• Title/Summary/Keyword: Annual maintenance cost

Search Result 71, Processing Time 0.034 seconds

Analysis of Economic Replacement Cycle of Power Transformer Based on LCC Considering Maintenance Effect

  • Park, Seung-Hwa;Jang, Kyeong-Wook;Kweon, Dong-Jin;Shon, Jin-Geun
    • Journal of Electrical Engineering and Technology
    • /
    • v.13 no.4
    • /
    • pp.1631-1637
    • /
    • 2018
  • Electric utilities has been considered the necessity to introduce asset management of electric power facilities in order to reduce maintenance cost of existing facilities and to maximize profit. This paper aims to provide data that can helpful to make profitable decision in terms of power transformers which have a significant part in the power system. Therefore, this study is modeling input cost for power transformer during its entire life and also the life cycle cost (LCC) technique is applied. In particular, the variation of transformer state related with maintenance and the variation of the EUAC curve based on cost and effect of maintenance is examined. In this study, the trend of the equivalent uniform annual cost (EUAC) according to maintenance cycle and cost of equipment is analyzed. In line with that, sensitivity analysis influenced by the changes of other cost factors was performed.

Investigating the Maintenance Cost of Rest Areas: A Case Study of Nevada

  • Shrestha, Kishor;Shrestha, Pramen P.
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.624-631
    • /
    • 2022
  • Highway Rest Areas are envisioned to provide an accessible space for rest and parking for travelers, especially those driving a long distance. In addition, modern highway Rest Areas provide many amenities to highway users, including wifi service, picnic tables, litter barrels, running water, public telephones, and sometimes even free coffee. Various studies were conducted in the domain of Rest Area facility design and their operating costs in different states; however, limited studies were conducted on the maintenance costs of these facilities. Therefore, this study's main objective is to compute the annual maintenance cost of Rest Areas in the state of Nevada. This study also analyzes the main cost categories of the maintenance works. The raw cost data of Nevada Rest Area maintenance from 1990 to 2012 were collected from the Nevada Department of Transportation (NDOT). Results show that the maintenance cost fluctuated over the study period; the maintenance cost decreased from 1991 to 2004 and then increased until 2012. The primary cost categories of maintenance work are labor, equipment, and material costs. Among these, labor cost was the largest category with 56 percent of the total maintenance cost, followed by equipment cost and material cost. The findings of this study may help NDOT and other transportation agencies plan their budget for future Rest Area maintenance activities.

  • PDF

A Study for Determining Economic Life of KlAl Tank by Using the PRICE Model (PRICE모델을 이용한 KlAl전차의 경제수명 결정에 관한 연구)

  • 문태동;강성진
    • Journal of the military operations research society of Korea
    • /
    • v.28 no.1
    • /
    • pp.97-114
    • /
    • 2002
  • An estimation of economic life for a new weapon system is a critical issue in aquisition process. In general a life cycle cost consists of, development cost, aquisition cost, and maintenance cost. These costs are not identified and obtained in the beginning of the aquisition process. This paper deals with an economic life for KlAl tank which is being deployed recently, using PRICE model. In order to estimate an KlAl economic life, we use equivalent annual cost method which is sum of capital recovering with return and equivalent O&M cost method. This method determines an economic life by minimizing annual investment cost and operation and maintenance cost. In this paper, an aquisition cost of KlAl is obtained from PRICE H and O&M cost from PRICE HL model. We obtained various results depending upon production quantity. An economic life for KlAl is estimated 18 years when 300 tanks are produced.

Application of Generally Annual Maintenance Concept for LCC Analysis with a Highway (고속도로 LCC분석시 연간일상유지관리 개념의 적용)

  • Heo, In;Lee, Yong-Gu;Yang, Jae-Gyeong;Choe, Yeong-Min;Kim, Seung-Hyeon
    • Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.43-54
    • /
    • 2011
  • LCC(Life Cycle Cost) analysis on design process has to be performed for a selection of reasonable and economical design alternatives in highway construction projects. To be performed of LCC analysis, the maintenance data such that are maintenance periods, rate of repair, maintenance cost, and so on are required. Therefore the Hi-Portal System had been developed and the maintenance data has been accumulating in the Korean Expressway Corporation. However, the data are not effectively used because the system have no consideration for LCC concept, and currently, th data are acquired by survey with experts. In the study, it is proposed that the concept of Generally Annual Maintenance are practically and easily used to perform LCC analysis. Some of generally annual maintenance data are suggested through Hi-portal data analysis due to the proposed concept and LCC analysis of a real highway construction project is preformed by comparison with a current approach. From the results, it make sure that the proposed concept are effectively used to preform LCC analysis until during exactly practical data from Hi-Portal system are obtained.

A Study on the Determination for the Economic Life-Time of a Self-Propelled Artillery (자주포 경제수명 결정에 관한 연구)

  • 최은성;최석철
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.3 no.1
    • /
    • pp.26-37
    • /
    • 2000
  • This research paper deals with the problem of determining the optimal life time in terms of economical sense for a self-propelled artillery. Equivalent Annual Cost Method(EACM) is used to evaluate the optimal life time, based on the acquisition cost, and the operation and maintenance cost. It is assumed that the operation and maintenance cost includes the costs for spare parts, petroleum and ammunition for training. From the result of this study, the optimal life time for a self-propelled artillery is between 13.9 years and 16.1 years with 95% confidence interval.

