• Title/Summary/Keyword: Annual cost

Search Result 700, Processing Time 0.033 seconds

Analysis of Cost Benefit Related to Appointing a Health Care Manager in the Construction Industry (건설업 보건관리자 선임 관련 비용편익분석)

  • Jung, Hye-Sun;Yi, Jee-Seon;Shin, In-Jae;Choi, Eun-Hi
    • Korean Journal of Occupational Health Nursing
    • /
    • v.25 no.2
    • /
    • pp.130-140
    • /
    • 2016
  • Purpose: The construction worker has diverse harmful factors such as noise, dust, and dealing with chemicals. Therefore this research aimed to examine the necessity of appointing a health manager in the construction industry by examining the cost-benefit analysis when the construction industry appoints a health manager. Methods: In order to calculate the healthcare staff employment cost and the benefits from their activities in 1,425 construction companies with the staff of 300 or more people during 2011, this study analyzed existing data and existing research data, as well as national data. Results: Total annual costs were 99,920,070,900 won and total annual benefits were 324,807,182,625 won. Benefits were found to be 224,887,111,725 won exceeding costs. Benefit/cost ratio resulting from appointing a health manager in the construction industry workplaces was 3.25 times. Conclusion: The findings of this research can be used as the base data to make rational decision to positively encourage the employment of healthcare staff in construction companies pursuant to relevant laws.

Survey on the Utilization of Power Tiller (동력경운기 이용실태에 관한 조사연구 (김천 금릉지구))

  • 김창수
    • Journal of Biosystems Engineering
    • /
    • v.4 no.1
    • /
    • pp.67-74
    • /
    • 1979
  • This survey was carried out to grasp the actual condition of a power tiller utilization . Now, the power tiller has become the leading machinery in the field of agriculture throughout the country . Two hundred farm houses, located in the provincial districts of Kimcheon and kum0rung, hav etaken part in the survey from October 1, 1976 to September 30, 1977. The results are summarized as follows . 1. The average size of cultivated land of a farm household in the districts surveyed was 1.77ha which was bigger than that of whole country. And the average age of power tiller drivers was analyzed in which only 105 of total drivers was on their 30's. 2. Distribution of a power tiller utilization was appeared to be 34.4% for transporting , 24% for tilling , 23% for pumping , 11.5% for threshing and 6.6% for spraying. 3. Frequency of a power tiller utilization was high during the month of June, July and October while it was low during February and December . 4. Distribution of repairing cost was 8.5% for trailer, 7.1% for throttle lever and 6.7% for casket, respectively. The annual cost for repairing was 5,290 won.5. The annual cost for using a power tiller was composed of 51.5% of fixed cost and 48.5% of operating cost. 6. Economic analysis showed that it was not economically practical for individual ownership of a power tiller on the farm surveyed. Therefore, custom operation and joint ownership by a few farmers were recommended.

  • PDF

Economic analysis of jeju offshore pilot run wind farm by sensitivity analysis (민감도 분석을 적용한 제주 연안 풍력단지 설계의 경제성 분석)

  • Lee, K.H.;Park, J.H.;Jin, J.W.;Kwon, K.R.;Choi, K.H.
    • Journal of Power System Engineering
    • /
    • v.16 no.5
    • /
    • pp.13-19
    • /
    • 2012
  • In this paper, the offshore wind farms have been designed by using WindPRO with the help of real wind data measurements at Jeju Costal area by calculating the annual energy production for exact economic evaluation. In order to achieve benefit of wind farm, the annual revenue for power generation have been calculated with SMP and REC value. And construction cost has derived from the real wind farm project case. Also O&M cost has been estimated by OMCE (Operating & Maintenance Cost Estimator) to get accurate cost of wind farm. Economic evaluation of wind farms have been performed by comparing above parameters. In addition, sensitivity analysis calculating the effect of these factors has also been carried out.

A Study of Variations in Cost-of-Living Index (도시가계 생계비 산정기준의 다양화를 위한 연구)

    • Journal of Families and Better Life
    • /
    • v.15 no.4
    • /
    • pp.137-148
    • /
    • 1997
  • The purpose of this study is to set the various cost-of-living standards utilizing a published national data. 1995 annual data, The Family Income and Expenditure Survey, were used to set the standards of living. Four index reflecting health and decency level, normal level, minimum of health and decency level, and pauper level were suggested and the cost-of-living of each level were estimated. Results showed that cost-of-living estimated in this study were not quite different from those of former studies, but the name of the standard-of-living need to be changed.

  • PDF

최적 열전달계수를 이용한 단열기준산출

  • Lee, Jin-Won;Lee, Jong-Won
    • The Magazine of the Society of Air-Conditioning and Refrigerating Engineers of Korea
    • /
    • v.8 no.2
    • /
    • pp.95-100
    • /
    • 1979
  • Optlmum overall heat transmission coefficient for residential buildings is calculated as a function of building parameter, area/volume. Equivalent heat transmission coefficient and equivalence factor are introduced and optimized with respect to annual cost including fuel cost , insulation cost and equipment cost Comparison with recent standard of West Germany shows similarity of the result.

  • PDF

Optimal Design of PSC-I Girder Bridge Considering Life Cycle Cost (생애주기비용을 고려한 PSC-I형 교량의 최적설계)

  • Park, Jang-Ho;Shin, Yung-Seok
    • Journal of the Korean Society of Safety
    • /
    • v.24 no.5
    • /
    • pp.48-56
    • /
    • 2009
  • This paper presents the procedure for the optimal design of a PSC-I girder bridge considering life cycle cost (LCC). The load carrying capacity curves for the concrete deck, PSC-I girder and $\pi$-type pier were derived and used for the estimate of service lives. Total life cycle cost for the service life was calculated as sum of initial cost, damage cost, maintenance cost, repair and rehabilitation cost, user cost, and disposal cost. The advanced First Order Second Moment method was used to estimate the damage cost. The optimization method was applied to the design of PSC-I girder bridge. The objective function was set to the annual cost, which is defined by dividing the total life cycle cost by the service life, and constraints were formulated on the basis of Korean Standards. The optimal design was performed for various service lives and the effects of design factors were investigated.

