• Title/Summary/Keyword: Assembly Process Planning

Search Result 98, Processing Time 0.024 seconds

Welding Distortion Characteristics of Door Openings According to Changing Shape of Stiffener (Door Opening부의 보강재 형상변화에 따른 용접 변형 특성)

  • Lee, Dong-Hun;Seo, Jung-Kwan;Yi, Myung-Su;Hyun, Chung-Min
    • Journal of Ocean Engineering and Technology
    • /
    • v.33 no.2
    • /
    • pp.153-160
    • /
    • 2019
  • Welding often results in welding distortion during the assembly process. The welding distortion of thin-plate structures such as the living quarters of ships and offshore installations is a more significant problem than in the case of thick-plate structures. Pre-stressing/heating and fairing, which are additional works to mitigate and control welding distortion, are inevitable, and the construction planning is accordingly delayed. In order to prevent welding distortion and minimize the additional work during the assembly process, increasing the plate thickness and/or the number of stiffeners may be a simple solution, but it may give rise to problems related to cost and weight. In this study, the welding distortion control effect of the type of stiffeners on the door openings of various living quarter structures was investigated using an experimental method and a finite element method. The results showed the feasibility of mitigating and controlling the welding distortion, and the optimum selection of the type of stiffeners was confirmed.

A Study on the Consideration for Factors Affecting Production Plan Establishment of Precast Concrete Members (PC부재의 생산계획 수립에 영향을 미치는 요인 고찰에 관한 연구)

  • Jun, Young-Hun;Shin, Eun-Young;Yun, Won-Gun;Kim, Kyong-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.253-254
    • /
    • 2023
  • The production plan of Precast Concrete members is closely related to the assembly plan of Precast Concrete members, and is an important management factor for the process planning of Precast Concrete construction. This may cause a delay in the construction period due to manufacturing errors occurring in the production process of members and transportation errors according to the production sequence. Therefore, it is necessary to have an efficient production plan for Precast Concrete members that can produce the necessary quantity from the point of assembly of the members and supply them in a timely manner. This study is a basic study for establishing a production plan for Precast Concrete members, and the purpose of the study is to examine the factors that affect the establishment of a production plan for Precast Concrete members. In this study, the influencing factors according to the production method and conditions when establishing a production plan for Precast Concrete members were considered. In the future, correlation analysis among influencing factors will be carried out, and it is expected that it will be used as basic data for schedule management of Precast Concrete construction and derivation of construction period calculation standards.

  • PDF

An Automated Die Design System for Blanking and Piercing of Stator and Rotor Parts (스테이터 및 로터의 블랭킹 및 피어싱에 관한 자동화된 금형설게 시스템)

  • Park, J.C.;Kim, B.M.;Kim, C.
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.14 no.5
    • /
    • pp.22-33
    • /
    • 1997
  • This paper describes a research work of developing a computer-aided design of blanking and piercing for stator and rotor parts. Based on knowledge-based rules, the die design system, STRTDES2, is designed by considering several factors, such as complexities of blank geometry and punch profile, and availability of press equipment and standard parts. Therefore this system can carry out a die design for each process which is obtained from the result of an automated process planning system, STRTDES1 and generate part drawing and the assembly drawing of die set in graphic forms. Knowledges for die layout are extracted from plasticity theories, relevant references and empirical know-hows of experts in blanking industries.

  • PDF

Process Design of Pulley for Automobile Airconditoner in Cold Forging (자동차 냉방기용 내부 풀리의 냉간 단조 공정 설계)

  • 김동진;정덕진;김병민;최재찬
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.5 no.4
    • /
    • pp.199-206
    • /
    • 1997
  • The inner pulley is an automobile component used as air conditioner clutch assembly. In cold forging of inner pulley, the design requirements are to keep the same height of the inner rib and outer one, and to make uniform the hardness distribution in the forged product. In industry, the design of forging processes is performed based on experience-oriented technology, that is, designers experience and expensive trial and error. Using the rigid-plastic finite element simulations. we design the optimal process conditions, which has a preforming operation. Also the final product configuration of forging has to be designed again in view of metal flow involved in the operation, derived from the finite element simulations. The forged pulley is investigated by checking the hardness distribution and it is noted that distribution has improved to be even and high enough for industrial application.

