Preference Analysis on the Reconstruction and Remodeling of Old Aged Apartment in Daejeon Area (대전지역 노후화된 아파트의 재건축과 리모델링에 대한 선호도 분석)

  • Park, Sun-Gyu
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.4 no.2
    • /
    • pp.180-186
    • /
    • 2016
  • There are many apartment buildings with the government's policy of increasing the supply of residential houses in Korea. Roughly 60% of the Korea population are living in apartment buildings. Since the 1970s, the Korean economy has grown enormously, the economic and social structure was radically transformed to industrialization and urbanization step. A village has grown into a large town in Korea and apartment buildings was constructed to solve national housing shortage by the Korean government and the construction company. Since the 2000s, this apartment buildings which was built in the 1970s and 1980s had become gradually deteriorated. So, reconstruction and remodeling project of apartment buildings have been come into request in Korea. There are two way to improve the residential environment. The one is remodeling of apartment buildings and the other is reconstruction of that. Therefore, we carried out questionnaire and survey study of the preference on the reconstruction and remodeling of old aged apartment which were located in daejeon province. As a result, the preference rate of remodeling is increasing instead of reconstruction because reconstruction of apartment buildings takes more money and needs long construction period.

Development of a system for Project Quality Plan in Connection with Schedule D/B (공정D/B 연계를 통한 품질계획서 운영시스템 개발)

  • Moon Jin-Young;Kim Kyung-Rai;Kim Yea-sang;Chin Sang-Yoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.444-449
    • /
    • 2001
  • Because of preferential treatment in PQ judgement, many construction company got the certification of ISO 9000. But the main objective of them was just certification itself. The ISO 9000 certification which was composed of 20 requirements was a standard just for the manufacturing industry, so it was difficult that it was applied to a business of construction industry. In these reasons, they have revised ISO 9000:l994 which was composed or 20 requirements to ISO 9000:2000 which requests to focus on business process. In this research, we'll develop a System for Project Quality Plan that is related with information of site process in an apartment housing project. This system is intended to increase use of project quality plan in construction sites based on the construction process.

  • PDF

A Study on the Change Factors by Activities for Estimating Historical Cost on Apartment Housing Projects (공동주택 실적공사비 산정시 공종별 변동요인에 관한 연구)

  • You, Yong-Hwan;Lee, Kyoo-Hyun;Kim, Chong-Woen;Choi, In-Seung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.4 no.4
    • /
    • pp.117-126
    • /
    • 2004
  • Construction industry is faced with the problems such as the quickly changeable circumstance and increasing construction companies due to regulation mollification of company registration. In order to overcome these problems, new estimation system based on historical estimation cost is ready to introduce by government step by step. But the time of transition for estimation system causes another problems such as chaos addition to simultaneity of a standard of estimation system and new estimation system, lack of related regulation, accumulation of historical extensive cost data, and adjustment methodology when historical estimation data is applied to next projects. The purpose of this study is to suggest the change factors by activities for estimating historical cost for apartment housing projects. New estimation system is based on historical construction data. For application of this system, the standard adjustment methodology system is necessary. and extensive cost data should be accumulated under an unified construction work classification system. Therefore in this study, according to the construction work classification system, every apartment housing project was classified to 16 work classifications, and 7 major composed items which occupy more than 85% of construction costs are analyzed by detailed activities and by average ratio and maximum ratio each of them. In the result of the study, furniture work, foundation work and masonry work are the works which have big gap of costs between average ration and maximum ratio. In addition to suggestion of change factor by work species, 5 qualified construction specialists are interviewed and change factors in 7 major works are analyzed.

A Study on the Construction Speed and Structural Safety of a High-Rise Apartments in North Korea (북한 초고층 아파트의 공사속도와 구조 안전에 관한 연구)

  • Kim, Janghan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.5
    • /
    • pp.15-22
    • /
    • 2022
  • The 70-story high-rise apartment on Ryomyong Street, Pyongyang was completed in just 75 days, which has raised questions about its structural safety. This study was conducted to find an answer to this question and to contribute to inter-Korean construction cooperation in the future. As a result of analyzing data from Google Earth and North Korean publicity, it could be estimated that there were no problems with the application of shallow foundations, construction speed including concrete strength and curing period, and structural safety until at least May 2022 under several conditions. This means the possibility that the North Korean style high-rise apartment construction method could be understood by South Korean standards, which could help successfully carry out the joint construction project by applying the North Korean style construction and minimizing the transfer of South Korean resources in the future.

Analysis of Importance by Defect Type in Apartment Construction (공동주택 건축공사 하자유형별 중요도 분석)

  • Kim, Do-Hyung;Lee, Dongyoun;Lee, Hak-Ju;Min, Yoon-Gi;Park, Insung;Cho, Hunhee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.4
    • /
    • pp.357-365
    • /
    • 2020
  • While numbers of apartment housing are continually rising in the domestic housing construction industry, apartment contractors are currently developing plane models, upgrading facilities, and relevant technology, and investing much efforts to meet the higher demands of consumers. However, the construction process of apartment housing involves the intricate properties of the construction industry such as materials, workforce, equipment, weather, and unpredictable situations. If any of these factors becomes discordant and results in interference and interruption of the construction process, then defects, both functional and aesthetic, are likely to occur due to errors in the plan of industry organizers and constructors. Therefore, this research identifies the types of defects in an apartment construction project and analyzes their relative importance. Firstly, this research reviews the previous research trends and will reduce the needs of this research. Afterward, defect repair costs corresponding to the different defect types are calculated by applying results of the research and performing frequency analysis on defect types included in 'Tenant preliminary research' on apartments constructed by Company A. As a result of analyzing the importance of defect type, the top six activities, including tile, floor, paper hanging, PL window, cabinetry, and kitchen cabinet, are found to be of high importance, and the top six activities in question need of repair and management of defects first. The results of this study will help establish a plan to initially respond to such problems as refusal to move in and filing a defect suit against delay in repairing defects.

