• Title/Summary/Keyword: Approval Process

Search Result 252, Processing Time 0.024 seconds

Recognition or Enforcement of Arbitral Awards under the German Civil Procedure Act (독일민사소송법상 외국중재판정의 승인 및 집행 - 「독일민사소송법」 제1061조를 중심으로 -)

  • Sung, Joon-Ho
    • Journal of Arbitration Studies
    • /
    • v.29 no.2
    • /
    • pp.107-132
    • /
    • 2019
  • The arbitration procedure, which is a private trial, does not have a separate enforcement agency. Therefore, unless a party consents to the arbitration award and voluntarily fulfills the award, its execution is accomplished through the implementation of the national court. In particular, the decision in the foreign arbitration procedure will be refused or rejected for the arbitration award in case the proceedings of the law and procedure on which the judgment is based are caused by inconsistency with the domestic law or procedural defect. However, all foreign arbitration awards generally do not have to go through the approval process, and it will come into force with the arbitration award. In the case of Germany in the revision of the German Civil Procedure Act of 1996, the main provisions of the New York Convention concerning the ratification and enforcement of arbitration proceedings are reflected. Germany provides for the arbitration procedures in the arbitration proceedings of Book 10 of the Civil Procedure Act. Particularly, with Article 1061 in Book 10 Section 8 below, the approval and enforcement of foreign arbitrators shall be governed. Article 1061 has been referred to as "The New York Convention on the Recognition and Enforcement of Foreign Jurisdictions," Article 5 (1). The main reasons for approval and enforcement rejection are: (1) Reason for the acceptance or refusal of enforcement by request of the parties: Reason for failure of subjective arbitration ability, invalidation of arbitration agreement, collapse of attack or defense method, dispute not included in arbitration agreement, (2) Reasons for the approval and enforcement of arbitration considered by the competent authority of the arbitrator: violation of objective arbitration ability, violation of public order, but not based on the default of German statute.

Development of test methodology and detail standard for ECDIS (선박항해용전자해도시스템 인증 기준 및 시험기술 개발)

  • 심우성;서상현
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2004.04a
    • /
    • pp.269-274
    • /
    • 2004
  • The marine electronic system for safe navigation such as ECDIS has been contributing to increase the safety of navigation, decreasing the mariner's load of navigation. The ECDIS should be developed and approved by international standard of IMO for performance standard and IEC for type-approval method and required results. However, these standards have some ambiguities for us not to directly adopt them for real approval system, so we should analyze them for more clear meaning and prepare our own detail standard for type-approval system. The first thing to do for the goal of this research was to analyze the standard in detail and make ambiguity be cleared in our own standards, considering each test item in view of test methodology. For the result of analysis we could develop more evident and detail type-approval standard for each test item with test technology needed. Especially, we developed the colour differentiation test process of ECDIS monitor, which include the colour differentiation formula derived from CIE colour scheme. Several test items require sensor informations of navigation equipment compatible with IEC 61162. We also developed the signal simulator for general messages of IEC 61162 that must be provided. Additionally, the type-approval processes and standards for Back-up arrangement and RCDS mode were developed.

  • PDF

A Study on the Case of Application of a Process at the Construction Stage of the Color Planning at the Construction Site of Muju Taekwondo Park (무주 태권도원 현장 색채계획 시공단계 프로세스 적용사례연구)

  • Yun, Gye-Yeong
    • Korean Institute of Interior Design Journal
    • /
    • v.22 no.5
    • /
    • pp.320-327
    • /
    • 2013
  • In order to maintain and protect professionalism in color planning, the present study examined the process at the time of realization of color through color inspection and supervision in the actual construction site and suggested plans for improvement. Reflecting the characteristics that the governing body of the construction site is not a private person but an organization, the present study aims to provide institutional measures so that the supervisor of color construction at the actual site of construction can propose concerns related to proper construction at the right time, and the matters cannot be decided from the perspective of a layman. The institutional measures are proposed through the case of application of a process at the construction stage of the color planning at the construction site of Muju Taekwondo Park. First, the process clarified where the responsibility lies by specifying special conditions concerning color inspection on the field guide and color contract. Second, the sample for building materials was selected after obtaining it from a company capable of supply and is appropriate for the planned unit cost so that it could play an important role in realizing colors at the stage of basic design. Third, the process of construction was ensured not by temporary selection of colors but by continuous approval of colors in consideration of the conditions of construction site through letter of approval of color at each stage and point of time. Fourth, coordination of various color elements of other fields including landscape, interior, and electricity ensured construction of the whole structure in one color concept. Fifth, color inspection through the mock up of the site will minimize erroneous construction and reconstruction and prevent decrease in productivity. Sixth, this study also suggested more comfortable and positive color environment through evaluation by experts and users. The researcher of this study expects that color experts actively participate in the stage of construction to contribute to improvement of the color environment.

Task Characteristics and Utilization of Electronic Approval System : Media Richness Theory Perspective (업무특성과 전자결재시스템 활용간의 관계에 대한 탐색적 연구:매체 풍부성 이론 관점)

  • 김영걸;오승엽
    • Korean Management Science Review
    • /
    • v.17 no.1
    • /
    • pp.31-40
    • /
    • 2000
  • With the rapidly changing external environment and the increasing internal process complexity more and more organizations are adopting the Electronic Approval System(EAS) for their competitiveness. This paper defines EAS as a core organizational communication medium investigates factors which influence EAS's use from a media rich-ness theory and shows sutiable EAS functions for equivocality resolution and uncertainty reduction. Results from the five EAS implementation sites show that most organizations use EAS only for tasks with low equivocality and low uncertainty. Additional functionalities such as video conferencing and database access were suggested for fu-ture EAS system to enhance their utilization for more cirtical and unstructed tasks.

