• 제목/요약/키워드: Assessment system

검색결과 8,419건 처리시간 0.032초

Analysis of Safety Assessment Methodology for Railway Signaling Systems

  • Hwang, Jong-Gyu;Jo, Hyun-Jeong;Yoon, Yong-Ki
    • International Journal of Safety
    • /
    • 제6권2호
    • /
    • pp.38-42
    • /
    • 2007
  • As railway signaling system is computerized, the significance on safety demonstration and assessment has been increased. Therefore, railway signaling system should reflect the needs for safety assessment technique. Various studies on safety assessment technique for railway signaling have been made in Europe and standardization of the requirements for safety acceptance has been initiated by IEC. In order to develop and establish the safety assessment techniques for railway signaling in Korea, we try to review safety assessment activities for signaling system via reviewing relevant case studies and consulting with experts. And also we propose the safety assessment activity/methodology for Korean railway signaling system.

근로자 노출평가제도 내 위험성평가 방법론의 적용 (The Adoption of Risk Assessment Methodology in Exposure Assessment)

  • 김승원;최상준;피영규;김갑배
    • 한국산업보건학회지
    • /
    • 제25권4호
    • /
    • pp.482-492
    • /
    • 2015
  • Objectives: Exposure Assessment for workplace hazards where the exposure level is below occupational exposure limits(OELs) has been performed without considering either the degrees of risk or exposure levels and has failed to lead to intervention in many cases. The objective of this study was to suggest and test an application framework for risk assessment methodology under the current exposure assessment system in Korea. Materials: First, we investigated the exposure assessment systems in Korea and other countries. To adopt some risk assessment techniques, we also analyzed risk assessment systems and compared them to exposure assessment systems. A few suggestions were made. We held a public hearing during an industrial hygiene conference and took surveys using a questionnaire. Results: The first suggestion was to implement the risk assessment and exposure assessment through a "one-stop" system. In that case, one expected question would be who has been doing the jobs so far. In most cases, industrial hygiene consulting services or laboratories have been performing exposure assessment for business owners. Business owners are required to perform risk assessment. As two different groups of people will be required to implement two things in a one-stop system, they need to share information. As an information vehicle to share information, commonly filed survey checklists were suggested. The second suggestion was to categorize exposure level into four groups instead of the current binary divisions based on OELs. In the risk assessment system, exposure level is divided into four groups utilizing the cut-points of 10%, 50%, and 100% of OELs. The same schema can be adopted in the exposure assessment system and different levels of requirements can be assigned for each group. The third suggestion was regarding the regulation system. To provide the suggestions some thrust toward being implemented in the field, changes should be made in the legal system. Two different types of new exposure assessment result reporting forms were suggested. Some investigations such as an ergonomic survey are officially accepted as risk assessment under the current legal system. A few items were suggested to be included in the exposure assessment result reporting to be accepted as risk assessment. A pilot study in two small factories was performed and pointed out the strengths and weakness of our suggestions. Conclusions: Discussions and studies on the improvement of the exposure assessment system have been held for decades and no tangible changes have yet been made. We hope this result can help realize healthy lives for workers in Korea.

수질오염총량관리를 위한 효율적 이행평가방안 연구 (A Study on the Method of Implementation Assessment for Total Maximum Daily Load Management)

  • 박준대;박주현;류덕희;정동환
    • 환경영향평가
    • /
    • 제17권2호
    • /
    • pp.125-132
    • /
    • 2008
  • It is desirable that implementation assessment (IA) should be carried out efficiently in order to make successful progress of Total Maximum Daily Load (TMDL) in watershed management. There are many difficulties in the process of the implementation assessment because of the early stage in the application of TMDL in Korea. This study reviewed the present status of IA and proposed the methodology of its improvement such as flexible application of TMDL ledger, and standardization of assessment index and criteria. The deficient time for assessment period could be corrected by the consideration of the post-procedure after the submission of IA report.

