated and reliance on out-sourcing reduced. In addition, the algorithm allows for early determination of precise quantities, enabling construction firms to preapre competitive and optimized bids, leading to increased profit margins during contract negotiations. The proposed algorithm not only streamlines redundant tasks across various processes, including estimating, budgeting, and BBS generation but also offers flexibility in handling post-contract structural drawing changes. In particular, the proposed algorithm, when combined with BIM, can solve the technical problems of using BIM in the early phases of construction, and the algorithm's formulas and shape codes that built as REVIT-based family files, can help saving time and manpower.

A Feasibility Study on the Development of Multifunctional Radar Software using a Model-Based Development Platform (모델기반 통합 개발 플랫폼을 이용한 다기능 레이다 소프트웨어 개발의 타당성 연구)

  • Seung Ryeon Kim ;Duk Geun Yoon ;Sun Jin Oh ;Eui Hyuk Lee;Sa Won Min ;Hyun Su Oh ;Eun Hee Kim
    • Journal of the Korea Society for Simulation
    • /
    • v.32 no.3
    • /
    • pp.23-31
    • /
    • 2023
  • Software development involves a series of stages, including requirements analysis, design, implementation, unit testing, and integration testing, similar to those used in the system engineering process. This study utilized MathWorks' model-based design platform to develop multi-function radar software and evaluated its feasibility and efficiency. Because the development of conventional radar software is performed by a unit algorithm rather than in an integrated form, it requires additional efforts to manage the integrated software, such as requirement analysis and integrated testing. The mode-based platform applied in this paper provides an integrated development environment for requirements analysis and allocation, algorithm development through simulation, automatic code generation for deployment, and integrated requirements testing, and result management. With the platform, we developed multi-level models of the multi-function radar software, verified them using test harnesses, managed requirements, and transformed them into hardware deployable language using the auto code generation tool. We expect this Model-based integrated development to reduce errors from miscommunication or other human factors and save on the development schedule and cost.