• Title/Summary/Keyword: Architectural Factors

Search Result 1,159, Processing Time 0.055 seconds

A Study on the Architectural Planning Criteria and Factors for Secondary Schools (중등학교 건축 규모계획 기준에 따른 결정인자 분석에 관한 연구)

  • Meang, Joon-Ho
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.2 no.2
    • /
    • pp.35-51
    • /
    • 2002
  • This study is on the architectural planning and factors for secondary schools. The methods in the approach to the results were settled. A sample of factors that affect architectural scale design were drawn from architectural design direction for a secondary school architectural scale estimation direction. These factors arc broken into primary elements and situational elements. Primary elements include students, teachers, and time. Situational elements include public use percentage, classroom percentage, unit area, coefficient of utilization, etc. The 7 architectural planning criteria to cover changes of various architectural scale design elements are the following; 1) consideration of students selection percentage, 2) consideration of the number of teachers, 3) a variety of possible classrooms, 4) organic operation, 5) efficient time management, 6) consideration of different teaching method depending on subjects, 7) coefficient of utilization with flexibility.

  • PDF

A Study on the Deriving Factors of Professionalism for the Analysis of Architectural Professionalism in Korea (한국 건축분야 전문가주의 분석을 위한 전문가주의 구성요소 도출에 관한 연구)

  • Jeong, Tae-Jong;Choi, Jae-Pil
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.35 no.9
    • /
    • pp.49-55
    • /
    • 2019
  • The purpose of this study is to derive the factors of professionalism through the literature review about professionalism to analyze the architectural field of professionalism in Korea. Factors of professionalism are defined through definition and characteristics of professionalism, historical progress of professionalism formation and development in Western nations and Korea, and various arguments and attributes by sociologists and other educational experts. Derived factors of professionalism are expertise, systemicity, exclusiveness, autonomy, and publicness. Expertise and systemicity are related with basic aspect, exclusiveness and autonomy are related with structural aspect, and publicness is related with attitude aspect of professionalism. The synchronic structure and diachronic change of architectural professionalism in Korea can be analyzed through derived five factors-expertise, systemicity, exclusiveness, autonomy, and publicness.

Extraction of Profitability Decline Factors of Small-sized Architectural Design Firm (소규모 설계엔지니어링 업체의 수익성 저하 요인 추출)

  • Yang, Jin-Kook;Choi, Hye-Ji;Lee, Min-Hyeon;Jo, Hyeon-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.115-116
    • /
    • 2015
  • Recently, most of the construction companies is being degraded due to the overall construction recession profitability. Among them, order quantity of the architectural and engineering firms are trend to decrease except for large companies over a certain size. In particular, small companies are facing more difficulties. This study was conducted expert interview method to extract the main cause of profitability degradation of a small-sized design engineering companies. And, we are proposes a critical influence factors through survey about extracted factors. The results of this study are expect to help the competitiveness of architectural design firm.

  • PDF

Analysis on Electricity Consumption Characteristics of Apartments based on Architectural Planning Factors - foused on Households with a total area of 132~165㎡ in Seoul- (공동주택 건축계획요소에 따른 전기 에너지 소비특성 분석 - 서울지역의 40평형(132~165㎡)의 단위세대 전기에너지 사용량을 중심으로 -)

  • Park, So-Yun;Lee, Yun-Jae;Lee, Hyun-Soo
    • KIEAE Journal
    • /
    • v.11 no.5
    • /
    • pp.107-117
    • /
    • 2011
  • This paper aims to analyze architectural planning factors that could contribute to reductions in electricity consumption in the household of apartments, to apply energy saving methods at the design phase. These six architectural planning factors were orientation, building type (flat, tower block), standard floor access type (corridor access type, stair case type, EV hall access type), household location (floor), household opening type (one side opening, right angle opening, two sides opening or three sides opening), and bay on the facade (one bay, two bays, three bays, four bays), and these were derived from literature review. Household electricity consumption data were gathered from 2168 households with a total area of 135~150$m^2$ of 6 apartment complexes over 1000 households in Seoul. The annual characteristics of electricity consumption according to architectural planning factors were analyzed. And, variances between groups with respect to the mean of summer, winter, and annual electricity consumption according to each architectural planning factors were analyzed using ANOVA and t-test. The results showed that an annual electric energy saving of over 1000kWh was facilitated by these planning factors. In addition, high energy efficiency architectural planning factors based on the analysis were as follows: southwest orientation, flat type, corridor access type and staircase type, household loation below the 20th floor, two sides opening and three sides opening, and 2 bays and 3 bays.

Seismic Behavior Factors of RC Staggered Wall Buildings

  • Kim, Jinkoo;Jun, Yong;Kang, Hyunkoo
    • International Journal of Concrete Structures and Materials
    • /
    • v.10 no.3
    • /
    • pp.355-371
    • /
    • 2016
  • In this study seismic performance of reinforced concrete staggered wall system structures were investigated and their behavior factors such as overstrength factors, ductility factors, and the response modification factors were evaluated from the overstrength and ductility factors. To this end, 5, 9, 15, and 25-story staggered wall system (SWS) structures were designed and were analyzed by nonlinear static and dynamic analyses to obtain their nonlinear force-displacement relationships. The response modification factors were computed based on the overstrength and the ductility capacities obtained from capacity envelopes. The analysis results showed that the 5- and 9-story SWS structures failed due to yielding of columns and walls located in the lower stories, whereas in the 15- and 25-story structures plastic hinges were more widely distributed throughout the stories. The computed response modification factors increased as the number of stories decreased, and the mean value turned out to be larger than the value specified in the design code.