웹기반 온라인 전기에너지 공급지장비 추정 및 정보 시스템의 개발 (Web based Online Outage Cost Assessment and Information System of Electrical Energy)

  • 임진택;최재석;전동훈;서철수;이재걸
    • 전기학회논문지
    • /
    • 제61권9호
    • /
    • pp.1249-1259
    • /
    • 2012
  • This paper proposes a Web Based Online Outage Cost Assessment and Information System(WOOCAIS) for power system outage cost assessment. The proposed WOOCAIS is a kind of web based survey method for outage cost assessment. While conventional survey methods have done outage cost assessment based on survey paper lists collected by post mail or visiting customers, the proposed WOOCAIS is a web based online survey operation and assessment system. Therefore, it can curtail expenditure for survey and also is more convenient than conventional method. It will be set up for actual outage cost assessment system of KEPCO in South Korea in the near future. The WOOCAIS will be applied in various research and actual planning and operation areas. First of all, the assessed results may be not only applied as one of objective function for generation system and grid expansion but also operational planning problems in power system.

통신탑재체 개발 위험관리 Case Study (Case Study of Risk Management on Communication Payload System Development)

  • 정철오;은종원
    • 항공우주시스템공학회지
    • /
    • 제5권2호
    • /
    • pp.8-11
    • /
    • 2011
  • The scope of this paper is to show a risk management plan including how to perform risk assessment and to make a mitigation plan aspects of the communication payload system development. According to system engineering management guide of DoD of USA and risk management plan of satellite communication system, risk assessment and mitigation plan of communication payload system were performed. In this paper, it is indicated the process of risk management and risk assessment procedures as well as mathematical model for risk assessment of DoD guide. It is shown how risk assessment and mitigation plan have implemented in communication payload system development through case study.

신의료기술평가제도 운영의 개선현황과 발전방향 (Improvement Status and Development Direction of New Health Technology Assessment)

  • 이선희
    • 보건행정학회지
    • /
    • 제28권3호
    • /
    • pp.272-279
    • /
    • 2018
  • Since the introduction of new health technology assessment in 2007, benefit coverage process of health insurance related to new health technology has become an upgraded system through the evidence-based decisions. As a result of enforcing this system for 10 years, however, there have been several rising concerns. It needs to support the insufficient evidence of medical technologies, introduce reassessment system for post management of market entry technologies, and improve evaluation methods and process. In addition, there is the possibility of emerging an unheard-of medical technology, fused various categories like artificial intelligence, robot, information technology, physics and life science in the fourth industrial revolution. Now, new updated system introduced to improve new technology assessment, such as 'limited health technology assessment system,' 'system for postponement of new health technology assessment,' 'one-stop service system,' and 'integrated operation of approval for medical devices and new health technology assessment.' Therefore it needs to prepare the improvement plan for new health technology assessment to be established more advanced system, and we have to resolve concerns by communication with various healthcare experts and patients now and for ever.

환경영향평가와 환경정보체계 (Environmental Impact Assessment and Environmental Information System)

  • 김명진;한의정
    • 환경영향평가
    • /
    • 제4권3호
    • /
    • pp.95-102
    • /
    • 1995
  • Environmental Impact Assessment (EIA) in Korea has worked toward environmental conservation and decision making since the Environmental Impact Statement of 1981. In order to implement the EIA process effectively, we have developed a system for and various methods of EIA. Among these methods, the Environmental Information System, which was introduced recently in Korea, can be used to integrate geographic and attribute data effectively. This study includes methods by which we may use the Environmental Information System. First of all, it explains building EIA factors on the natural environment, the living environment, and the socio-economic environment defined by Environmental Impact Statement regulations in Korea. This study also presents some applications of the assessment methods concerning suitability analysis of landfill sites. Finally, it shows the effectiveness of the Environmental Information System in odor impact assessment. Based on these analysis, the study makes some conclusions for the applications of the Environmental Information System.

