• Title/Summary/Keyword: Architectural development project

Search Result 308, Processing Time 0.028 seconds

PROCESS RESEARCH FOR DEVELOPMENT OF STRUCTURAL COST ESTIMATING MODEL BASED QUANTITY - FOCUSED ON PUBLIC OFFICE BUILDING PROJECT -

  • Soo-Min Kim;Jung-Kyu Seo;Sung-Uk Kim;Chang-Hyun Shin;Yung-Jin Kim;Jae-Youl Chun
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1170-1175
    • /
    • 2009
  • When managers estimate exact construction cost at early stage and design phase, they can reduce construction cost in a more efficient way than to predict at construction stage. But, the current of public construction cost estimation and management is concentrated almost after detailed design phase. Therefore, construction cost management in design development phase to generally use approximate estimating is not correct. Also, the existing construction cost used the method that estimated by gross floor area-based cost estimates at design development phase. So, it is difficult to show the specific amount of materials and basis about the estimated cost of the construction. This study derived problems and limits of construction management at design development phase in case of public office building project through review of literature and current survey, and suggested estimating process model process of structural construction cost go improve these matters.

  • PDF

QUANTITATIVE ANALYSIS FOR THE RISK MANAGEMENT OF A SUPER-HIGHRISE RESIDENCE

  • Shuzo Furusaka;Takashi Kaneta;Makoto Ohsaki;Kazunori Harada;Yasuhiro Orita;Sohsuke Arai;And Norikazu Katoh
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.748-753
    • /
    • 2005
  • In a super-highrise residence project, a project manager needs to form the long-term risk management plan which covers the problems from the beginning of project to the time of demolition. The cause and responsibility for a risk are clarified and quantitatively evaluated through the life cycle of a project. Development of the system which supports a risk strategy effectively is needed as a project becomes complex. In this paper, through the life cycle of a specific super-highrise residence project, a risk phenomenon is specified from a viewpoint of each participant, and the mathematical model is formulated choosing the combination of the optimal strategy against a risk quantitatively within a fixed risk strategy budget.

  • PDF

A PROFIRABILITY MODEL BASED ON PRIMARY FACTOR ANALYSIS IN THE EARLY PHASE OF HOUSING REDEVELOPMENT PROJECTS

  • Kyeong-Hwan Ahn;U-Yeong Gim;Jong-Sik Lee;Won Kwon;Jae-Youl Chun
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.497-501
    • /
    • 2013
  • An important decision-making element for the success of housing redevelopment projects is a prediction of the profitability of redevelopment. Risk factors influencing profitability were deduced through a review of the literature about profitability and a risk analysis developed by a survey of maintenance projects. In addition, a profitability prediction depending on the analysis of risk factors is necessary to judge the business feasibility of a project in the planning stages. A profitability prediction model of management and disposal method, which is calculated by proportional rate and which helps estimate contributions to profitability, is proposed to prevent difficulties in business development. The proposed model has the potential to prevent interruptions, reduce the length of projects, generate cost savings, and enable rational decision-making during the project period by allowing a judgment of profitability at the planning stage.

  • PDF

A Model of Risk Management Plan in the Development Phase of Urban Regeneration Project

  • Kim, Seon-Gyoo
    • Architectural research
    • /
    • v.11 no.2
    • /
    • pp.35-42
    • /
    • 2009
  • Recently, intensive urban redevelopment concentrated on new towns has reduced the number of settled population, and weakened various functions such as commercial, culture, education and welfare in old towns, and made the stagnation and declination of the entire or some parts of old towns. Urban regeneration project means renewing cities' functions in terms of physical, environmental, social, cultural, industrial and economic aspects or revitalizing the existing functions through improvement project in the entire or part of a city, which is now drawing keen attention from the public. However, urban regeneration project is huge in scale, needs long construction period and various complex facilities, and also characterized by complicated relations with many stakeholders. Due to such characteristics, there are many risks in the project. Therefore, systematic risk management is absolutely necessary to efficiently manage various risk factors inherent in urban regeneration project. The purpose of this research proposes a basic model to establish risk management plan and work process in order to help project participants to perform risk management more systematically and rationally in the development phase of urban regeneration project.

