• 제목/요약/키워드: Adjusting

검색결과 4,385건 처리시간 0.032초

Effects of Transfer Gate on the Photocurrent Characteristics of Gate/Body-Tied MOSFET-Type Photodetector

  • Jang, Juneyoung;Seo, Sang-Ho;Kong, Jaesung;Shin, Jang-Kyoo
    • 센서학회지
    • /
    • 제31권1호
    • /
    • pp.12-15
    • /
    • 2022
  • In this study, we studied the effects of transfer gate on the photocurrent characteristics of gate/body-tied (GBT) metal-oxide semiconductor field-effect transistor (MOSFET)-type photodetector. The GBT MOSFET-type photodetector has high sensitivity owing to the amplifying characteristic of the photocurrent generated by light. The transfer gate controls the flow of photocurrent by controlling the barrier to holes, thereby varying the sensitivity of the photodetector. The presented GBT MOSFET-type photodetector using a built-in transfer gate was designed and fabricated via a 0.18-㎛ standard complementary metal-oxide-semiconductor (CMOS) process. Using a laser diode, the photocurrent was measured according to the wavelength of the incident light by adjusting the voltage of the transfer gate. Variable sensitivity of the presented GBT MOSFET-type photodetector was experimentally confirmed by adjusting the transfer gate voltage in the range of 405 nm to 980 nm.

NEURAL NETWORK CONTROLLER FOR A PERMANENT MAGNET GENERATOR APPLIED IN WIND ENERGY CONVERSION SYSTEM

  • Eskander Mona N.
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2001년도 Proceedings ICPE 01 2001 International Conference on Power Electronics
    • /
    • pp.656-659
    • /
    • 2001
  • In this paper a neural network controller for achieving maximum power tracking as well as output voltage regulation, for a wind energy conversion system(WECS) employing a permanent magnet synchronous generator, is proposed. The permanent magnet generator (PMG) supplies a dc load via a bridge rectifier and two buck-boost converters. Adjusting the switching frequency of the first buck-boost converter achieves maximum power tracking. Adjusting the switching frequency of the second buck-boost converter allows output voltage regulation. The on-times of the switching devices of the two converters are supplied by the developed neural network(NN). The effect of sudden changes in wind speed ,and/or in reference voltage on the performance of the NN controller are explored. Simulation results showed the possibility of achieving maximum power tracking and output voltage regulation simultaneously with the developed neural network controller. The results proved also the fast response and robustness of the proposed control system.

  • PDF

Adjusting Planning Management and Control to the Owner Environment Case Study: Consultant Adjustment to the Owner Environment in Thailand

  • Sruntummakul, Apai;Leungbootnak, Narong;MIN, Vuthea
    • Journal of Construction Engineering and Project Management
    • /
    • 제5권3호
    • /
    • pp.10-17
    • /
    • 2015
  • Consultant and owner play a very important role in the construction sector which is one of the main sectors in economic development. There are many stakeholders in a construction project including but not limited to: owner, consultant, contractor, subcontractor, and supplier. The consultant is the party who is to stay in close touch with the project owner, which both consultant and owner are considered as the main key stakeholders to make the project happen. It's not a simple task for a consultant to just implement the same style of management and control within various projects that are of a different background and character of owners. Thus, the adjusting plan management and control to the owner environment has been an essential technique to drive the project to success. The objective of this paper is to identify the significant management techniques for adjusting a plan of management and control to the owner environment in Thailand. The methodology is the identification throughout the analogous to abduction from literature review and our empirical observations of Future Engineering Consultants Co, Ltd. We have been in consultation for twenty-five years (25) in Thailand with 209 projects from both public and private owners. As a result, there are (1) Project management styles, (2) Personal style, (3) Owner expectation management, (4) Scope Management, (5) Time Management, (6) Cost Management, (7) Quality Management, and (8) Environmental Management. The input are: a clear defined goal, showing respect by giving good service, maintaining high quality, keeping in touch with owners, and resources. This would give the output of the project's success by meeting the owner's expectation and requirements.

