• Title/Summary/Keyword: Allowable Vibration

Search Result 197, Processing Time 0.032 seconds

Flow Analysis for Fission Moly Target Cooling in HANARO (하나로 Fission Moly 표적 냉각에 대한 유동해석)

  • Park, Yong-Chul
    • 유체기계공업학회:학술대회논문집
    • /
    • 2003.12a
    • /
    • pp.502-507
    • /
    • 2003
  • The HANARO, multi-purpose research reactor, 30 MWth open-tank-in-pool type, is under normal operation since it reached the initial critical in February 1995. The HANARO is used for fuel performance tests, radio isotope productions, reactor material performance tests, silicone semiconductor productions and etc. Specially, the HANARO is planning to produce a fission moly-99 of radio isotopes, a mother nuclide of Tc-99m, a medical isotope and is under developing a target handling tool for loading and unloading those at a flow tube (OR-5). The target should be sufficiently cooled in the flow tube without an interference with the cooling of the others and an induction of extremely vibration. This topic is described an analectic analysis for the cooling characteristics of the fission moly-99 target to find the minimum cooling water. It was confirmed through the analysis results that the minimum cooling water, about 2.717 kg/s flew through the flow tube under the worst case that the guide tube got no perforating holes for cooling water to pass through the holes and that the target was safely cooled under about seventy percent (70%) of the maximum allowable temperature of the target.

  • PDF

Vibration analysis of train-bridge system with a damaged pier by flotilla collision and running safety of high-speed train

  • Xia, Chaoyi;Wang, Kunpeng;Huang, Jiacheng;Xia, He;Qi, Lin;Wu, Xuan
    • Structural Engineering and Mechanics
    • /
    • v.81 no.1
    • /
    • pp.69-79
    • /
    • 2022
  • The dynamic responses of a pier-pile-soil system subjected to a barge/flotilla collision are analyzed. A coupled high-speed train and bridge system with a damaged pier after barge/flotilla collision is established by taking the additional unevenness of the track induced by the damaged pier as the self-excitation of the system. The whole process of a CRH2 high-speed train running on the 6×32 m simply-supported PC (prestressed concrete) box-girder bridge with a damaged pier is simulated as a case study. The results show that the lateral displacements and accelerations of the bridge with a damaged pier are much greater than the ones before the collision. The running safety indices of the train increase with the train speed as well as with the number of barges in the flotilla. In flotilla collision, the lateral wheel/rail forces of the train exceed the allowable values at a certain speed, which influences the running safety of the trains.

Development Process of Mechanical Structure for a Large Radar (대형 레이더 기계구조부 개발 절차)

  • Shin, Dongjun;Lee, Jonghak;Kang, Youngsik
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.20 no.1
    • /
    • pp.1-11
    • /
    • 2017
  • In this paper, design requirements of the large radar were investigated, and development was performed through the analysis and design. Large radar should be designed by bearing the 75 knot wind force and $20kg/m^2$ ice mass as operating conditions in order to meet structural stability, and driving torque and bearing load were calculated for securing the driving stability. Thermal dissipation analysis was performed considering TRM and DC-DC Converter's limitation temperature by $50^{\circ}C$ ambient temperature condition in order to attain thermal stability, and PSD and shock analysis were carried out by using MIL-STD-810G vibration and shock specification in order to transport and installation of the large radar. As a result, all components of large radar could secure the structural stability more than 2.8 factor of safety, and driving stability was also secured with adequate bearing fatigue life. Thermal stability was attained by allowable max temperature 88.7 C of the TRM, and structural stability for transportation and installation of the large radar was also secured more than 5 factor of safety. After it was transported and installed to the radar site, operating capability was finally verified by rotating the large radar.

Finite Element Model Updating and Validation of Satellites for Coupled Load Analysis (연성하중해석 수행을 위한 인공위성 유한요소모델 보정 및 검증)

  • Lim, Jae Hyuk;Kim, Kyung-Won;Kim, Sung-Hoon;Hwang, Do-Soon
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.41 no.8
    • /
    • pp.605-612
    • /
    • 2013
  • When developing medium satellites or large satellites, coupled load analysis(CLA) is performed in order to verify satellite design as a final assessment under launch environment. Maximum acceleration, gap between adjacent parts, internal loads obtained from CLA are used to assess the safety of satellite design by comparing them with the allowable loads of every component. To achieve reliable CLA results, satellite FE model have to be properly updated to match with the sine vibration test results. In this paper, the validation procedure of satellite FE model and its results are discussed.

