Journal of the Korean Institute of Landscape Architecture
/
v.35
no.5
/
pp.16-28
/
2007
In this study, the implications for landscape architecture in the restoration Project of Cheonggyecheon will be shown through the analysis of factors for landscape architect scheme modification. The method of study consists of theoretical study, analysis of the plan and design of landscape architecture of the restoration project of Cheonggyecheon, and deduction of implications thereof. The controversial feints included the many difficulties in realizing the productive design of landscape architecture due to the selective collecting of public opinion and the problems of settling the complications, the design limit of the turnkey and MA systems, the lack of hydraulic knowledge and technology and the shortage of vegetation monitoring data and experimental materials. The alternative proposals are as follows: 1) there should be agreement between the government organization and the civil group, 2) in the turnkey bidding for the river restoration projects, the river restoration design based on the volume divided into some parts should be reconsidered in order to maintain consistency in the total design, 3) in order to maintain consistency in the planning policies, MA designs should also be introduced and applied from the first stage of the project through its completion, and 4) data such as the safe water level in case of flooding for the facilities and the vegetation and data in connection with the ecological restoration of river should be accumulated. If these controversies are not settled effectively, the river restoration project will be delayed due to complications with the citizens and wasted time and effort will result from the frequent design changes. In addition, landscape architecture in this kind of restoration project is bound to decrease in the future due to frequent changes in the hydraulic-centered design.
Journal of the Korean Institute of Landscape Architecture
/
v.34
no.1
s.114
/
pp.107-119
/
2006
The Korea Water Resources Corporation(KOWACO) proposed bidding for an alternative design for Hwabuk Multi-purpose Dam in March of 2004. The site is located in Hakseong-ri, Goro-myeon, Gunwi-gun, Gyeongsangbuk-do and has adrainage area of $87.52km^2$. The purpose of this project is to establish an environmentally friendly plan for minimizing the damage that was caused by the construction of the Hwabuk Multi-purpose Dam. The design principle of KOWACO was the restoration of the natural environment, a harmonious landscape, and the creation of a space of regional and local culture. The basic concept of this project involves an ecological-restoration axis and a functional-connection axis. The site is divided into four spaces: (1) the space of memory and symbol, (2) the space of nature and ecology, (3) the space of regional and local culture, and (4) the space of the regional economy. There are four sub-spaces in the space of memory and symbol: the track forest, the time forest, the memory room, and the sun plaza. There are three sub-spaces in the space of nature and ecology: the habitat of aquatic birds, the wind forest, and the eco-corridor. There are five themed parks in the space of regional and local culture: the culture and relic room, the wildflower garden, the ecological pond, the insect observation park, and the pyogo maze. There are three areas in the space of the regional economy: the forest pension, the waterside pension, and the community center, as Dungdungi village was reorganized to serve as a lodging complex. These themed parks, working together, can offer an effective space for nature, culture, rest, and experience.
Korean Journal of Construction Engineering and Management
/
v.9
no.3
/
pp.118-125
/
2008
In Korea, five days per week system, duration reduction bidding system, and post sale system have recently stimulated an interest in productivity improvement in construction project. However, analysis result of productivity in Korean construction industry found that the productivity is too low. APC (Architectural PC) is alternative of reveal wall and parapet in apartment housing prcjects and is used abroad broadly because of duration reduction for productivity improving. APC is used as external curtain wall in Dubai, North America, and Southeast Asia. Therefore, it is proposed that necessary to Introduce APC in Korea. The objective of this study is to draw up introduction of APC in apartment housing projects. We analysed the feasibility of the use of APC. The survey results reported that APC would be able to improve the productivity in the eight productivity factors.
KSCE Journal of Civil and Environmental Engineering Research
/
v.38
no.5
/
pp.741-749
/
2018
The purpose of this study is to propose a rational and scientific damage calculation model in relation to damages caused by bid rigging in construction projects. Previous studies and precedents in relation to calculating damages from bid rigging suggest that the main issue was the lack of consideration in standards for deciding successful bids, selection of inadequate standard comparative markets, insufficiency in analyzing the appropriateness of competitive bid price influence factors, and absence of calculation model verification. In order to improve on these issues, a damage calculation method on alternative tenders for construction projects was proposed. For this calculation model, first, a standard market adequate to the successful bid selection standards was determined, second, an appropriate factor was selected by analyzing the correlation between competitive bid price influence factors, and third, a regression analysis was conducted on the selected factor. Lastly, this was demonstrated through verification of appropriateness, significance & normality of the proposed model and application of actual bid rigging cases. Through the proposed calculation model, this study seeks to serve as a base to prevent opportunity damages for parties involved in related court cases by early resolution of disputes and relief from issues of unfair damage burdens on a particular party.
