A Study Measures to Prevent Aircraft Crossing and Establish Flight Procedures at Domestic Small Airports (국내 소형 공항의 항공기 월경방지 대책 및 비행절차 수립 연구)

  • Jae Pill Shim;Byung Heum Song;Su Min Kwak;Ji Woong Jung;Jun Seok Kim
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.31 no.2
    • /
    • pp.89-94
    • /
    • 2023
  • Recently, domestic small airport development plans are being promoted centering on islands, and among them, Baengnyeong Island Airport is located very close to North Korea due to its geographical characteristics. In particular, since it is located in the P-518, which is prohibited airspace, it is essential to configure the arrival/departure flight procedure route similarly to the current ship in terms of securing flight safety. Therefore, in this study, a plan for airport location and facility scale was proposed by focusing on the runway operated for the purpose of aircraft operation through consultations with the Ministry of National Defense. It was proposed to meet the standards of the Airport Facility Act as an airport dedicated to domestic flights for airside facilities such as runway length and direction, target aircraft, landing pad, apron, runway and taxiway width appropriate for the topographical characteristics of Baengnyeong Island. As a result, the flight procedure is generally established as a two-way visual flight, but the 10-way arrival/departure procedure was planned to be changed to an instrument (non-precision) according to the specificity of the region. In addition, a flight procedure was established and presented for safe and systematic operation by reflecting the changes in airport facility size (landing pad, runway end safety area, etc.) following the change in instrument flight procedure in the visual flight procedure.

Estimated Analysis for Runway Occupancy Time Improvement (활주로 점유 시간 개선의 효과성 예측 분석)

  • GwangHoon Park;GumSeock Kang;SungKwan Ku
    • Journal of Advanced Navigation Technology
    • /
    • v.27 no.5
    • /
    • pp.666-673
    • /
    • 2023
  • The runway occupancy time of landing aircraft is an important factor in determining runway capacity. The purpose of this study is to suggest improvement measures for runway occupancy time to improve the operation of existing airports. In order to derive improvement measures, a comparative analysis was conducted on the effectiveness of improvement using aircraft operation status data for specific days at the case airport. The FAA REDIM model was used to analyze the improvement plan, and the improvement application function of the model was used to confirm the effect of improving runway capacity by adding a rapid escape taxiway to an airport without a rapid escape taxiway. This study's approach can be applied to the derivation of runway improvement measures and preliminary prediction of effectiveness, and it presents cases that can be applied to future airport construction projects or airport improvement projects.

Analysis of Runway Occupancy Time Using ADS-B Message about Landing Airplane (ADS-B를 이용한 착륙 항공기의 활주로 점유 시간 분석)

  • Ku, SungKwan;Baik, Hojong
    • Journal of Advanced Navigation Technology
    • /
    • v.20 no.3
    • /
    • pp.167-174
    • /
    • 2016
  • Runway and taxiway is base facilities for aircraft take off and landing and runway capacity is one of major factor for airport capacity. Runway occupancy time is affect on the runway capacity. The identification of aircraft using taxiway by analysis of airport ground surveillance data and the measurement of pass time on the points is general method for the confirmation of the runway occupancy time. This study is runway occupancy time analysis of landing airplane using ADS-B message, in this study we surveyed landing aircraft runway occupancy time and analysis of serviced record using taxiway include rapid exit taxiway. The result of analysis is to confirm the different of landing direction and aircraft category on the same runway caused by structure of airport. Also the result of runway occupancy time analyzed data, it is base input data for the air transportation simulation.