Development of an Automatic Soil Hardness Measuring System Mountable on Agricultural Tractors (트랙터 부착형 자동 토양경도 측정 시스템 개발)

  • 이현동;김기대;김찬수;김성환
    • Journal of Biosystems Engineering
    • /
    • v.27 no.6
    • /
    • pp.537-546
    • /
    • 2002
  • In this study an automatic soil hardness measuring system mountable on agricultural tractors was developed to improve the accuracy of manual soil hardness testers by a constant penetrating rate, right direction of the cone-penetrometer and the isolation of vibration from the operator. This was necessary to supply similar experimental condition for performance test of new model and comparative experiment. The results of the study are summaried as follows; 1. The system consisted of a sensing part of soil hardness, a driving part of the measuring system and an attaching part between the tractor and the measuring system. 2. The allowable limit value of the system developed was set to 392N to protect from breaking the serve motor and the coupling used in this system. 3. The driving shaft penetrated into soil by 0.3m to measure soil hardness. The soil hardness was measured at the depth of 0.3m from the soil surface but the penetrating work was stopped and the driving shaft was pulled out to protect the system when the value of the soil hardness was too big on foreign substances like stones or straws. 4. Two values measured by automatic measuring system developed in this research and manual penetrometer were compared by statistics hypothesis testing method. When two people measured the soil hardness at the depth of 0.1 and 0.15m by manual cone penetrometer, there was no relationship between two values by two people but the values at the same depths by automatic measuring system developed showed similarity. The automatic system, therefore, developed in this research was proper for measuring soil hardness.

Blasting Standardization works for NATM on the Seoul Subway Construction by Dr, Ginn Huh (서울 지하철공사 발파공법의 표준화)

  • Heo, Jin
    • Journal of the Korean Professional Engineers Association
    • /
    • v.16 no.3
    • /
    • pp.5-23
    • /
    • 1983
  • On the Seoul Metropolitan Subway Construction of No. 3, 4 Line, the total length is 57 Km and it is now undergoing almost 55% progress. The working method is classified into Open Cut of 70% and the rest of 30% tunnelling method in the 48 job site. Above tunnelling method is execute by American Steel Support System and the rest of 10 job site carried out by New Austria Tunnelling Method. This paper describes Blasting Standardizations works on the above Tunnelling ' Open Cut Method under big slogan, first safety, second execution. As a superintendent, I strived standardization of works with Better powder, Better Drills ' Better Pattern. Geological structure of Seoul area is composed by Jurassic Granite and also the above rockgroup are over burden by Alluviums as a Unconformity. First of all, I carried out the standard amount of powder and burden through experimental standard blasting by each powder as following Blasting works in the subway construction is surrounding shop Building, under pass the city river and also under pass highest building basement floor. I made allowable Blasting Vibration Value by West-Germany Vornorm DIN 4150, Teil 3 and should measure each blasting works as fellows all of powder is used basically Low-Gravity and Low Velocity such as Slurry, Ammonium Nitrate ' Finex I, II. for Smooth Blasting Instead of Gelatin Dynamite. Electric Detonation Cap is used basically M/S Delay Cup instead of Electric delay ' Simultaneous cap. I applied following formula V=KW3/4 $D^{-2}$ V=Particle Velocity (Cm/sec) K=Ginh Huh's Value W=Delay Charge (Kg) D=Distance(m) In the Open Cut, within 1m distance from H-pile I made to use the Concrete breaker, as following V=7W/$^{0.5}$V/$^{-1.75}$ On the Concentrate Building area, I advise to use Light class drill ø36m Bit and advance 1.1m per round blasting the three boom jumbo drill over ø45mm used only suburb of city.e Light class drill ø36m Bit and advance 1.1m per round blasting the three boom jumbo drill over ø45mm used only suburb of city.

