• 제목/요약/키워드: Approximate cost estimating

검색결과 30건 처리시간 0.023초

ACCURACY IMPROVEMENT OF AN APPROXIMATE COST ESTIMATING MODEL FOR RIVER FACILITY CONSTRUCTION

  • Siwook Lee;Sungkwon Woo;Jeongyoon Lee;Inwook Choi
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1201-1208
    • /
    • 2009
  • A making a decision of construction cost has important meaning and function for both contractor and owner in construction projects. Especially, it should be premised that estimating the construction cost in efficient and rational way in public construction, which is invested by government funds, for efficient execution of the budget and investment as a side of government. The systematic methodology for estimating construction cost approximately of a river facility construction project has not yet been established because of its unique characteristics including its relatively small project size in terms of cost. On this study, It collect and analyze a river facility construction historical cost data for develop an approximate cost estimating model for river applied by typical embankment section method and rate application of the others activity type. And it verify suitability of model through a that result of application of real river facility construction statement at developed model. By this study, it is expected to reasonable and systematic estimating construction cost through application of developed model.

  • PDF

표준단면을 이용한 터널 공사비 예측모델 개발 (II) - 공사비 변동 모델 및 검증 - (A Standard Section-Based Approximate Cost Estimating Model on Tunnel (II) - Cost Variance Index Table and Test -)

  • 조정연;김상귀;김경민;김경주
    • 대한토목학회논문집
    • /
    • 제28권5D호
    • /
    • pp.677-684
    • /
    • 2008
  • 본 연구는 터널공사비 영향요인 분석 결과를 이용하여 터널 공사비 예측에 활용될 수 있는 모델을 제시하였다. 이를 위해 공사비 영향요인의 변화에 따른 공사비 변동 지수표를 구축하고, 이를 바탕으로 사업 환경의 변화에 따른 공사비 추정을 위한 절차를 제시하였다. 또한 최근 수행된 실제 프로젝트를 대상으로 제시된 터널 공사비 추정모델의 적정성을 검증하는 작업을 수행하였다. 표준단면 및 공사비 변동비를 바탕으로 한 공사비 예측에 있어 실제 프로젝트를 통한 검증결과 실제 설계 예정가격과 비교하여 -5% ~ +11%의 범위에서 추정되었다. 제시된 모델은 기획단계에서 사업의 기본적인 조건을 바탕으로 사업비를 추정하고, 설계 및 시공단계에서 설계 대안에 대한 경제성 평가, 설계조건, 지반조건, 시공환경의 변화, 공법, 자재, 장비의 변경에 따른 공사비의 영향을 효율적으로 평가하는데 활용될 수 있을 것으로 기대된다.

PROCESS RESEARCH FOR DEVELOPMENT OF STRUCTURAL COST ESTIMATING MODEL BASED QUANTITY - FOCUSED ON PUBLIC OFFICE BUILDING PROJECT -

  • Soo-Min Kim;Jung-Kyu Seo;Sung-Uk Kim;Chang-Hyun Shin;Yung-Jin Kim;Jae-Youl Chun
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1170-1175
    • /
    • 2009
  • When managers estimate exact construction cost at early stage and design phase, they can reduce construction cost in a more efficient way than to predict at construction stage. But, the current of public construction cost estimation and management is concentrated almost after detailed design phase. Therefore, construction cost management in design development phase to generally use approximate estimating is not correct. Also, the existing construction cost used the method that estimated by gross floor area-based cost estimates at design development phase. So, it is difficult to show the specific amount of materials and basis about the estimated cost of the construction. This study derived problems and limits of construction management at design development phase in case of public office building project through review of literature and current survey, and suggested estimating process model process of structural construction cost go improve these matters.

