• Title/Summary/Keyword: Architectural Deign

Search Result 4, Processing Time 0.018 seconds

A study on the Practical Adaptation of BIM Programs for Architectural Education (건축교육에서 BIM 프로그램 적용에 관한 연구)

  • Shin, Dong-Chul
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.11 no.4
    • /
    • pp.57-66
    • /
    • 2011
  • The advent of BIM(Building Information Modeling) design process based on the digital media has brought innovation to the production and management of AEC industry. Accordingly the need for educating BIM professionals has been radically increased both in the real world practice and in academia. Some developed countries have already been studying and establishing the optimized curriculum in the academic architecture courses for BIM based education with multi_efforts using the digital media as design processing tools focused on educating architectural professionals with creativity and productivity. However in the domestic education systems, it is hardly found that researches and curriculums deal with the BIM education in the academia. Thus the objective of this paper is to investigate the architectural design pedagogy in the advanced digital media setting in response to the urgent need for BIM education. This study focuses on developing the curriculum based on practical adaptation of BIM programs for architectural education. It aims to provide students with the basic understanding of BIM theory and the practice of BIM tools as an instrument enhancing the creativity for architectural design. Thus this study proposes an BIM curriculum for the students who first encounter the notion and knowledge of BIM during their academic years. And the education result after the application of this curriculum has been analysed through the students questionnaires before and after the lecture.

A Study on the adequacy of Hospital Architecture Deign-Build and Improvement of Assessment Criteria - Focus on the case of Architectural Planning Design Change - (병원건축 일괄입찰방식의 적합성과 평가기준 개선방안에 관한 연구 - 건축계획의 설계변경사례를 중심으로 -)

  • Hong, Seung-Min;Yang, Nae-Won
    • Korean Institute of Interior Design Journal
    • /
    • v.21 no.2
    • /
    • pp.215-222
    • /
    • 2012
  • Design-build is expanding gradually in large construction projects over 10billion won, and continue to work in health care facilities is increasing in this way. This constructional method in health care facilities, despite the many advantages, many problems caused by design changes are being raised. Raises the question of design changes on the side of construction contract, such as approval systems have been studied in the field of construction. The purpose of this study design in aspects of architectural planning on changing the grasp of the issues outlined in the ITB and bid evaluation criteria through consideration of the basic plan for improvement guidelines and evaluation criteria is presented. In conclusion, Design build, according to the presence of existing users are more likely to lead to design changes. Thus, hospital architecture, depending on how it is considered that constructional methods. And evaluation items of ITB(Invitation To Bidder) for a large part of the change in the variables evaluated in the hospital building is not suitable for the design build. Instead, the overall shape of the building and department, unit type and size, vertical and horizontal parts of the circulation system in the shape of the building that does not change in structure and etc should be considered for evaluation.

  • PDF

A Study on the Characteristics of Gerrit Rietveld's Furniture Design (Gerrit Rietveld 가구디자인의 조형특성연구)

  • Suh, Jeong-Yeon
    • Journal of the Korea Furniture Society
    • /
    • v.20 no.4
    • /
    • pp.374-387
    • /
    • 2009
  • Gerrit Rietveld who is Dutch architect and furniture designer had explored the plastic abstractness based on the universality of De Stijl principle. He had tried to expand the boundary of furniture design bound to traditional form and decorative aesthetics. Beginning of 20th century, he opened the new aesthetic realm of pure and abstract value for furniture design for the first time. Through this research, the results can be summarized as follows. The characteristics of his deign are abstractness, spatial consideration and tectonic construction. The abstractness is attained by simplifying constructional material into geometrical forms such as straight line, rectangle and square. And he adopted unconventional way of construction in order to increase this abstractness. The space included in his furniture can be expressed in the new technology of joint, the visual transparency using linear material, and the destruction of corners. All these aspects harmoniously helped the feeling of architectural space of flow. Through the exposed frame of furniture, Rietveld emphasized on the tectonic construction by methodological treatment such as piling-up or overlapping material. The characteristics of Gerrit Rietveld's design are abstract, spatial and tectonic. These aesthetical tendencies could be understood as a junction between De Stijl's principles and modern architecture's spatial preferences-flow and extension of space-.

  • PDF

Probabilistic Earlier GMP Calculation Method for Apartment Using CM at Risk (CM at Risk를 적용한 공동주택의 확률론적 초기 GMP 산정방안)

  • Hyun, Chang-Taek;Go, Gun-Ho;Jin, Zhengxun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.3
    • /
    • pp.295-303
    • /
    • 2018
  • In the DBB delivery system, the design stage and the construction stage are separated. Because of this, design changes frequently occur, and problems such as construction cost overrun, schedule delay, and quality deterioration happen as well. Recently, in the construction industry CM at Risk(CM@R) delivery system, which can systematically solve the above-mentioned problems of DBB delivery system, meet various demands of clients, and overcome the limited cost and period. In the CM@R delivery system, the contractor negotiates for a maximum guaranteed price(GMP) with the client at the design stage, and the CM performer carries out the construction within the GMP. However, uncertainties are inherent in the GMP calculation because the calculation is based on unfinished drawings and documents. In this study, a Probabilistic Earlier GMP Calculation Method by combining a probabilistic tool of Monte Carlo simulation with a case based reasoning is proposed so that the uncertainty in GMP calculation is reflected. After the earlier GMP is calculated, a process to calculate the $2^{nd}$ GMP at the time of around 80 % of detailed deign and to negotiate with the client to fix the final GMP is proposed. The Probabilistic Earlier GMP Calculation Method is verified through the case study. In this study, researchers set the range of GMP through the proposed probabilistic GMP calculation and tried to reduce the risk through negotiation between the client and the CM performer. The proposed method and process would contribute to the successful introduction of CM@R in Korea.