  • PDF

Real Time Information Sharing Using a Wireless Internet Environment for Effective Panel Shop Operation (무선 인터넷기반 실시간 정보 처리를 통한 판넬 공장의 효과적 운용방법 연구)

  • Chang, Yun-Sung;Shin, Jong-Gye;Lee, Kwang-Kook;Lee, Jang-Hyun
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.43 no.3 s.147
    • /
    • pp.392-398
    • /
    • 2006
  • A prototype of MES(Manufacturing Execution System) applied to panel assembly shop is implemented by using PDA(Personal Digital Assistant) and wireless database web server. The system is developed based on the Dot Net framework. The prototype can exchange the manufacturing execution data between production managers in the control room and workers in the factory through wireless internet communication. Manufacturing model of the panel shop is designed by using IDEF0 and UML method to understand the characteristics of the information and the data entities from the PPR-S view. Several issues in the shop were revealed from the manufacturing model analysis. The most typical problem was the lack of information sharing between the managing workers and the assembly workers. The problem prevents the workers and labors from sharing the process information and continuous workpiece flow In interactive way. To increase the information and data flow, a wireless internet based system is implemented and PDAs are linked together to exchange the process planning data and in-process data between the workers. It is anticipated that PDA and the implemented system can enable the process control at each process stages to obtain the well-organized operation.

Two-Level Hierarchical Production Planning for a Semiconductor Probing Facility (반도체 프로브 공정에서의 2단계 계층적 생산 계획 방법 연구)

  • Bang, June-Young
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.38 no.4
    • /
    • pp.159-167
    • /
    • 2015
  • We consider a wafer lot transfer/release planning problem from semiconductor wafer fabrication facilities to probing facilities with the objective of minimizing the deviation of workload and total tardiness of customers' orders. Due to the complexity of the considered problem, we propose a two-level hierarchical production planning method for the lot transfer problem between two parallel facilities to obtain an executable production plan and schedule. In the higher level, the solution for the reduced mathematical model with Lagrangian relaxation method can be regarded as a coarse good lot transfer/release plan with daily time bucket, and discrete-event simulation is performed to obtain detailed lot processing schedules at the machines with a priority-rule-based scheduling method and the lot transfer/release plan is evaluated in the lower level. To evaluate the performance of the suggested planning method, we provide computational tests on the problems obtained from a set of real data and additional test scenarios in which the several levels of variations are added in the customers' demands. Results of computational tests showed that the proposed lot transfer/planning architecture generates executable plans within acceptable computational time in the real factories and the total tardiness of orders can be reduced more effectively by using more sophisticated lot transfer methods, such as considering the due date and ready times of lots associated the same order with the mathematical formulation. The proposed method may be implemented for the problem of job assignment in back-end process such as the assignment of chips to be tested from assembly facilities to final test facilities. Also, the proposed method can be improved by considering the sequence dependent setup in the probing facilities.

A study on the safety improvement and productivity's increase through continuous preventive maintenance (지속적 계획보전을 통한 생산성 향상 및 안전개선에 대한 연구)

  • Yang Doo Jin;Lee Chang Ho
    • Journal of the Korea Safety Management & Science
    • /
    • v.7 no.1
    • /
    • pp.101-115
    • /
    • 2005
  • This study deals with the procedure of safety improvement, productivity increase ,and tact-time reduction through setting up the system about preventive maintenance. Actually, it is hard to establish and carry out preventive maintenance, even though we recognize the importance of the system concerning time, cost, labor, and so forth. In this study in the viewpoint of cost we are for achieving maximum efficiency by change and reduction of planning process adapted to the special work group. At first we briefly will mention the kind ,the necessity ,and the concept of preventive maintenance ,and then divide the equipment used in the assembly line into the two whether it is necessary or not by way of estimating the breakdown loss ,comparing with general establishment of preventive maintenance and modifying it to the case. At the second step we will establish the operation system of plan management related to production and quality in the special case. Check period and category will be set by dividing the assembly equipment into LCL and Focus in the third step. The forth step will contain the operation procedure in detail. And then we must make check and repair record periodically. Finally, on the basis of the record the selection of checking of significance will be conducted. This results in safety improvement, tact time reduction, and productivity improvement.