Korean Journal of Construction Engineering and Management
/
v.8
no.4
/
pp.73-80
/
2007
As BTL(Build-Transfer-Lease) private investment business benchmarking PHI(Private Finance Initiative) of USA and Japan is introduces to Korea since 2005, as a part of supplying high leveled public service and early expanding required facilities for SOC, Value for Money on private investment business from treasury investment business at the beginning gets to be needed. Accordingly, this survey has been conducted in order to analyse BTL projects status, propriety of economic analysis method(VFM analysis, calculation of estimated business expenses, valuation of bidding price, etc.) by business advance phases from the viewpoint of person in charge, necessity of improvement and alternative plants. As the result of conducting cross tabulation analysis and correlation analysis by occupational group, BTL project advance phases and alternative plans for improvement, it is necessary ye prepare standardized service level against business expense and basis for calculating and evaluation operation expenses. Based on the necessity of quantitative analysis (LCC analysis) of VFM, standard for calculating management, maintenance and administration expenses is required. In addition, reliable economic valuation system considering domestic BTL environment should be setup, for business efficiency.
Asia-pacific Journal of Multimedia Services Convergent with Art, Humanities, and Sociology
/
v.6
no.7
/
pp.219-228
/
2016
This research aimed at investigating policy change process of after school contracting out and suggesting future alternative. Also, this research conducted a literature search for the research data related to policy and related regulations. As the result of investigation, the Ministry of Education established management plan for after school, however there have been changes in policy, e.g. contracting out was executed from 2004 to 2008 upon autonomy of unit school through school steering committee deliberation(consultation), while standardized procedure was conducted, which was suggested in 'After school operation guideline', produced in cooperation between the Ministry of Education and municipal ministry of education from 2008 to 2015, while since 2016, contract law should be applied when after school contracting out is adopted. Policy change since 2016 is based on the legal necessity that contract law should be followed as the contract size of after school contracting out has become larger along with necessity of clarity of after school contracting out. Nevertheless, there's a worry that quality of after school education could be degraded due to lowest price bidding. The government suggested an alternative to prevent excessive price competition by paying a regular rate of basic price as personnel expenses, however this research suggested a plan to enact an ordinance in regard of specialty of after school educational activities and cities and provinces as the fundamental solution plan.
Proceedings of the Korea Water Resources Association Conference
/
2011.05a
/
pp.20-20
/
2011
The purpose of this research aims to evaluate the emergence of new business mode in the Chinese water market since the mid-2000s - Transfer-Operate-Transfer(TOT) Projects. The study pays special attention to the case of the Hefei Wangxiaoying Wastewater Treatment TOT Project, which was awarded to the consortium of Berlin Water International and its Chinese partner in late 2004. The consortium secured an exclusive operating right for 23 years on the basis of a TOT scheme and would take responsibility of all the profits and losses in the operation of the plant. The total investment for the transfer amounted to RMB 491 million(US$70 million). The price was more than 288% of the original value, RMB 170 million (US$24 million). The project can be regarded as a successful case because of the following three causes. First, the Hefei government followed a series of standardized procedures in the international bidding, which ignited best-performed international players' competition for the project. Second, the project will bring in cutting-edge operation skills and management know-how. Third, the government succeeded in raising public asset values, and thanks to this, the government is able to consider other similar projects not only in the water sector but also other sectors in public utility services. Nevertheless, Berlin Water's point of view, there are several challenges. First, the company took a risk to pay such a large amount of cash to the Hefei government. Although such premium can be recouped in the operation period of 23 years, whether or not the company would be able to recover the initial investment and realize profits is in question due to an uncertainty of socio-political circumstances in China. Second, Berlin Water should expect a steep rise of water tariffs over the contract period in order to get the investment back. Water pricing is still a sensible matter to Chinese authorities, and therefore, it is uncertain if such rise of water tariffs would be possible. Third, the TOT mode leads to creation of a large amount of cash to government officials, which might have caused corruption between those who are involved in TOT deals. Then, the final contract fee would soar, which often results in the burden of normal customers. As discussed, the TOT mode has drawn much attention of foreign investors as a new alternative to enter into the Chinese water market. But it is important to note that foreign investors should be aware of possible risks in water TOT projects, which reflects some features of the Chinese political economy landscape and social norms. The Hefei case indicates that benefits can overshadow risks in TOT projects, which will continue to attract foreign investors that are dedicated to establishing their strongholds in the Chinese water market.
The Global Financial Crisis and introduction of International Financial Reporting Standards (IFRS) urged the banks to strengthen their asset qualities. The banks dispose their non performing loans(NPLs) consistently to maintain a sufficient BIS capital adequacy ratio. Accordingly, the interests in auctions, as a disposal method, of real estates that secured for NPLs are on the increasing. This study suggest an alternative for fairness consolidation of real estate auctions which secured for NPLs. First, the impartial entry barriers for NPL sales markets need to be eliminated for fair bidding competition in auctions for real estate that secured for NPLs. In addition, the portion of NPL disposal by real estate auctions need to be expanded. Second, the asymmetry of trade information in the retail markets of NPLs and the abuse of offset by NPL owners' also should be restricted. The Fairness improvement of NPL trading process and real estate auction process that secured for them would of great use in the protection of bidders. Futhermore, it would also contribute to the revitalization of real estate auction markets and the resolution of NPLs of banks through fair disposal of distressed assets.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.