  • PDF

하천시설물 공사의 기획단계 개략공사비 산정체계 개발 (Development of an Approximate Cost Estimating Framework for River Facility Construction at Planning Stage)

  • 신정민;우성권;이시욱;김옥기
    • 대한토목학회논문집
    • /
    • 제28권3D호
    • /
    • pp.371-381
    • /
    • 2008
  • 국내 하천시설물 건설공사는 도로 등의 다른 토목시설공사에 비해서 사업의 금액규모가 상대적으로 작다는 등의 특성으로 인해 사업의 기획 및 계획단계에서의 개략적인 공사비용을 예측하는 기준 단가가 정립되어 있지 않으며, 시설물의 특성을 고려한 합리적이고 체계적인 견적 방법론 또한 존재하지 않는다는 문제점을 가지고 있다. 본 연구는 하천시설물 건설공사의 실적자료를 수집하고 분석하여, 4단계로 이루어진 하천 제방공사 실적정보 구성 체계를 제시하고, 공사비에 영향을 끼치는 인자들을 주요 공종별로 도출하여, 하천시설물 공사의 기획단계에서 적정한 개략공사비를 산정하는 체계적인 방법론을 제시한다.

AN APPROXIMATE COST ESTIMATING MODEL FOR CONSTRUCTION PROJECTS

  • Daehee Lim;Seung-hoon Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1242-1247
    • /
    • 2009
  • The sudden changes in the construction market and the progressively intensifying price wars have amplified the importance of the construction cost estimation in the initial and planning phases of construction projects. However the methodologies and process of estimating construction cost in the planning and design phase are not standardized in the domestic market, in contrast to the markets of more developed countries. Therefore this paper proposes a new approximate estimation model to be used from the initial stages of construction projects. This methodology that extracts, modifies and synthesizes comparable elements of previous cases. This will introduce the foundation for the implementation of systems with improved usability and applicability.

  • PDF

Integrating Deep Learning with Web-Based Price Analysis to Support Cost Estimation

  • Musa, Musa Ayuba;Akanbi, Temitope
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.253-260
    • /
    • 2022
  • Existing web-based cost databases have proved invaluable for construction cost estimating. These databases have been utilized to compute approximate cost estimates using assembly rates, unit rates, and etc. These web-based databases can be used independently with traditional cost estimation methods (manual methods) or used to support BIM-based cost estimating platforms. However, these databases are rigid, costly, and require a lot of manual inputs to reflect recent trends in prices or prices relative to a construction project's location. To address this gap, this study integrated deep learning techniques with web-based price analysis to develop a database that incorporates a project's location cost estimating standards and current cost trends in generating a cost estimate. The proposed method was tested in a case study project in Lagos, Nigeria. A cost estimate was successfully generated. Comparison of the experimental results with results using current industry standards showed that the proposed method achieved a 98.16% accuracy. The results showed that the proposed method was successful in generating approximate cost estimates irrespective of project's location.

  • PDF

표준단면을 이용한 터널 공사비 예측모델 개발 (I) - 공사비 영향요인 분석 - (Tunnel Cost Estimating Model Based on Standard Section and Cost Variance Index (I) - Analysis Of Critical Cost Factors -)

  • 조정연;김경주;김경민;김상귀
    • 대한토목학회논문집
    • /
    • 제28권5D호
    • /
    • pp.665-675
    • /
    • 2008
  • 본 연구는 터널공사를 대상으로 사업 초기단계에서 터널공사의 설계 대안에 대한 공사비를 신속히 추정하고, 사업이 진행되면서 상황변화에 따른 사업비 측면에서의 영향을 파악할 수 있도록 함으로써, 적정한 의사결정을 지원하기 위한 개략적 터널공사비 추정모델 제시를 목적으로 한다. 이를 위해 터널공사의 수행에 있어 공사비에 영향을 미치는 요인을 분석하고, 공사비 영향요인별 공사비 변화의 정도를 분석하였다. 공사비 영향요인은 천공방식, 굴착방법, 기폭장치, 적재장비 용량, 버력의 단위중량 및 토량환산계수, 터널 연장을 포함하는 7개의 요인을 대상으로 하여 각 영향요인의 변화에 따른 공사비 변동 크기를 분석하였다. 분석결과는 기획단계에서 사업의 기본적인 조건을 바탕으로 사업비를 추정하고, 설계 및 시공단계에서 설계 대안에 대한 공사비의 영향을 효율적으로 평가하는데 필요한 공사비 추정모델의 구축을 위한 기초정보를 제공할 것으로 기대된다.

