• Title/Summary/Keyword: Applicability estimation

Search Result 597, Processing Time 0.026 seconds

Estimation of Design Service Traffic Volume for 2+1 Roads Based on Korean Two-Lane Highway Conditions (국내 2+1차로 도로의 적정 교통량 및 계획기준 개발)

  • Lee, Dong Min;Chae, Chan Dle;Cho, Hanseon;Lee, Suk Ki
    • Journal of Korean Society of Transportation
    • /
    • v.31 no.2
    • /
    • pp.3-10
    • /
    • 2013
  • Two-lane roads that occupy more than a half of rural highways in Korea have operational problems such as traffic congestion problems due to relatively high traffic volume and safety problems due to overtaking risks in two-lane highways. To solve these problems, a 2+1 road pattern that enables to improve traffic safety and operational efficiency of two-lane highways has been applied in Europe. In this study, in-depth applicability of 2+1 roads to Korean rural highways was investigated based on review results of the successful experience of European 2+1 roads. Then, given the Korean two-lane highway conditions, the service traffic volumes for Korean 2+1 roads was estimated. The analysis results showed that 17,000 veh./day might be the maximum traffic volumes for Korean 2+1 roads.

An Assessment of Areal Evaportranspiration Using Landsat TM Data (Landsat TM 자료를 이용한 광역 증발산량 추정)

  • Chae, Hyo-Seok;Song, Yeong-Su;Park, Jae-Yeong
    • Journal of Korea Water Resources Association
    • /
    • v.33 no.4
    • /
    • pp.471-482
    • /
    • 2000
  • Surface energy balance components were evaluated by Landsat TM data and GIS with meteorological data. Calibration and validation for the applicability of this methodology were made through the estimating of the large-scale evapotranspiration (ET). In addition, sensitivity and error analysis was conducted to see the effects of the surface energy balance components on ET and the accuracy of each components. Bochong-chon located on the upper part of Guem River basin was selected as the case study area. Spatial distribution map of ET were produced for five dates: Jan. 1, Apr. 3, May. 10, and Nov. 27, 1995. The study results showed tat ET was greatly varied with the aspect and theland use type on the surface. In the case of having northeast and southeast in the aspect, ET was linearly increased depending on growing net radiation. While surface temperature has a high value, NDVI(Normalized Difference Vegetation Index) has a low value in the vegetated area. Therefore, ground heat flux was increased but ET was relatively decreased. The results of sensitivity and error analysis showed that net radiation is most sensitive and effective, ranging from 12.5% to 23.6% of sensitivity. Furthermore, the surface temperature, air temperature, and wind speed have the significant effects on ET estimation using remotely sensed data.

  • PDF

Assessment of Probability Flood according to the Flow Regulation by Multi-purpose Dams in Han-River Basin (한강유역의 다목적댐 운영에 따른 빈도홍수량의 평가)

  • Kim, Nam-Won;Lee, Jeong-Eun
    • Journal of Korea Water Resources Association
    • /
    • v.42 no.2
    • /
    • pp.161-168
    • /
    • 2009
  • The purpose of this study is to evaluate the variation of probability flood according to the flow regulation by multi-purpose dams (Soyang and Chungju) in the Han-river basin, Korea. SWAT-K (Soil and Water Assessment Tool-Korea) was used in order to generate regulated and unregulated daily streamflows upstream of Paldang dam. Simulated flow regulated by the Soyang and Chungju dams was calibrated by comparison with the observed inflow data at Paldang reservoir. Generally the ratio of flood flows to daily streamflows is known to decrease with drainage area in a watershed. Regulated and unregulated flood flows were obtained from the relationship between flood flows and daily streamflows. Extreme Type-I distribution was applied for flood frequency analysis and L-moment method was used for parameter estimation. This is a novel approach capable of understanding the variation in flood frequency with dam operation for the relatively large watershed scale, and this will helps improve the applicability of daily stream flow data for use in flood control as well as in water utilization.