Organizational Design for New Product Architecture Development: Comparative Analysis of Sharp and Casio on PDA Development (신규 제품아키텍처 개발을 위한 기업조직의 설계: PDA 개발에 있어 샤프와 카시오의 개발조직 비교 분석)

  • Wi John-H.
    • Journal of Technology Innovation
    • /
    • v.14 no.1
    • /
    • pp.1-30
    • /
    • 2006
  • The purpose of this paper is to analyze the organizational design and management of product development in creating new product architecture by an established firm. For the purpose, the paper put up the organizational design in the process of PDA(Personal Digital Assistant) development of Sharp and Casio which were Japanese major PDA firms in 1990s. PDA is the product born through architectural change from Electronic Organizer. Prior research on the product architecture change and organizational adaptation emphasized that an established firm is difficult to adapt to new product architecture due to the restriction of prior technology or organizational inertia. For overcoming these problems and successful development of new product architecture, organizational design and management in the process of product development becomes essential. In case of Sharp, corporate development project team had been used to overcome the restrictions from architectural knowledge accumulated through previous product. After launching first new PDA by corporate development project team, Sharp created a new division and pushed an evolution of PDA, when new PDA market start to grow up rapidly toward a major market segmentation. As a result, Sharp was able to build up stable PDA project trajectory. However, Casio was late for three years in launching of new PDA architecture because previous division charging of Electronic Organizer tried to develop first new PDA. Casio's PDA development was prohibited by engineers of previous division because new PDA architecture was inferior on user interface and display definition. That is, Casio's first PDA development was restricted by architectural knowledge of previous product.

  • PDF

SUCCESS FACTORS FOR URBAN REGENERATION PROJECT

  • Hae-Rim Kwon;Seul-Ki Lee;Jung-Ho Yu
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1515-1520
    • /
    • 2009
  • Objective of Urban regeneration project is a recovery of urban utilities through a physical, environmental, cultural, industrial and economic regeneration. The current paradigm of urban regeneration is not a simple redevelopment as physical redevelopment or improvement. Urban regeneration project is an overall development including a central commercial capacity and business capacity for administration and management, cultural facilities, sightseeing, a residential area. So Urban regeneration project include a various project. Project management of Urban Regeneration project is widely different with general project management. For that purpose, this research would offer to contribute the success factors of urban regeneration project for successful project. For offering these, this research analyzed the properties of urban regeneration project and success factors of construction project by reviewing a literature. The principal characteristics are variety objectives of each district of urban regeneration project, a diversity of stakeholder's objectives and complex structure of stakeholders, an unstructured decision-making system, a lack of plan for business cooperation. We abstracted factors for urban regeneration from brainstorming and verification by experienced experts. We suggest 2 factors related to achieving a goal effectively and 10 factors related to progress of urban regeneration project efficiently.

  • PDF

신규제품 아키텍처 개발을 위한 기업조직의 설계 -PDA 개발에 있어 샤프와 카시오의 개발조직 비교 분석-

  • Wi, Jeong-Hyeon
    • Proceedings of the Technology Innovation Conference
    • /
    • 2005.06a
    • /
    • pp.44-68
    • /
    • 2005
  • The purpose of this paper is to analyze the organizational design and management of product development in creating new product architecture by an established firm. For the purpose, the paper put up the organizational design in the process of PDA(Personal Digital Assistant) development of Sharp and Casio which were Japanese major PDA firms in 1990s. PDA is the product born through architectural change from Electronic Organizer. Prior research on the product architecture change and organizational adaptation emphasized that an established firm is difficult to adapt to new product architecture due to the restriction of prior technology or organizational inertia. For overcoming these problems and successful development of new product architecture, organizational design and management in the process of product development becomes essential. In case of Sharp, corporate development project team had been used to overcome the restrictions from architectural knowledge accumulated through previous product. After launching first new PDA by corporate development project team, Sharp created a new division and pushed an evolution of PDA, when new PDA market start to grow up rapidly toward a major market segmentation. As a result, Sharp was able to build up stable PDA project trajectory. However, Casio was late for three years in launching of new PDA architecture because previous division charging of Electronic Organizer tried to develop first new PDA. Casio's PDA development was prohibited by engineers of previous division because new PDA architecture was inferior on user interface and display definition. That is, Casio's first PDA development was restricted by architectural knowledge of previous product.