건축 구조체 공사비 산정모델 개발을 위한 데이터 분석 - 공공청사를 중심으로 - (Analyzing Data for Development of Structures Cost Estimating Model - Focused on Government Building Project -)

  • 김수민;조재호;이종식;전재열
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.212-215
    • /
    • 2008
  • 건축공사의 공사비 절감은 시공단계보다 사업초기단계 및 설계단계에서 정확한 공사비 예측을 함으로써 더욱 효율적으로 절감될 수 있다. 하지만 현행 공공 건설공사의 공사비 산정 및 관리는 실시설계 이후로 집중되어 있어, 계산견적을 중심으로 실시되는 기획 및 기본설계단계에서의 사업비관리는 매우 취약하다고 볼 수 있다. 이에 본 연구에서는 현행 공사비 산정 방법의 문제점 및 실적공사비 사례정보 분석하여 기본설계단계에서 구체적 비용 계획을 세우고 이에 부합되는 설계가 진행되는지 검토 가능한 공사비 산정모델 개발을 위한 예비적 연구를 수행하였다.

  • PDF

PSC BEAM 교량 공사비 영향요인을 이용한 개략공사비 산정모델 개발 (Approximate Estimating Model for PSC BEAM Bridge Using Influence Factors)

  • 강찬성;임원석;김경민;김경주
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.585-588
    • /
    • 2007
  • 대규모 재원이 투입되는 건설공사의 공사비를 합리적인 방법으로 적정하게 예측하는 것은 사업비 관리 측면에서 필수적이나 국내의 경우, 선진국과 비교하여 상대적으로 공사비 예측 기술이 미흡한 수준으로 사업비 관리를 체계적으로 수행하기에는 미비한 실정이다. 본 연구에서는, 개략공사비 산정모델 개발의 기본방향을 설정하고, 기획 ${\cdot}$ 설계 단계에 대한 개략공사비 산정 모델의 신뢰도 향상을 위한 검증과 데이터 추가분석을 수행하고자 한다. 공사비 예측기술 개발과 사업비 관리 인프라 기반조성을 통하여 건설공사의 품질을 확보하면서 예산 낭비 방지와 국가재원의 효율적 집행이 가능하며, 사업비 관리기술의 경쟁력을 강화하여 건설 산업의 수익성을 재고할 수 있을 것이다.

  • PDF

사례기반추론을 이용한 개략공사비 산정모델 개발 - PSC BEAM교를 중심으로 - (Approximate Estimating Model Using the Case Based Reasoning - PSC BEAM Bridge -)

  • 강찬성;이건희;김경민;김경주
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.445-448
    • /
    • 2008
  • 국내 도로건설사업에 있어서 개략공사비 산정 기준은 건설교통부 및 기획예산처, 한국도로공사 등에서 제시하는 평균 건설단가를 기준으로 활용하고 있다. 이때 도로의 등급, 구조물 추간의 구성 비율 등에 따라 공사비를 도정하고 있으나 다양한 공사 특성을 반영하고, 지속적인 공사비 갱신의 기준 등에 한계를 가지고 있다. 대규모 재원이 투입되는 건설공사의 공사비를 합리적인 방법으로 적정하게 예측하는 것은 사업비 관리 측면에서 필수적인 요소는 기술이라 할 수 있다. 본 연구에서는 기획단계에서 가용한 정보를 활용하여 공사비를 예측할 수 있는 사에 기반추론 PSC BEAM교의 개략공사비 산정모델을 개발하였다. 제시된 공사비 예측모델을 검증하기 위하여 표본교량을 대상으로 공사비를 추정한 결과 $-11.92%{\sim}3.20%$의 추정편차를 나타내었으며, 기존 개략공사비 산정 기준에 비해 신뢰도가 향상되었다.

  • PDF