  • PDF

Adaptive workflow system for Incremental Business Process Modeling (진화형 비즈니스 프로세스 모델을 지원하는 적응형 workflow 시스템 개발에 관한 연구)

  • 심재용;한동수
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 1998.10c
    • /
    • pp.276-278
    • /
    • 1998
  • 근래 1,2년을 사이로 국내에서도 workflow system에 대한 인식이 높아지고, 실제 업무에 도입하려는 시도가 이루어지고 있다. 그러나, 아직까지는 실험적인 단계이며, 실질적인 적용까지는 시간이 필요할 것이라고 생각된다. 대신에 국내에서는 전자결재 시스템이 많이 사용되고 있다. 한편, workflow system은 비즈니스 process의 정의가 build time에 이루어지고 run time에는 그 정의에 따라 수행되는 방법이 일반적인데, 이런 방식이 주는 단점은 초기 build time에 process에 대한 이해가 부족한 상태에서 process가 정확하게 정의되기 어렵다는 점과, process의 유연성이 부족하다는 점, know-how를 잃어버리기 쉽다는 점 등이다. 따라서, 본 논문에서는 incremental approval방식이 유리하다고 주장한다. 한국의 기업환경과 실정의 고려해 볼 때 더욱 그렇다고 주장한다. 또, 전자결재 시스템과 workflow system의 유사점과 차이점을 분석하고 현재의 전자결재 시스템을 이용하면, workflow system의 incremental approval을 위한 prototype이 개발될 수 있다고 주장한다.

  • PDF

A Study on Certification Procedures for Technical Standard Order Authorization of USA and Europe (미국과 유럽의 항공기 기술표준품 인증절차에 관한 고찰)

  • Lee, Kang-Yi;Park, Guen-Young;Chung, Ha-Girl;Ryoo, Chang-Kyung
    • Journal of Aerospace System Engineering
    • /
    • v.9 no.1
    • /
    • pp.19-27
    • /
    • 2015
  • The Technical Standard Order articles are the parts and appliances for which the civil aviation authority designates as it is necessary to standardize for the expedited certification process and aviation safety. TSO articles were used on the type certified aircraft as replacement parts in the early days of TSO authorization system, but those articles are widely used on the newly developed aircraft as well in these days. In this paper, we compared the differences of the TSO authorization systems between FAA and EASA, and proposed the rulemaking items to improve Korean TSO authorization system and to contribute to growth of aviation industry.

Study on ISA's assessment to software process for EN50128 SIL4 (EN50128 SIL4 소프트웨어 프로세스 ISA 인증 사례 연구)

  • Cho, Chi-Hwan;Kang, Chan-Yong;Hwang, Jin-Ho
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.838-849
    • /
    • 2010
  • It is inevitable to control the systematic failure to obtain the software safety integrity of embedded software installed in rolling stock. Because it is not possible to assess systematic failure integrity by quantitative methods, SILs are used to group documentation, methods, tools and techniques throughout software development lifecycle which, when used effectively, are considered to provide an appropriate level of confidence in the realization of a system to a stated integrity level. Normally, safety approval process is through generic product, generic application and specification application for. For safety approval on generic application of software based system, it is required to apply the certified software processes from the planning stage for the assigned SIL. As such, we will develop project specific application with high safety integrity within time limit of contractual delivery schedule through software assessment to the modified area with the re-use of certified software module and documentation. At this point, Hyundai Rotem has developed software processes applicable to support SIL 4 based on EN50128 which was assessed and certified by TUV SUD. This paper introduces the Hyundai Rotem's detailed approach and prospective action to achieve software safety integrity level.

  • PDF

Methodology for Generating Information Requirements for BIM-based Building Permit Process (BIM 기반 인허가 요구정보 생성 방안)

  • Kim, Karam;Yu, Jungho;Kim, Inhan
    • Korean Journal of Computational Design and Engineering
    • /
    • v.20 no.1
    • /
    • pp.1-10
    • /
    • 2015
  • Using BIM (Building Information Modeling)-based design information to analyze various engineering processes has been widely adopted in construction projects. However, since typical building permit processes often require traditional 2D-based design information for submission and to obtain building approval, there are some challenges in delivering such data thru BIM-based design information. This paper proposed a methodology to generate and meet information requirements for permit applications and approvals based on BIM-based design information. To that end, we analyzed the required information necessary to make submissions for building approvals using the Seumter system. We then suggested a process to collect the required information from BIM-based data, and classified this into two types: BIM-internal and BIM-external information requirements. In addition, we proposed three algorithms to extract and to match between extracted BIM data and BIM-internal information requirements using IFC(Industry Foundation Classes). The proposed methodology enables to ensure the efficiency and the accuracy when providing data for building permit review and approval.

A Study on Influential Change of Locational Variables According to the Process of Residential Improvement Projects (정비사업추진단계별 입지변수들의 영향력 변화에 관한 연구)

  • Lim, Jae Moon;Oh, Se Kyung;Kwon, Tae Jung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.5
    • /
    • pp.2135-2146
    • /
    • 2013
  • Most researches about residential improvement projects deal with different process phase in order to examine important affecting variables. The main purpose of this study is to identify influential change of locational variables according to the process of residential improvement projects. Generally the residential improvement project consists of four phases such as site designation, project committee approval, residents association establishment and final project approval. The discriminant and correlation analyses are employed to examine the changes of locational variables by each phase of the project process. In residential redevelopment projects, the finding shows that locational variables in the final project approval phase act differently from those in the other phases. On the other hand, the variables act similarly among the four phases in the case of residental rebuilding projects although the significant level of discriminant analysis result, in the site destination phase, is relatively low significance. Therefore, there is no difference among the project process phase to examine to what extent of the residential improvement projects.