Empirical Analysis of Airplane Route for Reduction of Aircraft Noise at Gimhae International Airport (김해국제공항 항공기 소음 저감을 위한 비행기항적실증분석)

  • Kim, Bong-Ki;Lee, Seung-Won
    • Journal of Environmental Science International
    • /
    • v.30 no.3
    • /
    • pp.257-266
    • /
    • 2021
  • This study explored measures to reduce noise applicable to Gimhae international airport centering on densely packed housing areas. Especially, as for measures to relieve noise damage on the densely packed housing areas in Gimhae-si, the noise reduction effect is expected to be doubled if the west runway (36L/18R) is used as the preferred runway for the 36 direction takeoff, as well as if the flight bypasses the densely packed housing areas by means of sophisticated navigation using the area navigation (RNAV) procedure based on performance-based navigation (PBN). Takeoff toward the south connects the flight path to the South Sea which has comparatively low noise impact, relieving noise damage on the densely packed housing areas (apartment complexes in Naeoe-dong of Gimhae-si, etc.) near the northern end of the runway. The operation of the runway displaced threshold is currently being implemented on the west runway (36L/18R) of Gimhae international airport. It has been found that swing landing in spring and summer when the wind blows from the south has a noise reduction effect on the noise sensitive areas at the side and end of the west runway (Gangdong-dong and Jukdong-dong of Gangseo-gu and Buram-dong of Gimhae-si, etc.).

A Comparative Study on Delay Calculation Method of Airport Capacity (공항 수용량의 지연시간 산출방식 비교 연구)

  • Lee, HyoJu;Kim, DoHyun
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.28 no.2
    • /
    • pp.47-52
    • /
    • 2020
  • Air transport demand is on a sharp rise due to growth in the aviation market. To prepare for this rapidly growing demand for aviation, airport operators are interested in the processing airport capacity. Airport throughput is determined to be the smallest of the facility capacities that make up the airport, but it is customary to determine the cost and time consuming runway capacity as airport capacity. Previous studies have shown that while recent studies have been conducted on airport capacity, there is little research on the criteria for determining capacity. In this study, we would like to determine the extent to which airport capacity is affected by the airport's operating hours and the resulting delays.

Estimation of Annual Runway Capacity for Jeju International Airport Considering Aircraft Delays (항공기 지연시간을 고려한 제주국제공항 활주로 연간용량 산정)

  • Park, Jisuk;Yun, Seokjae;Lee, Youngjong;Baik, Hojong
    • Journal of Korean Society of Transportation
    • /
    • v.33 no.2
    • /
    • pp.214-222
    • /
    • 2015
  • Jeju International Airport has become the most delayed airport in Korea, due to increased demand in air passengers and unexpected local weather condition. Observing the demands continuously grow for a decade, the airport is expected to be saturated in the near future. As a part of effort to prepare effective and timely measure for this expected situation, airport planners seeks the annual runway capacity, i.e., the appropriate number of flight operations in a given year with tolerable delay. In practice, the FAA formula is frequently adopted for the capacity estimation. The method, however, has intrinsic issues: 1) the hourly capacity imbedded in the formula is not clearly defined and thus the estimated value is vulnerable to be subjective judgement, and 2) the formula doesn't consider aircraft delay resulted from runway congestion. In this paper, we explain a novel method for estimating the daily runway capacity and then converting to the annual capacity taking into account the aircraft delay. In this paper, average delay of aircraft was measured using microscopic air traffic simulation model. Daily capacity of the runways were analyzed based on the simulation outputs and the method to assess the yearly capacity is introduced. Using a microscopic simulation model named TAAM, we measure the average aircraft delay at various levels of flight demand, and then estimate the practical daily runway capacity. The estimated daily and annual runway capacities of Jeju airport are about 460 operations a day which is equal to 169,000 operations year. The paper discusses how to verify the simulation model, and also suggests potential enhancement of the method.