  • PDF

Estimating Fatigue Life of APD Electronic Equipment for Activation of a Spaceborne X-band 2-axis Antenna (2축 짐벌식 X-band 안테나 구동용 전장품 APD 제어보드의 피로수명 평가)

  • Jeon, Young-Hyeon;Oh, Hyun-Ung
    • Journal of Aerospace System Engineering
    • /
    • v.11 no.1
    • /
    • pp.1-7
    • /
    • 2017
  • While a satellite is carried into orbit by a launch vehicle, it is exposed to the severe launch environment with random vibrations and shock. Accordingly, these vibration sources affect electronic equipment, particularly the printed circuit board (PCB) in the satellite. When the launch load impacts the PCB, it causes negative behavior. This causes perpendicular bending around the boundary of fixation points that finally leads to the failure of solder joints, lead wires, and PCB cracks. To overcome these issues, the electronic equipment design must meet reliability requirements. In this paper, Steinberg's method is used to derive allowable and maximum deflection to verify design from a life perspective concerning the control board of the Antenna Pointing Driver (APD) mounted on KOMPSAT-3.

Levitation Control Simulation of a Maglev Vehicle Considering Guideway Flexibility (가이드웨이 유연성이 고려된 자기부상열차 부상제어 시뮬레이션)

  • Han, Jong-Boo;Lim, Jaewon;Kim, Chang-Hyun;Han, Hyung-Suk;Kim, Sung-Soo
    • Journal of the Korean Society for Railway
    • /
    • v.18 no.1
    • /
    • pp.15-24
    • /
    • 2015
  • In magnetic levitation vehicles, the clearance between the magnet and track should be maintained within an allowable range through a feedback control loop. The flexibility of the guideway would introduce additional modes in the overall suspension system, resulting in dynamic interaction between the guideway vibration and the electromagnetic suspension control system. This dynamic interaction can be a serious problem, particularly at very low speeds or standstill, and may cause airgap instability. To optimize the overall system dynamics, an integrated dynamic model including mechanical and electrical parts and a flexible guideway as well as a control loop was developed. With the proposed model, airgap simulations at standstill were performed while varying the control gains, specifically with the aim of understanding the effects of gains of the PID controller on the airgap variation. The findings may be used to achieve a stable levitation controller design.

Analysis Method Considering the Ground Reinforcement Effect of Micropile by Field Loading Tests (재하시험을 통한 소구경말뚝의 지반보강효과를 고려한 해석법)

  • Hong, Seok-Woo
    • Journal of the Korean Geotechnical Society
    • /
    • v.25 no.1
    • /
    • pp.89-99
    • /
    • 2009
  • Compared to standard piling methods, micropile construction can be used in downtown areas since it generates less vibration and noise. Since it only causes less soil disturbance, it is commonly used as reinforcement to existing structures. In this study, a field wherein the bearing capacity and settlement of soil can not support the weight of the superstructure was selected and micropiles were implemented instead of ordinary piles. The deformation modulus of the micropile reinforced ground was determined and was directly reflected in the design. Loading testing was used to check whether or not the allowable bearing capacity satisfies the condition of the designed bearing capacity. The computed deformation modulus based from the test was used in the numerical analysis of soil to investigate the stability of the foundation and analysis method. And a method for controlling the bearing capacity and settlement was recommended.

Evaluating the accuracy of mass scaling method in non-linear quasi-static finite element analysis of RC structures

  • A. Yeganeh-Salman;M. Lezgy-Nazargah
    • Structural Engineering and Mechanics
    • /
    • v.85 no.4
    • /
    • pp.485-500
    • /
    • 2023
  • The non-linear static analysis of reinforced concrete (RC) structures using the three-dimensional (3D) finite element method is a time-consuming and challenging task. Moreover, this type of analysis encounters numerical problems such as the lack of convergence of results in the stages of growth and propagation of cracks in the structure. The time integration analysis along with the mass scaling (MS) technique is usually used to overcome these limitations. Despite the use of this method in the 3D finite element analysis of RC structures, a comprehensive study has not been conducted so far to assess the effects of the MS method on the accuracy of results. This study aims to evaluate the accuracy of the MS method in the non-linear quasi-static finite element analysis of RC structures. To this aim, different types of RC structures were simulated using the finite element approach based on the implicit time integration method and the mass scaling technique. The influences of effective parameters of the MS method (i.e., the allowable values of increase in the mass of the RC structure, the relationship between the duration of the applied load and fundamental vibration period of the RC structure, and the pattern of applied loads) on the accuracy of the simulated results were investigated. The accuracy of numerical simulation results has been evaluated through comparison with existing experimental data. The results of this study show that the achievement of accurate structural responses in the implicit time integration analyses using the MS method involves the appropriate selection of the effective parameters of the MS method.