• Title/Summary/Keyword: Aged long-term Public Rental Housing

Search Result 5, Processing Time 0.016 seconds

Analysis of Factors Affecting Economic Feasibility of Long-term Public Rental Housing Reconstruction Project

  • Joe, Won Goog;Cho, Jae Ho;Son, Bo Sik;Chae, Myung Jin;Lim, Nam Gi;Chun, Jae Youl
    • Architectural research
    • /
    • v.24 no.3
    • /
    • pp.85-91
    • /
    • 2022
  • The public rental housing policy aims to provide the housing to the vulnerable class who do not have enough credit to own houses. The Korean government introduced new policies for housing supply to improve the availability of new houses. However, it is difficult to expand the supply because of the accumulated deficit of public rental housing. In this study, the economic feasibility of long-term public rental housing reconstruction projects was examined to ensure the economic and sustainable growth of public rental housing. The research found that the compensation for the accumulated deficit is needed. Also the research analyzed and identified the factors affecting the economic feasibility of reconstruction projects. The significant factors identified in this research are: the supply price of pre-sale/rental housing in the reconstruction project, total cost of the reconstruction project, and total floor area of the reconstruction project. According to the analysis results, it is necessary to increase the rent of existing long-term public rental housing, expand the government subsidy, increase the supply price of pre-sale/rental housing, and reduce the total project cost. However, there are limitations. For example, the fluctuations of construction market, residents' burden of housing costs, and the limit of the budget of the public housing authority. The increasing total Floor Area Ratio(FAR) limitation of the reconstruction project would be the realistic solution to the problem because it gives incentives to the reconstruction project.

The Analysis of the Importance of Influencing Factors in the Planning Stage of the Long-Term Public Rental Housing of Remodeling Project (장기공공임대주택 리모델링 사업의 기획단계 영향요인 중요도 분석)

  • Jung, Yong-Chan;Jin, Zheng-Xun;Hyun, Chang-Taek;Lee, Sanghoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.3
    • /
    • pp.3-16
    • /
    • 2024
  • The government announced the Housing Welfare Roadmap (November 2017), to expand the supply of public rental housing by reconstructing aged long-term public rental complexes. Also, remodeling projects for complexes with low business feasibility of reconstruction projects are recognized as an alternative to supplying public rental housing in urban area. This study analyzed influence factors by dividing them into project feasibility, architectural plan, urban & residential environment plan, and legal system groups in order to establish a plan for long-term public rental housing remodeling project. Futhermore, this work conducted the principal component analysis to get the principal component factors among the influence factors of each group, and the weight analysis to calculate weighting of them. In addition, major influence factors were derived by calculating the relative importance score (RIS) of each factor. Lastly this paper validated the major influence factors and applicability of the procedure to select 3 complexes that can be reviewed for remolding project among 33 long-term public rental housing complexes located in Seoul. The results of this study are expected to be useful when establishing a remodeling project plan for long-term public rental housing.

Minimum Floor Area Ratio Estimation Model for Reconstruction Projects to Compensate for Loss of the Aged Long-term Public Rental Housing (노후 장기공공임대주택 손실보전을 위한 재건축사업의 최소용적률 수리모델)

  • Joe, Wongoog;Na, Seunguk;Cho, Jeaho;Chae, MyungJin;Son, Bosik;Kim, Hyunsoo;Chun, JaeYoul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.5
    • /
    • pp.108-116
    • /
    • 2022
  • Started in 1989 as Public Permanent Rental Housing scheme, public rental housing lease policy is increasing target residents and supply in each government by introducing new supply types. However, public housing business entities have difficulties in expanding the supply due to cumulated deficit. The research suggested long-term public rental housing reconstruction business as a method to preserve the cumulated deficit from the previous. Minimum floor area ratio mathematical model was suggested by defining the floor area ratio of reconstruction business as minimum, since housing sales profit after reconstruction could preserve aggregated deficit, and mathematically approached by considering the traits of long-term public rental housing reconstruction. The determinant for minimum floor area ratio mathematical model comprise cumulated deficit of the existing long-term public rental housing, land size of reconstructed sale housing, housing sales price per unit area, and business cost per unit area. Minimum floor area ratio mathematical model is expected to be the milestone for supporting decision making regarding the economic part of old long-term public lease housings' reconstruction scale, and expanding housing supply within urban area.

The Analysis and Forecasting Model for Maintenance Costs Considering Elapsed Years of Old Long-Term Public Rental Housing (노후 장기공공임대주택의 경과 연수별 유지관리비 분석 및 예측 모형)

  • Jung, Yong-Chan;Jin, Zheng-Xun;Hyun, Chang-Taek;Lee, Sanghoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.3
    • /
    • pp.83-94
    • /
    • 2022
  • The number of public rental housing has increased according to the government's 「Housing Welfare Roadmap (2017)」, and facility maintenance costs for the demand of improvement of performance and residential standards due to the aging of long-term public housing are significantly increasing. Consequently, the financial burden of public housing rental business for maintaining stocked housing is aggravated. However, there is a lack of objective data to analyze the size of the maintenance costs that are executed by the type of repair work, and the elapsed years of the aged long-term public rental housing. This study analyzes the execution status of 33 long-term public rental housing complexes located in Seoul for 14 to 28 years of elapsed years based on the data of maintenance costs. In addition, this study proposes a model to predict the maintenance costs by elapsed years by dividing 'Long-term Repair Plan Work and Government-Funded Project [Y1]', 'Planned Repair Work and General & Unplanned Repair Work [Y2]', and 'Total maintenance costs [Y3]'. It is intended to be used as basic data for the establishment of the maintenance plan at the stage of setting up the budget and the establishment of the sustainable operation plan for public rental housing

The Study on Evaluating the Policy Value of Public Projects for Housing Welfare - Focused on the Remodeling Projects for Long Term Rental Housing - (장기공공임대주택의 리모델링을 통한 주거복지 정책사업의 가치평가에 관한 연구)

  • Cho, Yongkyung;Lee, Sangyoub
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.5
    • /
    • pp.82-93
    • /
    • 2014
  • Long Term rental housing, which is supplied for performing housing welfare, has been aging from permanent rental housing. Therefore, variety housing welfare projects are planing and performing for improving aged facilities. However, although every welfare policy are necessary, we have to efficiently allocate and commit the funds, because the fund and resources is limited. And there is required the feasibility study before performing public project for housing welfare, because it needs large amount of financial supports by government. Meanwhile, because most of existed studies are focused on guide development, it has limitation to apply the result of existed studies in this study, which considers public remodeling project for housing welfare. But in reality, public project is been decided by willing of policy decision-maker. Therefore, in this study, we suggest the evaluation method of policy value for two alternatives(remodeling and maintain) of a aged long term rental housing. To extract the attributes of policy value, we considered categorized items of preliminary feasibility study. Through extracting attribute factors of policy value for aged long term rental housing, we can calculate the policy value of remodeling and maintain alternatives by using MAUT. As a result of analysis, we can find that the utility value of remodeling is 0.6161 and the utility value of maintain is 0.2461 and also the utility of remodeling is higher than utility of maintain. Therefore, when we plan the public projects for performing housing welfare, we can choose remodeling alternative rather than maintain alternative using quantitive data.