An Application of the Improved Models for Risk Assessment of Runway Safety Areas (활주로안전구역 위험평가 개선모델 적용 연구)

  • Kim, Do-Hyun;Hong, Seung-Beom
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.23 no.2
    • /
    • pp.1-6
    • /
    • 2015
  • The RSA is intended to prevent the following five types of events from becoming an accident: landing overruns, landing undershoots, landing veer-offs, takeoff overruns and takeoff veer-offs. The improved models are based on evidence from worldwide accidents and incidents that occurred during the past 27 years. The analysis utilizes historical data from the specific airport and allows the user to take into consideration specific operational conditions to which movements are subject, as well as the actual or planned RSA conditions in terms of dimensions, configuration, type of terrain, and boundaries defined by existing obstacles. This paper shows how to apply the improved models for Risk Assessment of Runway Safety Areas (Airport cooperative research program(ACRP) Report 50) into an airport and the outcome differences between the old models based on ACRP report 3-Analysis of aircraft overrun and undershoots for runway safety areas and the new models from ACRP report 50 in the specific airport.

A study on the reduction in Ground Turbulence by the fence in the vicinity of airport runway (활주로 주변에 설치된 fence로 인한 Ground Turbulence의 감소 대한 연구)

  • Sheen, Dong-Jin;Hong, Gyo-Young;Kim, Young-In
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.17 no.4
    • /
    • pp.32-41
    • /
    • 2009
  • This paper presents the work being carried out in order to reduce the ground turbulence by the fence in the vicinity of airport runway. In preliminary study, we knows that cross-wind effect in the vicinity of runway is highly dependent on the shape of the buildings and have predicted results confirmed reduction of wind-effect by doing that set up the building with a fence, terraced shape or gap. This study is to figure out effect of ground turbulence by the building with fence, which is changing fence height, in using two-dimensional computational fluid dynamics analysis.

  • PDF

Case Study of Geogrid Reinforcement in Runway of Inchon International Airport (지오그리드를 활용한 인천국제공항 활주로 보강사례)

  • 신은철;오영인;이규진
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1999.11c
    • /
    • pp.105-116
    • /
    • 1999
  • The Inchon International Airport site was formed by reclaimed soil from the sea. The average thickness of soft soil Is about 5 m and most of soft soils are normally consolidated or slightly over consolidated. There are many box culverts which are being constructed under the runways in the airfield. Sometimes, differential settlement can be occurred in the adjacent of box culvert or underground structures at the top layer of runway Soil compaction at very near to the structure is not easy all the time. Thus, one layer of geogrid was placed at the bottom of lean concrete layer for the concrete paved runway and at the middle of cement stabilized sub-base course layer for the asphalt paved runway. The length of geogrid reinforcement is 5m from the end of box culvert for both sides. The extended length of geogrid was 2m from the end of backfill soil in the box culvert. The tensile strength tests of geogrid were conducted for make sure the chemical compatibility with cement treated sub-base material. The location of geogrid placement for the concrete paved runway was evaluated. The construction damage to the geogrid could be occurred. Because the cement treated sub-base layer or lean concrete was spread by the finisher. The magnitude of tensile strength reduction was 1.16%~1.90% due to the construction damage and the ultimate tensile strength is maintained with the specification required. Total area of geogrid placement in this project is about 50,000 $m^2$.

  • PDF

A Study on the Application of Runway Friction Measurements (활주로 마찰계수 측정 및 적용에 관한 연구)

  • Noh, Kun-Soo
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.24 no.3
    • /
    • pp.62-68
    • /
    • 2016
  • According to the accident/incident reports of aircraft runway overruns and excursions, it generally shows runway friction reduction and aircraft braking capability deterioration are the basic causes due to adverse weather. Although surface of paved runway gets wet, it also should give good friction capability. If runway surface is worn due to long time usage and friction capability is reduced due to rubber accumulation or weather conditions(snow, rain, ice etc.), airport authorities should rapidly measure friction coefficient and give them to relevant persons through aeronautical information system and support safe takeoff and landing. Operation wise, these information of friction coefficient reduction should be lead to aircraft performance adjustments, but the data from manufacturer(performance manual) are airplane braking coefficient and the data from airport authorities are vehicle measured braking coefficient. But these two data are considered as the same meaning although the definite relationship between them is not clarified yet. So I am trying to search for the technical background of these two data and suggest reasonable method to use them efficiently.