A study on the safety improvement and productivity's increase through continuous preventive maintenance. (지속적 계획보전을 통한 생산성 향상 및 안전개선에 대한 연구)

  • YANG DOOJIN;LEE CHANGHO
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2004.11a
    • /
    • pp.131-141
    • /
    • 2004
  • This study deals with the procedure of safety improvement, productivity increase, and tact-time reduction through setting up the system about preventive maintenance. Actually, it is hard to establish and carry out preventive maintenance, even though we recognize the importance of the system concerning time, cost, labor, and so forth. In this study in the viewpoint of cost we are for achieving maximum efficiency by change and reduction of planning process adapted to the special work group. At first we briefly will mention the kind, the necessity, and the concept of preventive maintenance, and then divide the equipment used in the assembly line into the two whether it is necessary or not by way of estimating the breakdown loss, comparing with general establishment of preventive maintenance and modifying it to the case. At the second step we will establish the operation system of plan management related to production and quality in the special case. Check period and category will be set by dividing the assembly equipment into LCL and Focus in the third step. The forth step will contain the operation procedure in detail. And then we must make check and repair record periodically. Finally, on the basis of the record the selection of checking of significance will be conducted. This results in safety improvement, tact time reduction, and productivity improvement.

  • PDF

Implementation of welding material quantity evaluation system combined with ship design CAD system

  • Ruy, Won Sun;Kim, Ho Kyeong;Cho, Yong Jin;Ko, Dae Eun
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.9 no.2
    • /
    • pp.219-226
    • /
    • 2017
  • These days, the great part of design processes in the field of ship or offshore manufacturing are planned and implemented using the CAD system customized for shipbuilding companies. It means that all information for design and production could be extracted and reused at the other useful fields which need cost considerable time and efforts. The typical example is the field of welding material quantity evaluation which is demanded during the construction of ship or offshore structures. The proper evaluation of welding material to be used and the usage of them at the stage of schedule planning are mostly important to achieve the seamless process of production and costing in advance. This study is related to the calculation of welding length and needed welding material quantity at the stage of design completion utilizing the customized CAD system. The calculated welding material quantity would be classified according to welding posture, assembly stage, block, bevel and welding type so as to improve the accuracy of total cost evaluation. Moreover it is possible to predict the working time for welding operation and could be used efficiently for the cost management using the results of this research.

Optimization of Processing Conditions According to Run-out During End-mill Round Machining (엔드밀 원형 가공 시 런아웃에 따른 가공조건 최적화)

  • Lee, Ha-Neul;Choi, Hee-Kwan;Kim, Young-Shin;Jeon, Euy-Sik
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.20 no.1
    • /
    • pp.57-65
    • /
    • 2021
  • With the increased utilization of CAM programs, end-mill processing is most commonly used for machining and metal processing. In particular, hole or shaft machining has high assembly precision, which inevitably leads to high utilization of end mills. However, the analysis of quality characteristics according to the process conditions of end mills is not performed systematically at the site, causing poor quality and productivity. The most influential factor of quality is the runout of the end mill. In this paper, the number of turns of the end mill, number of tool blades, cutting direction, and artificial runout volume were determined to identify the correlation between the epicenter, cylindricality, and surface roughness. Two types of end mills, three levels of runout, three levels of rotational speed, and two cutting directions were considered and 36 rounds of hole processing were conducted. For the analysis of shape characteristics according to the set process variables, the experimental planning method was applied to the measured specimen and the processing characteristics were analyzed according to the runout of the end mill through correlation analysis.