• 제목/요약/키워드: Agricultural reservoir embankment raising project

검색결과 2건 처리시간 0.013초

기후변화에 따른 둑높임 저수지의 용수공급능력 평가 (Evaluating Water Supply Capacity of Embankment Raised Reservoir on Climate Change)

  • 이재남;노재경
    • 한국농공학회논문집
    • /
    • 제57권4호
    • /
    • pp.73-84
    • /
    • 2015
  • An embankment raising project on 113 agricultural reservoirs in Korea was implemented in 2009 to increase water supply capacity for agricultural water and instream uses. This study evaluated the future water supply capacity of the Imgo reservoir at which the agricultural reservoir embankment raising project was completed, considering climate change scenarios. The height of the embankment of the reservoir was increased by 4.5 m, thereby increasing its total storage from 1,657.0 thousand to 3,179.5 thousand cubic meters. To simulate the reservoir water storage with respect to climate changes, two climate change scenarios, namely, RCP 4.5 and RCP 8.5 (in which greenhouse gas reduction policy was executed and not executed, respectively) were applied with bias correction for reflecting the climate characteristics of the target basin. The analysis result of the agricultural water supply capacity in the future, after the agricultural reservoir embankment raising project is implemented, revealed that the water supply reliability and the agricultural water supply increased, regardless of the climate change scenarios. By simulating the reservoir water storage considering the instream flow post completion of the embankment raising project, it was found that water shortage in the reservoir in the future is not likely to occur when it is supplied with an appropriate instream flow. The range of instream flow tends to decrease over time under RCP 8.5, in which the greenhouse gas reduction policy was not executed, and the restoration of reservoir storage was lower in this scenario than in RCP 4.5, in which greenhouse gas reduction policy was executed.

현장계측과 수치해석에 의한 농업용저수지 제체의 안정성 평가 (Safety Evaluation of Agricultural Reservoirs due to Raising Embankment by Field Monitoring and Numerical Analysis)

  • 이광솔;이달원;이영학
    • 한국농공학회논문집
    • /
    • 제58권2호
    • /
    • pp.31-44
    • /
    • 2016
  • This study analyzed pore water pressure, earth pressure and settlement through field monitoring on the project site in which raising embankments are being built through backside extension, and compared the behaviors of seepage analysis, slope stability analysis and stress-strain during flood water levels and rapid drawdown under steady state and transient condition. The variation of pore water pressure showed an increase during the later period in both upstream and downstream slope, with downstream slope more largely increased than upstream slope overall. The variation of earth pressure increased according to the increase of embankment heights, while the change largely showed in the upstream slope, it was slowly increased in the downstream slope. The settlements largely increased until 23 m as embankment heights increased, and showed very little settlement overall. Under a steady state and transient conditions, the seepage quantity per day and leakage quantity per 100 m of embankment against total storage were shown to be stable for piping. The hydraulic gradient at the core before and after raising embankments was greater than the limit hydraulic gradient, showing instability for piping. The safety factor of upstream and downstream slopes were shown to be very large at a steady state, while the upstream slopes greatly decreased at a transit conditions, downstream slopes did not show any significant changes. The horizontal settlements, the maximum shear strain and stress are especially distributed at the connecting portion of the existing reservoir and the new extension of backside. Accordingly, the backside extension method should be designed and reinforced differently from the cases of other types reservoirs.