Development of Wave by Wave Analysis Program using MATLAB (MATLAB을 이용한 개별파 분석 프로그램 개발)

  • Choi, Hyukjin;Jeong, Shin Taek;Cho, Hong Yeon;Ko, Dong Hui;Kang, Keum Seok
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.29 no.5
    • /
    • pp.239-246
    • /
    • 2017
  • In case of observing only wave height and period in the field, various wave characteristics are mainly calculated by wave by wave analysis method. In this paper, an wave by wave analysis program using MATLAB language is developed. It is possible to perform a function such as 1) correction for mean water level, 2) calculation for zero crossing time, 3) calculation for individual wave height, 4) time interval by using zero upcrossing and downcrossing method. The applicability of the developed program to the data of 0.2 second interval observed by using the WaveGuide Radar installed on HeMOSU-1 was examined. Tidal level variation removal and zero crossing time estimation were determined by linear or quadratic interpolation. It was judged that the Goda method was appropriate for calculating individual wave height, and the method proposed in this study seems to be improved through subsequent research. Due to the fineness of the sample, it can be seen that characteristics of representative waves are different from the results calculated by zero upcrossing and downcrossing method.

Analysis of Errors in Tunnel Quantity Estimation with 3D-BIM Compared with Routine Method Based 2D (2D기반 기존방법 대비 BIM기반 터널 물량산출 오차 분석)

  • Shin, Jae-Choul;Baek, Yeong-In;Park, Won-Tae
    • Journal of the Korean Geotechnical Society
    • /
    • v.27 no.8
    • /
    • pp.63-71
    • /
    • 2011
  • In case of applying BIM method to the civil engineering of irregularly shaped structure, BIM method is recognized to have relatively high construction productivity. In this paper, we developed quantity calculation algorithms applying BIM method to NATM tunnel construction method and implemented BIM based 3D-BIM Modeling Quantity Calculation. The results showed that BIM-based method has high reliabilty in structure work in which errors occurred only in the range between 0.00% and -1.45%. On the other hand, BIM method applied to earth work showed great error range of -19.78% to 35.30%. So the benefit and applicability of BIM method in civil engineering were confirmed. In addition, routine method for the quantity of earth work has negligible error as in the case of structure work. But, rock type's quantity calculation showed significant errors so that the reliability of 2D-based volume calculation is problematic. It may thus be concluded that 3D-BIM is more reliable than the routine method in estimating the quantity of earth work. Considering the reliability and merits in the stage of its design, construction and maintenance levels, the application of BIM to civil engineering works is recommended.

Tunneling-induced Building Damage Risk Assessment System (터널굴착에 따른 인접건물 손상위험도 평가시스템)

  • Park, Yong-Won;Yoon, Hyo-Seok
    • Journal of the Korean Geotechnical Society
    • /
    • v.18 no.3
    • /
    • pp.51-59
    • /
    • 2002
  • This paper deals with development of a damage risk assessment system for adjacent buildings to under-passing tunnel face considering 3D-ground movement. The system consists of building and ground information module, monitoring data module, settlement evaluation module, and building damage risk assessment module. The major modules, settlement evaluation module and building damage assessment module, are based on settlement estimation model suggested by Attewell et al (1982) and the building damage assessment method by Mair et al. (1996). After estimating 3D-ground movements due to tunneling with settlement evaluation module, damage assessment far buildings is performed using building damage risk assessment module. The developed system has two major functions; 1) calculation of 3D-settlement with ground loss ($V_{s}$)or maximum settlement ($w_{max}$) and inflection point (i) using various empirical formulae, monitoring data, numerical results, and so on; 2) assessment of damage risk for adjacent buildings of arbitrary section with position change of tunnel face. The field data given by Boscadin and Cording (1989) leer the case of two-storied masonry building near the Metro tunnel in Washington D.C. was simulated to verify the applicability of the developed system.

Estimation of Soil Moisture and Irrigation Requirement of Upland using Soil Moisture Model applied WRF Meteorological Data (WRF 기상자료의 토양수분 모형 적용을 통한 밭 토양수분 및 필요수량 산정)

  • Hong, Min-Ki;Lee, Sang-Hyun;Choi, Jin-Yong;Lee, Sung-Hack;Lee, Seung-Jae
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.57 no.6
    • /
    • pp.173-183
    • /
    • 2015
  • The aim of this study was to develop a soil moisture simulation model equipped with meteorological data enhanced by WRF (Weather Research and Forecast) model, and this soil moisture model was applied for quantifying soil moisture content and irrigation requirement. The WRF model can provide grid based meteorological data at various resolutions. For applicability assessment, comparative analyses were conducted using WRF data and weather data obtained from weather station located close to test bed. Water balance of each upland grid was assessed for soils represented with four layers. The soil moisture contents simulated using the soil moisture model were compared with observed data to evaluate the capacity of the model qualitatively and quantitatively with performance statistics such as correlation coefficient (R), coefficient of determination (R2) and root mean squared error (RMSE). As a result, R is 0.76, $R^2$ is 0.58 and RMSE 5.45 mm in soil layer 1 and R 0.61, $R^2$ 0.37 and RMSE 6.73 mm in soil layer 2 and R 0.52, $R^2$ 0.27 and RMSE 8.64 mm in soil layer 3 and R 0.68, $R^2$ 0.45 and RMSE 5.29 mm in soil layer 4. The estimated soil moisture contents and irrigation requirements of each soil layer showed spatiotemporally varied distributions depending on weather and soil texture data incorporated. The estimated soil moisture contents using weather station data showed uniform distribution about all grids. However the estimated soil moisture contents from WRF data showed spatially varied distribution. Also, the estimated irrigation requirements applied WRF data showed spatial variabilities reflecting regional differences of weather conditions.