  • PDF

Analysis of Life Cycle Cost for Heat Source Equipments in Buildings for Adolescent Trainees (청소년 수련관의 열원설비 대안별 생애주기 비용에 관한 연구)

  • Ahn, Chang-hwan;Pang, Seung-ki;Baik, Yong-gyu
    • KIEAE Journal
    • /
    • v.5 no.3
    • /
    • pp.25-31
    • /
    • 2005
  • Computer simulations were performed for Heating Ventilating and Air-Conditioning (HVAC) systems to figure out more efficient maintenance methods for the building used for adolescent trainees. This study aims at suggesting design alternatives for optimum operation and performing life cycle cost (LCC) for each alternative. First, the capacity of the heat source equipment was determined using annual maximum heating and cooling loads. Annual loads were calculated and applied to the alternative for the purpose of calculating annual energy cost. Second, several types of data were collected to predict energy cost. Finally, the pay back period for each alternative was calculated using total cost estimation during standard duration period. This study indicates that the absorption chiller that does not occupy most part of a mechanical room, and does not need much operation cost was most economical.

Life Cycle Cost Optimization Considering Maintenance History of Bridge Beck and Girders (바닥판과 주형의 유지보수 이력을 고려한 LCC 최적설계)

  • Ahn Ye-Jun;Lee Hyun-Sub;Shin Yung-Seok;Park Jang-Ho
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2005.04a
    • /
    • pp.719-726
    • /
    • 2005
  • The optimal design was performed for the bridge superstructure composed of steel box girders and concrete deck considering life cycle cost. The service life of the superstructure was estimated, after load carry capacity curves for steel girder and concrete deck were derived on the basis of condition grade curves and maintenance histories. The object function was determined as life cycle cost, including initial cost, total maintenance cost, disposal cost and user cost, for a period of the estimated service life. The optimal design of the superstructure was performed for the various service lifes. The annual costs were used to compare calculated results and to get the most economical design. Also this paper presents reasonable idea for the use of user cost with uncertainty.

  • PDF

Comparing the Operation Cost of Washington Safety Rest Areas with Other States Using Performance-Based Method

  • Shrestha, Kishor;Berg, Alix;Tafazzoli, Mohammadsoroush;Kisi, Krishna
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.640-648
    • /
    • 2022
  • In the United States, the Safety Rest Areas (SRAs) were introduced as highway roadside infrastructures in the early 1900s. The State Departments of Transportation (DOTs) operate/maintain their SRAs using different methods. The Washington DOT used the in-house workforce method for over 20 years, whereas some states moved to Performance-Based Contracting (PBC) from the in-house workforce to save cost primarily. Several existing studies claimed that using the PBC approach saved costs on several highway assets. Thus, the principal objective of this study is to compute and compare the unit operating/maintenance cost of SRAs using the in-house workforce method (in Washington state) with the PBC approach (in other states). The findings of this study show that the average annual cost using the PBC approach was much more than the average annual cost using the in-house workforce approach. The findings also show that in Washington state, the 'Labor Cost' category was a key expenditure, which is statistically higher than other categories. The 'Labor Cost' was followed by the 'Other Services', and then 'Materials and Supplies' and 'Equipment.' The study's findings indicated that outsourcing does not always save costs for agencies. The study findings may help transportation construction/maintenance professionals select a cost-effective approach for their future planning.

  • PDF

The Comparison of Maintenance Cost and Residents′Consciousness of Remodeling by Rental Apartment Types (임대아파트 유형별 유지관리비와 거주자의 리모델링 의식비교)

  • 박민용;장승재
    • Journal of the Korean housing association
    • /
    • v.14 no.4
    • /
    • pp.69-76
    • /
    • 2003
  • Considering the present development situation of rental apartment since 1982, the supply of rental housing for low-income dwellers has contributed a amount of quantities, but has been deficient qualities in housing policy. To propose the device of remodeling for low-income dwellers in deteriorated apartment, this study investigated the characteristics of maintenance cost and the residents'consciousness of remodeling by rental apartment types. The results of this study were as follows; The annual maintenance cost of permanent rental apartment was 14,249 won/$\textrm{m}^2$$.$yr, that of fifty years period rental apartment was 13,372 won/$\textrm{m}^2$$.$yr. In the case of remodeling in deteriorated heating system, the principal decision factor of choice was showed “economics” as priority. Residents in rental apartment preferred remodeling to reconstruction, and unit heating system to central heating system.

The Estimation Analysis Method of the Annual Operation Cost of Korean High-rise Condominiums

  • Ko, Eun Hyung;Choi, Jun Young
    • Architectural research
    • /
    • v.7 no.1
    • /
    • pp.11-18
    • /
    • 2005
  • In today's building industry the emphasis has been geared more towards construction, thus building maintenance and life cycle have been neglected until now. A direct result of this neglect is the rapid aging of building, which leads to more cost-effective decision making methods for the prolongation of building life span. The following study is conducted in the area of Daegu and Seoul in order to develop the estimation analysis method of the annual operation cost of the Korean high-rise condominiums for the cost-effective decision making support through mathematical and statistical analyses including the present value and standardized measurement corrections. Based on the assumption that the life expectancy of the high rise condominium is 50 years, initial cost is ₩421,212/$m^2$, and a total sum of yearly operation cost during life expectancy is ₩2,154,499//$m^2$), yearly accumulated operation cost is shown as below: $AOC=0.7097t^4-38.803t^3+806.95t^2+11045t-496.52$ ($R^2=0.98$) (Here, AOC = Accumulated Operation Cost, t = given years)