• Title/Summary/Keyword: Architectural Firms

Search Result 86, Processing Time 0.021 seconds

Improving the Performance of Innovation in a Knowledge-based Design Service Industry Using DEA-Tier - Focused on the Architectural Design Offices - (DEA-Tier를 이용한 국내 지식기반 건축서비스업의 혁신 성과 개선에 관한 연구 - 건축설계사무소를 중심으로 -)

  • Kim, Ji-Sun;Lee, Hoon-Ku;Lee, Yoon-Sun;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.160-170
    • /
    • 2013
  • Knowledge-based Service Industry is an industry that creates added value through the production, processing, and use of knowledge. Comparing to other service industries, it is innovation-oriented business endeavors having the characteristics that exert the great influences on other fields. Meanwhile, however, research efforts thereof are yet insignificant. In this study, we analyzed the innovation performance of architectural design office which creates knowledge services, having raised the necessity of innovation of the design office. The innovation performance were classified according to the extent of efficiency of the architectural design office making use of DEA-Tier analysis, and, for those architectural design offices that showed significant differences in efficiency, we presented the case studies of the firms that were substantial benchmarking targets from short, medium, and long-term perspectives.

A Study on the Establishment of Rule-Based Modules for Automating the Design of Interior Finishes in Architectural Buildings (건축 내부 마감 자동 상세화를 위한 규칙 기반 모듈 구축 방안에 관한 연구 - 바닥, 벽 및 천장을 중심으로 -)

  • Ha, Dae-Mok;Yu, Young-Su;Koo, Bon-Sang
    • Journal of KIBIM
    • /
    • v.12 no.1
    • /
    • pp.42-54
    • /
    • 2022
  • BIM facilitates data transparency and consistency through three-dimensional parametric modeling and promotes the accurate managing and sharing of project information. In Korea, however, BIM-based detailed design of architectural interior finishes required during the Construction Documents phase increases the burden on architectural firms due to frequent design changes and manual workload. Therefore, the purpose of this study was to establish rule-based modules using parametric modeling that automates repetitive tasks that occur during the detailed design of interior finishing. Interviews with practitioners were conducted to analyze the major finishing elements. Of these floors, walls, and ceilings, which were the most rudimentary and common items, were selected as the subjects of the study. The modules developed in this study have two functions. One is to create new finish types, and the other is the automatic modeling of new types into rooms. For these functions, parameters that belonged to each finish and room element in a BIM model were analyzed and valid parameters directly used for parametric modeling were derived. Then, based on these parameters, rule-based modules for three elements, I.e., floors, walls, and ceilings were constructed with Revit Dynamo, and the effectiveness of the modules was verified with a pilot test. In conclusion, this study suggested a series of processes for automatic finishing to improve the efficiency of BIM-based architectural detailed design of finishes and to contribute in solving the chronic problems occuring during current design processes.

Marketing Strategies of Name Brand Apartments According to the Brand Life Cycle (Brand Life Cycle에 의한 브랜드아파트의 마케팅 전략)

  • Choi, Young-Kon;Min, Kyung-Min;Ahn, Byung-Ju;Lee, Yoon-Sun;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.656-661
    • /
    • 2007
  • Breaking from the past convention, most construction firms are lotting out their apartments with their own brand names. They don't have, however, differentiated marketing strategies based on unique brand awareness. Rather, virtual absence of marketing strategies has brought about unfiltered introduction of architectural elements of the competition and excessive advertising efforts. Consequently confusion is at hand for consumers' purchase decision since they are not aware of the differences between the apartments. The purpose of this study is to make consumers have clear brand awareness by presenting appropriate brand strategies based on sound marketing theories for construction firms.

  • PDF

Research of Application of Rapid Prototyping in Architectural Industry and Its Educational Status - With Focus on the Mid-size Firm and Graduate CAAD Education in U.S- (건축 산업에서의 신속조형기술 응용과 교육 연구 -미국의 중소규모 사무소와 대학원 CAAD 교육을 중심으로-)

  • Jung, C. H.
    • Korean Journal of Computational Design and Engineering
    • /
    • v.9 no.1
    • /
    • pp.77-91
    • /
    • 2004
  • Integrating computer-aided design with computer-aided fabrication and construction will fundamentally redefine the relationship between design and construction. Rapid prototyping(RP) is evaluated as one of the integration method available but it has been regarded as very expensive and complex design evaluation tool and is only suitable for large mechanical design shops in automobile and aerospace industry. However current status of rapid prototyping is changing since the new generation of RP equipment, less expensive and more user-friendlier, now can be installed and use in design firms. Simultaneously increasing use of 3D CAAD software is also helping to use rapid prototyping widely. It is crucial to acknowledge rapid prototyping technologies are not only for avant-garde architect such as Frank O. Gehry but ordinary 90% architects, who can have benefit from fast and cost-effective technology. With its fast development and adaptation in architectural industry, it is quite necessary to include rapid prototyping education in regular CAAD courses either undergraduate or graduate level.

A Study on the Characteristics of Design Processes for Healthcare Architecture (의료시설의 디자인 과정 특성에 관한 연구)

  • Choi, Kwang-Seok
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.15 no.2
    • /
    • pp.13-22
    • /
    • 2009
  • Healthcare facilities design in Korea actually has begun from the late 1960s and early 70s and accomplished unprecedented growth qualitatively and quantitatively. In the 1970s and the 80s, domestic healthcare design was greatly influenced by the Japanese. In the 1990s, under the competitive healthcare-market environment, great concerns were dominated to american healthcare facilities than the Japanese which have comparatively monotonous architectural forms. In the meantime, domestic healthcare architecture firms have continuously learned about design know-hows of the US, Japan and eve European countries. Now I would like to evaluate the they are stepping onto in level that can equally compete with the advanced foreign architectural design companies. This study, investigating and consolidating architects' ideas and contents which experienced in design processes of real projects in current healthcare field, is purposed to find characteristics in design work of healthcare facilities and share the experiences. Method of research executed questionnaires to 22 special designers who design each 20 healthcare facilities. Questionnaire attained form July to October, 2008. Hereafter, it is going to present adjusting design process for healthcare facilities by analyzing various debris that is made in the process with design results that is made through design process.

