• Title/Summary/Keyword: Allowable settlement

Search Result 132, Processing Time 0.023 seconds

Applicability of the Pile-Supported Embankment in Korea (성토지지말뚝공법의 국내 적용성 분석)

  • Lee, Il-Wha;Kim, Seung-Sun;Lee, Joo-Gong;Shim, Shung-Kyu;Lee, Su-Hyung
    • Journal of the Korean Geotechnical Society
    • /
    • v.32 no.3
    • /
    • pp.5-13
    • /
    • 2016
  • Stability analysis was conducted to analyze the application of pile-supported embankment to concrete slab track on the soft ground in Korea. Pile efficiency and tension of geosynthetics in accordance with the hight of embankment and the depth of soft soil were carried out by theoretical and numerical methods. Theoretical method predicted more conservatively than the numerical method for all the cases presented herein. The settlement stability is satisfied to allowable criteria of high speed railway in Korea. The pile-supported embankment has great potential for application to soft ground condition.

The Development of Tunnel Behavior Prediction System Using Artificial Neural Network (인공신경망을 이용한 터널 거동 예측 시스템 개발)

  • 이종구;문홍득;백영식
    • Journal of the Korean Geotechnical Society
    • /
    • v.19 no.2
    • /
    • pp.267-278
    • /
    • 2003
  • Artificial neural networks are efficient computing techniques that are widely used to solve complex problems in many fields. In this study, in order to predict tunnel-induced ground movements, Tunnel Behavior Prediction System (TBPS) was developed by using these artificial neural networks model, based on a Held instrumentation database (i.e. crown settlement, convergence, axial force of rock bolt, compressive and shear stress of shotcrete, stress of concrete lining etc.) obtained from 193 location data of 31 different tunnel sites where works are completed. The study and test of the network were performed by Back Propagation Algorithm which is known as a systematic technique for studying the multi-layer artificial neural network. The tunnel behaviors predicted by TBPS were compared with monitored data in the tunnel sites and numerical analysis results. This study showed that the values obtained from TBPS were within allowable limits. It is concluded that this system can effectively estimate the tunnel ground movements and can also be used f3r tunneling feasibility study, and basic and detailed design and construction of tunnel.

Stability Evaluation of Reinforced Subgrade with Short Geogrid for Railroad During Construction (짧은 보강재를 사용한 철도보강노반의 시공 중 안정성 평가)

  • Kim, Dae Sang
    • Journal of the Korean Geosynthetics Society
    • /
    • v.13 no.4
    • /
    • pp.11-20
    • /
    • 2014
  • The behaviors and stability of reinforced subgrade with short geogrid were examined and evaluated during construction. First of all, analytical approach for the minimum length of geogrid was performed to guarantee stability during construction loading state. Secondly, the economic aspects for reinforced subgrade were compared with between domestic standards applying with 0.7 H reinforcement length and new way to mix short and long reinforcement. Full scale railroad subgrade was constructed with the size of 5 m high, 6m wide, and 20m long to verify the stability of the subgrade with the length of 0.3 H, 0.35 H, 0.4 H reinforcement. Total 51 sensors were installed to measure settlement, bulging, and the change of stress of the subgrade. It is concluded that the reinforced subgrade with short(0.35H, 35% of height) geogrid had stability within allowable level of deformation and stress increment during construction.

Analysis of the Shaft Resistance of a Pile Embedded in Sand Responding to Ground Deformation by Model Tests of Simulated Ground Heaving (실내모형실험을 통한 지반 융기시 사질토 지반에 매설된 지반 변형 대응형 말뚝의 주면 마찰 저항 분석)

  • Shin, Sehee;Lee, Kicheol
    • Journal of the Korean Geotechnical Society
    • /
    • v.39 no.1
    • /
    • pp.5-14
    • /
    • 2023
  • The pile driving process may lead to ground heaving, causing additional positive skin friction to act on the piles, compromising their stability. This study proposes a new pile foundation type that can reduce positive skin friction. This was investigated by designing and constructing a pile with a hydraulic cylinder which actively responds to ground deformation. The newly proposed pile design was compared against traditional piles in multiple model tests where ground heaving was simulated. In the tests, base load and total shaft resistance were measured during ground heaving and with expansion of the hydraulic cylinder. As a result of the tests, a very small amount of expansion of the hydraulic cylinder member completely reduced the positive skin friction and increased the base load. Excessive expansion of the hydraulic cylinder, however, generates negative skin friction beyond the zero skin friction state. Therefore, it is necessary to estimate the appropriate level of hydraulic cylinder expansion, taking into account the amount of ground heaving and the allowable displacement of the pile.