  • PDF

적응형 뉴로-퍼지(ANFIS)를 이용한 도시철도 시스템 위험도 평가 연구 (A Study on the Risk Assessment for Urban Railway Systems Using an Adaptive Neuro-Fuzzy Inference System(ANFIS))

  • 탁길훈;구정서
    • 한국안전학회지
    • /
    • 제37권1호
    • /
    • pp.78-87
    • /
    • 2022
  • In the risk assessment of urban railway systems, a hazard log is created by identifying hazards from accident and failure data. Then, based on a risk matrix, evaluators analyze the frequency and severity of the occurrence of the hazards, conduct the risk assessment, and then establish safety measures for the risk factors prior to risk control. However, because subjective judgments based on the evaluators' experiences affect the risk assessment results, a more objective and automated risk assessment system must be established. In this study, we propose a risk assessment model in which an adaptive neuro-fuzzy inference system (ANFIS), which is combined in artificial neural networks (ANN) and fuzzy inference system (FIS), is applied to the risk assessment of urban railway systems. The newly proposed model is more objective and automated, alleviating the limitations of risk assessments that use a risk matrix. In addition, the reliability of the model was verified by comparing the risk assessment results and risk control priorities between the newly proposed ANFIS-based risk assessment model and the risk assessment using a risk matrix. Results of the comparison indicate that a high level of accuracy was demonstrated in the risk assessment results of the proposed model, and uncertainty and subjectivity were mitigated in the risk control priority.

대안적 환경평가 시스템 연구: 통합적 의사결정을 위한 새로운 개념의 영향평가모형(APEMI IA MODEL)의 국내 적용방안 탐색 (A Study on the Alternative Environmental Assessment System in KOREA : Applying New Conceptual Model(APEMI IA MODEL) into Impact Assessment for Better Integrated Decision-Making)

  • 김임순;한상욱
    • 환경영향평가
    • /
    • 제14권4호
    • /
    • pp.179-193
    • /
    • 2005
  • As the world's attention turns to sustainability and the considerations of cumulative effects, the concept of Strategic Environmental Assessment(SEA) has become more significant and urgent and increasing number of countries and international organizations now undertake some forms of SEA. The term SEA, however, is variously defined and understood; generally it means a formal process of systematic analysis of the environmental effects on development policies, plans, programmes and other proposed strategic actions. This process extends the aims and principles of EIA upstream in the decision-making process, beyond the project level in which major alternatives are still open. There is a shift toward more integrative approaches and greater use of Environmental Impact Assessment (EIA) and Strategic Environmental Assessment (SEA) as sustainability tools in cooperation with Environmental Management System (EMS). Currently, Korea has EIA system and Prior Environmental Review System (PERS) which is different type of SEA as Environment Assessment (EA) system. APEMI IA MODEL integrated following three pillar(refer to attached figure.1) ; First pillar symbolized decision making cycle with planning process. Second pillar symbolized integrated assessment which tying SEA and EIA with specific impacts assessment(eg: social impact assessment, economic impact assessment, health impact assessment etc) in cooperation with EMS. Third pillar symbolized EA best practical procedure of International Association for Impact Assessment(IAIA). Considering the above, we applied new conceptual model(APEMI IA MODEL) into Impact Assessment for better integrated decision-making in KOREA as an alternative IA system(IS IA MODEL A and B refer to attached figure 4, 5).

친환경 근린주구 인증제도 개발을 위한 국내외 인증제도 비교연구 : 탄소를 중심으로 (A Comparative Research of Assessment System Development for Low Carbon and Sustainable Neighborhood)

  • 신은미;이병호;신성우
    • KIEAE Journal
    • /
    • 제13권3호
    • /
    • pp.21-26
    • /
    • 2013
  • Recently, as the concern over environmental problem has been serious all over the world, carbon has become a key issue to mitigate the problem. In the field of Architecture, various sustainable assessment systems and LCCO2 assessment strategies have been developed, guiding low carbon building while planning. However, assessment system for low carbon neighborhood, which can be more efficient strategy, is still in the stage of research. In this paper, as a research for low carbon assessment system and planning guideline for neighborhood, scope meeting domestic condition has been set and sustainable assessment system for neighborhood, which is similar to low carbon concept, have been compared. LEED-Neighborhood Development, BREEAM-Communities, CASBEE-Urban Development, and GBCC-Apartment Houses were used for comparison. As a result, it is found that those systems has many differences in judging system, aggregating method, scope of evaluation, and relations with a building assessment system. The concern about carbon is not insufficient yet. Finally, assessment system for low carbon neighborhood, which is not only for establishing the plan, but also for giving guideline at the very first state of the plan, should be developed as fast as passible. With the result of this paper, establishment of assessment criteria and the way to measure quantitative $CO_2$ should be studied forward.