  • PDF

A Progress-based Expert System for Quantitative Assessments of Project Delay

  • Yoo, Wi Sung
    • Architectural research
    • /
    • v.10 no.1
    • /
    • pp.41-48
    • /
    • 2008
  • Construction projects have frequently exceeded their schedule despite reliable estimates at the start of a project. This problem was attributed to unpredictable causes at the beginning and to shortage of proper tools to accurately predict project completion date. To supplement this difficulty, project managers need a comprehensive system that can be employed to monitor the progress of an ongoing project and to evaluate potential delay for achieving the goal on time. This paper proposed a progressive-based expert system for quantitative assessments of project delay at the early stages of the execution. Furthermore, the system is used to inspect the change of the uncertainty on completion date and its magnitude. The proposed expert system is helpful for furnishing project managers a warning signal as a project is going behind schedule and for tracking the changed uncertainty at a desired confidence level. The main objectives of this paper are to offer a new system to overcome the difficulties of conventional forecasting tools and to apply a construction project into the system to illustrate its effectiveness. This paper focuses on construction phase of project development and is intended for the use by project managers.

The Minnesota Project - Rebuilding Seoul National University's Architectural Engineering Department and the Formation of U.S.-Oriented Architectural Academia, 1954-1962 - (미네소타 프로젝트 - 서울대학교 건축공학과의 재건과 미국 지향 건축학계의 형성, 1954-1962 -)

  • Park, Dongmin
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.34 no.9
    • /
    • pp.117-128
    • /
    • 2018
  • The United States understood the fostering of pro-U.S. elites in "free world" countries as an important Cold War weapon. From 1954 to 1962, the U.S provided considerable assistance to Seoul National University (SNU) for its postwar rehabilitation and future development in terms of repair and construction of campus buildings, equipment and book purchases, and faculty exchanges. With the aid of this educational assistance project widely known as the Minnesota Project, SNU was reborn with an academic orientation to the U.S., separating itself from the Japanese education that was its origin. This study argues that the Minnesota Project played an important role in crafting SNU's architecture program and the exchange program's recipients as key "knowledge brokers." For individual trainees, experience in the U.S., as opposed to a backwards situation in their homeland, had allowed them to recognize the U.S. as an ideal source of knowledge. Since the Minnesota Project, SNU's Architectural Engineering Department was filled with faculty members who had trained or studied in the U.S., which became a significant distinction of SNU's architecture program in sharp contrast to its counterparts at Hanyang University and Hongik University where most of the faculty members studied in Japan during the Japanese colonial period. As many graduates of SNU had been appointed as faculty members in newly-founded architecture programs in South Korea, a hierarchical diffusion path had emerged in architectural education that led from SNU to other school's architecture programs, with the U.S. at the apex. The legacy of the Minnesota Project extended over the next few decades, in which studying architecture in the U.S. was recognized as a shortcut to success in the field.

A REAL-TIME PMIS BASED INDUSTRIAL CONSTRUCTION PROJECT MANAGEMENT SYSTEM

  • Kyusung Lee;Hojeong Song;Jaehyun Choi
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.352-358
    • /
    • 2013
  • As amount of information in construction industry is growing, the role of information system in project management is becoming increasingly important. With the emerging IT application to the advancing construction industry, construction project management system with advanced technology has been progressed vigorously to improve construction productivity and management efficiency. Recently, a web-based Project Management Information System (PMIS) is developed to support decision-making process by efficiently managing project related information generated from various discipline. Many firms are in the process of developing the PMIS system or already have been applied the system to various projects. However, PMIS is still in its early stage of development to be applied at industrial plant construction projects that process management is significantly emphasized for the successful execution of the project. With the complexity of the industrial plant projects, the industry practitioners need to be able to visualize the construction schedule information to manage the project efficiently. This study suggests methodologies for improving PMIS specialized for industrial plant piping construction projects to estimate the baseline schedule and performance measurement more accurately by developing a framework for the piping construction projects. By using this developed system, the researchers expect that piping construction projects will be more efficiently managed on a real-time basis through measuring progress of piping at each and every state of progress milestone and provide management with opportunities to forecast the level of efforts required to execute the remaining work scope in a timely manner

  • PDF