A Study on the Improvement of Flexible Working Hours (탄력적 근로시간제 개선에 대한 연구)

  • Kwon, Yong-man
    • Journal of Venture Innovation
    • /
    • v.5 no.3
    • /
    • pp.57-70
    • /
    • 2022
  • In modern industrial capitalism, the relationship between the provision of work and the receipt of wages has become an important principle governing society. According to the labor contract, the wages provided by entrusting the right to dispose of one's labor to the employer are directly compensated, and human life should be guaranteed and reproduced with proper rest. The establishment of labor relations under free contracts represents a problem in protecting workers, and accordingly, the maximum of working hours is set as a minimum right for workers, and the standard for minimum rest is set and assigned. The reduction of working hours is very important in terms of the quality of life of workers, but it is also an important issue in efficient corporate activities. As of 2020, Korea has 1,908 hours of annual working hours, the third lowest among OECD 37 countries in the happiness index surveyed by the Sustainable Development Solution Network(SDSN), an agency under the United Nations. Accordingly, the necessity of reducing working hours has been recognized, and the maximum working hours per week has been limited to 52 hours since 2018. In this situation, various working hours are legally excluded as a way to maintain the company's value-added creation and meet the diverse needs of workers, and Korea's Labor Standards Act restricts flexible working hours within three months, flexible working hours exceeding three months, selective working hours, and extended working hours. However, in the discussion on the application of the revised flexible working hours system in 2021 and the expansion of the settlement unit period recently discussed, there is a problem with the flexible working hours system, which needs to be improved. Therefore, this paper aims to examine the problems of the flexible working hours system and improvement measures. The flexible working hours system is a system that does not violate working hours even if the legal working hours are exceeded on a specific day or week according to a predetermined standard, and does not have to pay additional wages for excessive overtime work. It is mainly useful as a form of shift work in manufacturing, sales service, continuous business or electricity, gas, water, and transportation for long-term operations. It is also used as a way to shorten working hours, such as expanding holidays through short working days. However, if the settlement unit period is expanded, it is disadvantageous to workers as the additional wages that workers can receive will not be received. Therefore, First, in order to expand the settlement unit period currently under discussion, additional wages should be paid for the period expanded from the current standard. Second, it is necessary to improve the application of the flexible working hours system to individual workers to have sufficient consultation with individual workers in a written agreement with the worker representative, Third, clarify the allowable time for extended work during the settlement unit period, and Fourth, limit the daily working hours or apply to continuous rest. In addition, since the written agreement of the worker representative is an important issue in the application of the flexible working hours system, it is necessary to secure the representation of the worker representative.

An analysis of problems and countermeasures in the installation of plastic greenhouse on reclaimed lands (간척지에 플라스틱 온실 설치 시의 문제점 분석 및 개선방안)

  • Yu, In-Ho;Ku, Yang-Gyu;Cho, Myeong-Whan;Ryu, Hee-Ryong;Moon, Doo-Gyung
    • Korean Journal of Agricultural Science
    • /
    • v.41 no.4
    • /
    • pp.473-480
    • /
    • 2014
  • Upon setting up a dedicated plastic greenhouse for tomato cultivation developed by the Rural Development Administration on the Gyehwa reclaimed land, this study was aimed at analyzing the problems can be occurred in the installation of plastic greenhouse on reclaimed lands as well as finding out solutions for improvement. A relatively cheaper wooden pile was used in the installation in order to supplement the soft ground conditions. Based on the results of ground investigation of the installation site, both the allowable bearing capacity and pulling resistance of the wooden pile with a diameter of 150 mm and a length of 10 m were computed and came out to be 30.645 kN. It was determined that the values were enough to withstand the maximum compressive force (17.206 kN) and the pullout force (20.435 kN) that are generally applied to the greenhouse footing. There are three problems aroused in the process of greenhouse installation, and the corresponding countermeasures are as follow. First, due to the slightly bent shape of the wooden pile, there were phenomenon such as deviation, torsion, and fracture when driving the pile. This could be prevented by the use of the backhoe (0.2) rotating tongs, which are holding the pile, to drive the pile while pushing to the direction of the driving and fixing it until 5 m below ground and applying a soft vibrating pressure until the first 2 m. Second, there exists a concrete independent footing between the column of the greenhouse and the wooden pile driven to the underground water level. Since it is difficult to accurately drive the pile on this independent footing, the problem of footing baseplate used to fix the column being off the independent footing was occurred. In order to handle with this matter, the diameter of the independent footing was changed from 200 mm to 300 mm. Last, after films were covered in the condition that the reinforcing frame and bracing are not installed, there was a phenomenon of columns being pushed away by the strong wind to the maximum of $11m{\cdot}s^{-1}$. It is encouraged to avoid constructions in winter, and the film covering jobs always to be done after the frame construction is completely over. The height of the independent footing was measured for 9 months after the completion of the greenhouse installation, and it was found to be within the margin of error meaning that there was no subsidence. The extent to the framework distortion and the value of inclinometers as well showed not much alteration. In other words, the wooden pile was designed to have a sufficient bearing capacity.