Classification of Crop Cultivation Areas Using Active Learning and Temporal Contextual Information (능동 학습과 시간 문맥 정보를 이용한 작물 재배지역 분류)

  • KIM, Ye-Seul;YOO, Hee-Young;PARK, No-Wook;LEE, Kyung-Do
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.18 no.3
    • /
    • pp.76-88
    • /
    • 2015
  • This paper presents a classification method based on the combination of active learning with temporal contextual information extracted from past land-cover maps for the classification of crop cultivation areas. Iterative classification based on active learning is designed to extract reliable training data and cultivation rules from past land-cover maps are quantified as temporal contextual information to be used for not only assignment of training data but also relaxation of spectral ambiguity. To evaluate the applicability of the classification method proposed in this paper, a case study with MODIS time-series vegetation index data sets and past cropland data layers(CDLs) is carried out for the classification of corn and soybean in Illinois state, USA. Iterative classification based on active learning could reduce misclassification both between corn and soybean and between other crops and non crops. The combination of temporal contextual information also reduced the over-estimation results in major crops and led to the best classification accuracy. Thus, these case study results confirm that the proposed classification method can be effectively applied for crop cultivation areas where it is not easy to collect the sufficient number of reliable training data.

A Study on the Estimation of Stability of Fill Dam by Long-term Electrical Resistivity Monitoring (장주기 전기비저항 모니터링 기법을 이용한 필댐의 안정성 평가)

  • Kim, Gi-Ho;Lim, Heui-Dae;Ahn, Hee-Yoon
    • Journal of the Korean Geotechnical Society
    • /
    • v.29 no.5
    • /
    • pp.53-64
    • /
    • 2013
  • Resistivity monitoring is based on the fact that a change in the porosity leads to the changes in water content and fine particles, which alter the electrical resistivity. At every embankment dam, internal erosion always occurs as time passes. The internal erosion generally develops into piping over a long time by backward erosion and concentrated leak, and finally leads to dam failure. Resistivity is known to be very sensitive to the changes in porosity in embankment dams. Thus resistivity monitoring is a reasonable method to find out the leakage zone. However, resistivity is strongly influenced by seasonal variation of temperature, TDS of reservoir water and water level. In this paper. we first installed electrodes permanently at the center of the crest. The electrical resistivity monitoring data was acquired every 6 hours from Apr. 3, 2011 to July. 31, 2012. To analyze the characteristics of monitoring data, each resistivity data was calculated from up to 2,950 data sets. The result indicated a seasonal resistivity variation due to related temperature. Finally, a quantitative method to estimate porosities of the embankment dam from the resistivity monitoring data was analyzed. The applicability and reliability were verified and the importance of electrical resistivity monitoring for obtaining reliable result was emphasized.

A Study on Development of BIM-based Asset Management Model for Maintenance of the Bridge (교량의 유지관리를 위한 BIM기반 자산관리 모델 개발에 관한 연구)

  • Kang, Jong-Min;Lee, Dong-Youl;Park, Jong-Bum;Lee, Min-Jae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.5
    • /
    • pp.3-11
    • /
    • 2012
  • The most of domestic bridge has an used life under 30 years, Future maintenance budgets can be expected to increase. However, because of bridge maintenance budgets are limited, demand for asset management being performed to achieve required performance within available budget is increasing. To perform effective asset management of bridges should be made the best use of information to occur in all phase of construction project. Therefore, the development of system and DB is required to support asset management by effective information management. The objective of this study is the development of the BIM-based bridge asset management model. Through previous research survey, BIM capabilities and asset management components were established and mutual linkages were examined. Bridge asset management model was composed of alternate assessment model. In addition, BIM-based asset management model was performed case studies to verify feasibility and applicability. The proposed model can be applied to a current bridge maintenance procedures and supported to perform effective bridge maintenance tasks within a limited budget.