Suggestion of Optimum PHC Pile for 15~40 Story Shear Wall Type Apartment Building (벽식공동주택의 층수변화에 따른 최적 PHC말뚝 제안)

  • Lee, Bum-Sik;Park, Jong-Bae;Park, Yong-Boo;Kim, Sang-Yeon;Ha, Young-Bae;Choi, Geong-Ryun
    • Land and Housing Review
    • /
    • v.3 no.2
    • /
    • pp.177-185
    • /
    • 2012
  • LH applies a uniformly standardized PHC Pile to 15~25 stories of Shear-wall type Apartment Building. Recently it is predicted that LH will construct over 30~40 story Apartment Building to keep varied project condition and faces urgent needs to save construction cost for improving its competitiveness. Therefore, structural analysis and design on the upper part and foundation of apartment building were carried out in this study by subdividing story of apartment building, e.g. 15, 20, 25, 30, 35, 40 stories. Reflecting the result of basement analysis and design, the economic evaluations are performed and the optimum diameters of PHC piles are suggested. The result of this paper is considered to be applied usefully for foundation design of LH apartment housing, and the suggested PHC Piles can be used effectively by increasing efficiency and saving the construction cost of foundation.

Network Compression by Saying Idle Time of Resources and Spaces for Repetitive Activities (작업공간과 자원의 여유시간 최소화를 통한 반복작업 공정계획기법)

  • Yi Kyoo Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.3 s.3
    • /
    • pp.75-80
    • /
    • 2000
  • In scheduling multi-unit projects, several alternatives can exist in network construction due to repetitiveness of their activities. Project duration is affected not only by the duration of each activity but also by the arrangement of repeating activities in such projects. This paper provides a network compression method that assigns predecessors to each activity to minimize its float time. Different to the previous efforts that utilized line of balance as the base scheduling-model, this research adopts precedence diagram arranged in two coordinates, the space axis and the resource one. This method seeks the most appropriate predecessors for each activity in each direction of the two coordinates for the purpose of minimizing the idle resource and space. This activity arrangement method was applied to a multi-unit apartment-construction project, to prove its capability of network compression. The result shows that the method successfully sought room for saving construction duration by changing the activity arrangement. The network compression method presented in this research can be utilized in multi-unit construction projects such as apartment complex projects.

  • PDF

An Analysis of Critical Management Factors for Construction Failure on the Apartment Structural Framework using FMEA (FMEA 기법을 활용한 공동주택 골조공사의 건설실패 핵심관리요인 분석)

  • Oh, Chi-Don;Park, Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.78-88
    • /
    • 2012
  • Previous construction failure researches were focused on the utilization plan based on failure information and development of failure classification. However, it has limitation to set up the plan for prevention of construction failure due to the lack of the number of on-site staffs. In order to prevent effectively construction failure, a prevention plan should be established through quantitative evaluation of failure causes. The purpose of this study is to suggest the assessment method for selection Critical Management Factor(CMF) and to analyze the CMF on the apartment structural framework using FMEA(Failure Mode and Effective Analysis) which is one of the methods of quantitative evaluation. The element of risk evaluation separated degree of failure risk and prevention respectively. The assessment method for selection of CMF can be utilized for planning proactive solutions on the failure, and it can be also selected critical factors about each project phases, type of facility and construction work.

A Study on the Sensitivity Analysis of the Financial Analysis Item in Apartment Project (공동주택 사업의 수지분석 항목에 대한 민감도 분석에 관한 연구)

  • Kim, Gwang-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.1 s.29
    • /
    • pp.100-109
    • /
    • 2006
  • Feasibility analysis is a crucial key to success or failure of housing project. Existing feasibility analysis in construction company is based on intuitive approach rather than systematic approach. Usually feasibility analysis in a narrow sense is a financial analysis of project. Feasibility analysis focused in this study is confined to the matter of finance. So, the purpose of this study is to analyze the sensitivity of financial analysis item about profit rate by means of monte carlo simulation and this will improve accuracy of feasibility analysis and decision making.

Constitution of Work Process for Apartment Renovation Project in Design Phase (공동주택 리모델링 설계단계에서의 사업수행 프로세스 구축)

  • Kwon, Won;Chun, Jae-Youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.167-175
    • /
    • 2007
  • A renovation project of apartment housing is generally divided into four stages: Project inquiry stage, planning and feasibility stage, design stage and construction stage. Currently, procedure and managerial technique for a remodeling project has not been systematically established so that many companies have difficulty in doing their business. In particular, the design stage in participant which a project managers, designers, residents and engineers is more complicate than the other stages in terms of roles and working procedure. The design documents can be found trial and error if it is not well managed. The insufficient design caused by lack of ability to efficiently utilize information obtained during the stage and inappropriate decision-making not only results in diverse problems in the construction stage but also makes people suspect satisfaction and reliability on the remodeling improvements. Therefore the design stage is very significant issue on the renovation project. As the consequence, the design stage of a remodeling project is so important that it should be carefully managed, and composite understanding of the process to be executed. To do this, we provide roles and responsibility of each participant in the design stage and analyze the process where information is utilized in design stage. The information is analyzed in terms of input, tool and output.