A Study on the Operating System of the Architectural Standard Scale of Length(尺度, Korean foot) used in the Hwasong City Wall in the 18th Century (척도운용체계를 통해 본 18세기 화성건축의 건축구성에 관한 연구)

  • Lee, Ho-Rak;Lee, Sang-Hae
    • Journal of architectural history
    • /
    • v.6 no.2 s.12
    • /
    • pp.65-77
    • /
    • 1997
  • The Hwasong City Wall was built for three years(1794-1796), but the real construction term was taken only 28 months. The wall and the buildings on the wall were built simultaneously, and the esttimated construction cost was highly restricted. These conditions were main factors for considering the high efficiency of construction productivity. This study examines these factors that are reflected in the operating system of the architectural standard scale of length, the architectural composition system in the Hwasong City Wall to reduce the construction cost. Through the study, following factors are found. 1.The rule of multiple proportion is found in the relationship between the partition distance, that is, span and the height of the girder which is related to the productivity of ready-made building members. 2.The ruling grade system of scale in the component members is found in the chang-bang(창방, penetration members)

  • PDF

A PROFIRABILITY MODEL BASED ON PRIMARY FACTOR ANALYSIS IN THE EARLY PHASE OF HOUSING REDEVELOPMENT PROJECTS

  • Kyeong-Hwan Ahn;U-Yeong Gim;Jong-Sik Lee;Won Kwon;Jae-Youl Chun
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.497-501
    • /
    • 2013
  • An important decision-making element for the success of housing redevelopment projects is a prediction of the profitability of redevelopment. Risk factors influencing profitability were deduced through a review of the literature about profitability and a risk analysis developed by a survey of maintenance projects. In addition, a profitability prediction depending on the analysis of risk factors is necessary to judge the business feasibility of a project in the planning stages. A profitability prediction model of management and disposal method, which is calculated by proportional rate and which helps estimate contributions to profitability, is proposed to prevent difficulties in business development. The proposed model has the potential to prevent interruptions, reduce the length of projects, generate cost savings, and enable rational decision-making during the project period by allowing a judgment of profitability at the planning stage.

  • PDF

A Study on the Influence of Hotel's Architectural Attributes on Operating Revenue - Focused on Tourist Hotel in Seoul - (호텔의 건축적 속성이 운영 수익에 주는 영향에 관한 연구 - 서울지역 관광호텔을 중심으로 -)

  • Kim, Hyun-Kwang;Whang, Hee-Joon
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.34 no.8
    • /
    • pp.43-50
    • /
    • 2018
  • The purpose of this study is to analyze the effect of architectural attributes on operating revenue by concentrating on the facility side and to investigate how much individual architectural factors can affect operating revenue. The time range of this study is limited to 2015, and the spatial range is limited to a tourist hotel in Seoul that can be easily surveyed and verified. The analysis method is to confirm the significance and influence of each attribute through regression analysis. According to the results, The room part such as number of rooms or area showed a relatively low correlation with "revenue per available room (Rev.PAR)" than "average daily rate (ADR)", but showed a high correlation with non - architectural attributes such as auxiliary facilities and chain. This shows that factors that influence the operating profit of hotel are not the part of the room but the other factors such as the auxiliary facilities work more. In addition, the presence of spa and the number of auxiliary facilities in the hotel have a positive effect on the operating profit of the hotel due to the non - architectural attributes. This is expected to provide a new direction for future research in studying hotel facilities.

EVALUATING PRODUCTIVITY-AFFECTING FACTORS ON FINISHING WORKS IN HIGH-RISE HOUSING CONSTRUCTION

  • Chi-Joo Lee;Jae-Jun Kim;In-Suk Park;Sang-Hyo Lee;Yoon-Sun Lee
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.398-406
    • /
    • 2007
  • Constructing high buildings is a global trend, and skyscrapers for residing are also increasing. But a period of works for finish construction is different depending on a company while a period of works for frame construction of skyscrapers for residing in the country is regular when considering a difference of a method of construction, and the increase of repeated construction for high buildings and number of related process for finish construction are stressing the importance of improving productivity through construction management and plan for works. Because there are many compositive factors affecting productivity other than technical factors, we should intensively study the way of improvement and prevention preferentially through analyzing factors affecting productivity. So in this study, we present important management factors for making systematic strategy and plan for improvement of productivity by finding factors affecting productivity depending on the degree of importance unifying factors affecting productivity of plan factor(internal factor of construction process) and management factor(outer factor of construction process).

  • PDF

Seismic behavior factors of buckling-restrained braced frames

  • Kim, Jinkoo;Park, Junhee;Kim, Sang-Dae
    • Structural Engineering and Mechanics
    • /
    • v.33 no.3
    • /
    • pp.261-284
    • /
    • 2009
  • The seismic behavior of a framed structure with chevron-type buckling restrained braces was investigated and their behavior factors, such as overstrength, ductility, and response modification factors, were evaluated. Two types of structures, building frame systems and dual systems, with 4, 8, 12, and 16 stories were designed per the IBC 2003, the AISC LRFD and the AISC Seismic Provisions. Nonlinear static pushover analyses using two different loading patterns and incremental dynamic analysis using 20 earthquake records were carried out to compute behavior factors. Time history analyses were also conducted with another 20 earthquakes to obtain dynamic responses. According to the analysis results, the response modification factors turned out to be larger than what is proposed in the provision in low-rise structures, and a little smaller than the code-values in the medium-rise structures. The dual systems, even though designed with smaller seismic load, showed superior static and dynamic performances.