Costs During the First Five Years Following Cancer Diagnosis in Korea

  • Shin, Ji-Yeon;Kim, So Young;Lee, Kun-Sei;Lee, Sang-Il;Ko, Young;Choi, Young-Soon;Seo, Hong Gwan;Lee, Joo-Hyuk;Park, Jong-Hyock
    • Asian Pacific Journal of Cancer Prevention
    • /
    • v.13 no.8
    • /
    • pp.3767-3772
    • /
    • 2012
  • Objective: We estimated the total medical costs incurred during the 5 years following a cancer diagnosis and annual medical use status for the six most prevalent cancers in Korea. Methods: From January 1 to December 31, 2006, new patients registered with the six most prevalent cancers (stomach, liver, lung, breast, colon, and thyroid) were randomly selected from the Korea Central Cancer Registry, with 30% of patients being drawn from each cancer group. For the selected patients, cost data were generated using National Health Insurance claims data from the time of cancer diagnosis in 2006 to December 31, 2010. The total number of patients selected was 28,509. Five-year total medical costs by tumor site and Surveillance, Epidemiology, and End Results (SEER) stage at the time of diagnosis, and annual total medical costs from diagnosis, were estimated. All costs were calculated as per-patient net costs. Results: Mean 5-year net costs per patient varied widely, from $5,647 for thyroid cancer to $20,217 for lung cancer. Advanced stage at diagnosis was associated with a 1.8-2.5-fold higher total cost, and the total medical cost was highest during the first year following diagnosis and decreased by the third or fourth year. Conclusions: The costs of cancer care were substantial and varied by tumor site, annual phase, and stage at diagnosis. This indicates the need for increased prevention, earlier diagnosis, and new therapies that may assist in reducing medical costs.

A Study on Unit Treatment Cost of Sewage Disposal Plant in the Service Area under Highway (생물학적 처리시설의 처리비 원단위 산정에 관한 연구 -고속도로 휴게소를 중심으로-)

  • 장철현;박상우;홍태석
    • Journal of Environmental Science International
    • /
    • v.11 no.6
    • /
    • pp.537-541
    • /
    • 2002
  • This study aimed to obtain the relative formula with the unit treatment cost according to the treatment of a sewage plant in the service area under highway. The following results were obtained. The correlative formula connected to amount of sewage(Q)generation was as follows ; between an annual amount of sale(C) showed Q=19.113$.$C$\^$0.9294/, and between the number of users(P) showed Q=2${\times}$10$\^$-8/ $.$P$^2$- 0.0298$.$P + 75,666. The correlative formula connected to the treatment cost was as follows , according to the amount of sewage generation showed S= 3${\times}$10$\^$-6/$.$Q 0-0.2266$.$Q+29,895, according to the elimination of BOD(E) showed S=6${\times}$10$\^$-5/$.$E$^2$-0.6717$.$E + 27,744, according to the annual amount of sale showed S=0.0005 C$^2$-4.8013$.$C + 35,118, with the number, of persons(P) using the service area showed S= 2${\times}$10$\^$-8/ $.$P$^2$- 0.046$.$P + 48,803.

An Economic Analysis of Ice Thermal Storage and Absorption Chiller-Heater Systems (빙축열 시스템과 흡수식 냉온수기 공조 방식의 경제성 분석)

  • Lim, Hyun-Woo;Kim, Young-Il;Kim, Kang-San;Kang, Yong-Tae
    • Proceedings of the SAREK Conference
    • /
    • 2009.06a
    • /
    • pp.218-223
    • /
    • 2009
  • Cost related to building equipment accounts for about 85% of the life cycle cost of buildings. Therefore proper selection of air-conditioning system is important for reducing the overall cost of buildings. In this study, large capacity ice thermal storage and absorption chiller-heater for air-conditioning a building with a floor area of $9,900\;m^2$ are compared economically. For easy input and analysis, an Ms Excel VBA program has been developed. To consider all the factors of initial and operation costs effectively, an annual equal payment method is proposed. Under the assumptions made in this study, overall cost of an absorption chiller-heater is less than that of an ice thermal storage, but this is not absolute and different outcome may result if different assumptions are made. This study is useful for those who are interested in choosing an economical air-conditioning system for large-size buildings with simple calculations.

  • PDF

Area Annual Outage Cost Assessment of KEPCO System by TRELSS (TRELSS를 이용한 KEPCO 계통의 공급지장비 추정연구)

  • Shi, Bo;Jeong, S.H.;Park, J.J.;Choi, J.S.;Jeon, D.H.;Yun, Y.B.;Jang, B.H.;Moon, S.P.;Han, K.N.
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.578-579
    • /
    • 2007
  • The importance and necessity of conducting studies on area outage cost assessment have been increasingly important in recent years due to the competitive electricity market environment. The objective of operational issues would be to minimize the total area cost while satisfying all associated system constrains of each area[2]. This paper presents a methodology of the Area annual outage cost assessment by probabilistic reliability evaluation using TRELSS program for KEPCO system. The interrupted energy assessment rate (IEAR) is evaluated by macro approach that is using relations between GRDP and the electrical energy demand. The Expected Energy Not Supplied (EENS) of each area was evaluated using the Transmission Reliability Evaluation for Large-Scale Systems (TRELSS) Version 6_2, a program developed by EPRI are introduced in this paper.

  • PDF