  • PDF

An Analysis of the Competitive Structure of the Construction Management Market (건설 사업관리 시장의 경쟁 구조분석)

  • Youn, Ha-Jung;Lee, Yoon-Sun;Kim, Jae-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.2
    • /
    • pp.193-201
    • /
    • 2013
  • Recently there has been insignificant growth in the Korean construction management (CM) market, in comparison to the previous year. However, despite stagnation or even decreasing growth trends, the number of domestic companies participating in the CM market has increased rapidly. As follows, market movements of CM despite trending in stagnant growth or decrease, the market has been increasing firms which entry the market. The reasons for such dynamic change must be examined first, in order to facilitate analysis of its competitive structure. This study aims to examine the market competition structure and analyze the reason for proliferation of companies in the sick CM market. This study employs market concentration ratio and DEA-based Malmquist productivity indices to analyze the competitive structure of the CM market. Results reveal that the CM market has been monopolized by a few companies, but this is gradually changing. In addition, these companies were not productive, but there has been a gradual increase in the productivity index. Therefore, this study, which provides the direction index of the CM market, has implications for all major stakeholders in this market.

Development of Integrated Cost-Schedule Management Guidelines for EPC Modular Projects (EPC 모듈러 프로젝트의 원가·공정 통합연계관리 지침서 개발)

  • Kim, Donghee;Ha, Minhui;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.3
    • /
    • pp.76-84
    • /
    • 2020
  • The rate of application of the modular plant in the plant industry is increasing, and for the success of the modularization projects, it is essential to develop and implement a systemized methodology across all phases of the project. However, Korean EPC firms lack project management capability when it comes to apply standardized methodology. Therefore, it is important to establish and systematize the cost/schedule integrated management method which are the two core elements of project management technology. This study was conducted to develop a methodology and guidelines for integrated management process for modular plant projects. The researchers developed a methodology for planning and managing cost and schedule, and integrated by module unit. Integrated cost and schedule methodology and guidelines developed can be used for various EPC modular plant projects to enhance the efficiency of project management.

Analysis of the Causes of Defects in Fenestration Construction and Their Impacts on Construction Quality - Focused on Door Hardware - (창호철물공사 하자발생 원인과 시공품질 영향분석에 관한 연구 - 문(Door)에 사용되는 창호철물 중심으로 -)

  • Moon, Sang-Deok;Chung, Jae-Min;Ock, Jong-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.4
    • /
    • pp.341-350
    • /
    • 2013
  • For this study, a series of interviews with engineers in the Korean construction industry was carried out through a formal workshop format to analyze the causes of the inferior quality of builders' hardware. The authors established the causes of defects in window hardware construction in relation to the three aspects of system, design, and construction as involving the following seven factors: lack of system (including low ability to create construction specifications); low social awareness of the importance of window hardware; low technical capability to create design drawings; low design costs; small manufacturing capacity; low construction cost; and short duration of construction. Among the seven causes, the biggest cause of defects in window hardware construction is the lack of a system (low ability to create construction specifications), followed by low technical capability to create design drawings. In addition, this study carried out basic research to create measures to prevent defects in window hardware construction by analyzing how such causes of defects are distributed depending on the scale of architectural firms and construction companies during actual projects.

Measuring Management Efficiency of Architectural Firms in Korea using DEA/AR Models (DEA-AR 모형을 활용한 건축사사무소의 효율성 비교분석)

  • Kim, Sung-Sik;Park, Jung-Lo;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.125-126
    • /
    • 2012
  • Domestic architect office from a period of high growth from the 1970s to the '80s has been established as some of the large corporations or publicly traded corporation. 1997 IMF has pointed out there is a lot of need for improvement activities in accordance with the construction recession since the 2008 global financial crisis. In order to address these causes, the company's continuous efficient operation for accurate efficiency and competitiveness analysis was required. Leverage financial ratio indicators Study Using Data Envelopment Analysis Data Envelopment Analysis (DEA) model, how to find a benchmark for the improvement of the efficiency of inefficient enterprises in various sectors being. In this study, a comparison of the conventional DEA model and the DEA-AR model is used to analyze the efficiency and domestic architect office is to improve the management efficiency.

  • PDF

A Study of Design Process after Hospital Design Competitions - focused on the case study of current hospital design competitions - (병원건축 설계경기 후 설계진행에 관한 연구 - 최근 설계경기 사례를 중심으로 -)

  • Lee, Hae-Won;Lee, Jung-Man
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.7 no.2
    • /
    • pp.47-58
    • /
    • 2001
  • As one designs a building, one should have to consider its characters and functions according to its own use. Recently many professional buildings used to be designed by specialized design firms with their own experience and specialty to vitalize the functions of the buildings. Especially the design of the hospital is really needed more concern from the beginning of design ordering because it is pursuing the most specialty in architectural designs and therefore it can not be managed with general architects. The purpose of this study is to present the references for resonable promotions of hospital design in the future with the analysis of the suitability in hospital design ordering and the process after design competition in Korea.

  • PDF