A Study on the Stability Analysis of Reinforced Embankment on the Soft Ground (연약지반상의 보강성토의 안정해석에 관한 연구)

  • 임종철;전미옥;박이근;정연인
    • Journal of the Korean Geotechnical Society
    • /
    • v.15 no.6
    • /
    • pp.285-296
    • /
    • 1999
  • Preloading method is used to prevent the settling of a foundation and to increase the strength of ground by consolidation settlement in advance. But, the embankment used in preloading method brings large deformation and sliding failure in the soft ground. Recently, reinforcement method is often used in embankment in order to prevent sliding failure. But, until now, the research on the stability analysis considering both the rate of strength increase of clay by embankment load and increase of resistance force by the geosynthetics in the embankment body is not found. In this study, the stability analysis program(REAP) for embankment including these two points is developed. By this program(REAP), the stability analysis can be done about during the gradual increase of embankment and the stability counterplan can be established when the safety factor is lower than allowable safety factor of design. After calculating the position of sliding failure surface, the force of geosynthetics which is selected by either the effective tensile strength or tensile force caused by the displacement of soil mass in this position is applied to stability analysis. And the increase of resisting moment can be calculated by this force. Also, the construction period can be estimated and the time for the appropriate counterplan can be decided in order to maintain the stability of embankment. And then, safe and economical embankment design can be performed.

  • PDF

Analysis of Optimized Column-pile Length Ratio for Supplementing Virtual Fixed Point Design of Bent Pile Structures (단일 현장타설말뚝의 가상고정점 설계를 보완한 상부기둥-하부말뚝 최적 길이비 분석)

  • Jeong, Sangseom;Kim, Jaeyoung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.5
    • /
    • pp.1915-1933
    • /
    • 2013
  • In this study, the virtual fixed point analysis and 3D fully modeling analysis for bent pile structures are conducted by considering various influencing factors and the applicability of the virtual fixed point theory is discussed. Also, the optimized column-pile length ratio is analyzed for supplementing virtual fixed point design and examining a more exact behavior of bent pile structures by taking into account the major influencing parameters such as pile length, column and pile diameter, reinforcement ratio and soil conditions. To obtain the detailed information, the settlement and lateral deflection of the virtual fixed point theory are smaller than those of 3D fully modeling analysis. On the other hand, the virtual fixed point analysis overestimates the axial force and bending moment compared with 3D fully modeling analysis. It is shown that the virtual fixed point analysis cannot adequately predict the real behavior of bent pile structures. Therefore, it is necessary that 3D fully modeling analysis is considered for the exact design of bent pile structures. In this study, the emphasis is on quantifying an improved design method (optimized column-pile length ratio) of bent pile structures developed by considering the relation between the column-pile length ratio and allowable lateral deflection criteria. It can be effectively used to perform a more economical and improved design of bent pile structures.

Track Stability Assessment for Deep Excavations in Adjacent to Urban Railways (도시철도 인접지반 깊은 굴착 시 궤도 안정성 평가)

  • Jeon, Sang-Soo;Lee, Sang-Seung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.6
    • /
    • pp.614-627
    • /
    • 2018
  • Urban railway lines have been constructed adjacent to residential buildings and urban areas. The expansion of transportation networks and reconstruction of residential buildings in highly populated urban areas require deep excavations in areas adjacent to urban railways. Mobilized soil stresses and changes in the groundwater level induced by deep excavations results in track irregularities in urban railways. In this study, a three-dimensional finite difference model using the commercial program FLAC3D was adopted to estimate the horizontal displacements of earth retaining structures, settlements of backfill, the stability of track irregularity and underground box structure based on the criteria of each railway organization and its relationships. In deep excavations, a change in groundwater level induces relatively very small differences for track gauge irregularities, whereas relatively large differences for longitudinal irregularities of 72.5%, twist irregularities of 83.3%, cross level irregularities of 61.9%, and alignments of 43.3% were found to be the maximum differences when the horizontal displacement of earth retaining wall and settlement of backfill were 65.1% and 21.4%, respectively, because the groundwater level (GWL) on the ground surface-mobilized tensile strength of the underground box structure exceeds the allowable value. Therefore, three-dimensional numerical analysis was performed in this study. Overall, real-time monitoring should be carried out to prevent railway accidents in advance when a deep excavation adjacent to urban railway structures is constructed.

Bearing Behavior Characteristics of Pressure Penetrating Steel Pipe Pile Under Compression Load (압축하중을 받는 압입강관말뚝의 지지거동 특성)

  • Kwon, Ohkyun
    • Journal of the Korean GEO-environmental Society
    • /
    • v.16 no.7
    • /
    • pp.5-13
    • /
    • 2015
  • The pressure penetrating steel pipe pile method which can be constructed in a narrow space using the hydraulic jack is used on the foundation reinforcement, extension of the structure and basement, restoration of the differential settlement etc.. This method is possible to construct in narrow areas and low story height, the non-noise and non-vibration works, and it is possible for the construction site to be clean without slime. And it is possible to confirm the bearing capacity of pile due to penetrating the pile with the compression load of hydraulic jack. In this study, the static load test with the load-transfer test was carried out to investigate the bearing behavior characteristics of the pressure penetrating steel pipe pile. Four series of static load test were executed to investigate the variation of bearing behavior of the pressure penetrating steel pipe pile. As a result of these tests, the allowable load of the pressure penetrating steel pipe was evaluated more than 637 kN, and the shaft resistance corresponding to 81~86% of each applied load was mobilized with only a small portion of the base resistance acting. And it was also evaluated that the unit skin friction was mobilized to maximum value after two months.