Association between periodontal flap surgery for periodontitis and vasculogenic erectile dysfunction in Koreans

  • Lee, Jae-Hong;Choi, Jung-Kyu;Kim, Sang-Hyun;Cho, Kyung-Hyun;Kim, Young-Taek;Choi, Seong-Ho;Jung, Ui-Won
    • Journal of Periodontal and Implant Science
    • /
    • 제47권2호
    • /
    • pp.96-105
    • /
    • 2017
  • Purpose: The National Health Insurance Service-National Sample Cohort and medical checkup data from 2002 to 2013 were used to evaluate the association between periodontal surgery for the treatment of periodontitis (PSTP) and vasculogenic erectile dysfunction (VED). Methods: Bivariate and multivariate logistic regression analyses were applied to a longitudinal retrospective database to assess the association between PSTP and VED while adjusting for the potential confounding effects of sociodemographic factors (age, household income, insurance status, health status, residence area, and smoking status) and comorbidities (diabetes mellitus, angina pectoris, cerebral infarction, and myocardial infarction). Results: Among the 7,148 PSTP within the 268,296 recruited subjects, the overall prevalence of VED in PSTP was 1.43% (n=102). The bivariate analysis showed that VED was significantly related to PSTP (odds ratio [OR], 1.99; 95% confidence interval [CI], 1.38-2.06; P<0.001), and this was confirmed in the multivariate analysis after adjusting for sociodemographic factors and comorbidities (OR, 1.29; 95% CI, 1.06-1.58; P=0.002). Conclusions: Subjects with a history of periodontal flap surgery had a significantly higher risk of VED, after adjusting for potential confounding factors. Further studies are required to identify the key mechanisms underlying the association between severe periodontal disease and VED.

제연 TAB를 통한 철도 지하환승통로의 거실제연설비 성능평가 (A Performance Evaluation of Zone Smoke Control Systems for Railway Underground Transit Passage by Smoke Control TAB)

  • 설석균;김준환;박민석;오승민;안용철;최준호
    • 한국화재소방학회논문지
    • /
    • 제31권1호
    • /
    • pp.1-9
    • /
    • 2017
  • 본 연구에서는 거실제연설비가 설치된 철도 지하환승통로에 현장성능평가시험인 제연 TAB(Test, Adjusting, Balancing)를 실시하여, 제연설비 성능 확보에 미치는 영향을 분석하고 개선방안을 도출하였다. 제연 TAB는 지하환승통로의 제연설비 설계자료 분석, 제연덕트 누기테스트, 제연송풍기와 덕트의 풍량 및 풍속 측정, Smoke test로 나누어 진행되었다. 제연덕트 누기시험을 통해 누기율을 측정하여 덕트의 기밀성을 확인하였고, 흡입측 덕트 정압손실로 인한 제연풍량 부족의 문제점을 개선하여 송풍기의 성능을 확보하였다. 또한, Smoke test을 통해 예상제연구역별 제연댐퍼 동작 시 자연풍, 열차풍 영향으로 인한 문제점을 분석하고 개선하여 예상 제연구역 내 제연이 원활하게 이루어짐을 확인하였다.

눈꺼풀처짐증 수술 후의 조기 재수술 (Early Adjusting Surgery after Blepharoptosis Repair)

  • 송철홍;정재민;박대환
    • Archives of Plastic Surgery
    • /
    • 제33권1호
    • /
    • pp.95-100
    • /
    • 2006
  • The challenge of accurately predicting eyelid height after blepharoptosis surgery is well-known problem even in complete hands. From May, 1988 to December, 2004, authors reviewed 182 cases(240 eyes) of blepharoptosis corrected by frontalis muscle transfer or levator resection and had experienced 10 cases(15 eyelids) of early reoperation around 1 week. The period from initial operation to reoperation are between six to eight days and mean period is seven days. Initial operative procedures were frontalis muscle transfer in 3 cases(4 eyelids) and levator resection in 7 cases(11 eyelids). Follow up period ranged from 6 months to 16 years. Early adjusting surgery was performed in accordance with the preoperative and postoperative degree of ptosis of patient and considering previous operative technique. The results are evaluated according to the criteria of an ideal correction by Souther and Jordan. Seven patients have good or satisfactory results(less than 1 mm asymmetry, good in 5 cases and satisfactory in 2 cases). Three patients(5 eyelids) recorded as poor results(more than 2 mm asymmetry). Even if early or late reoperation can be effective in correcting unsatisfactory results after correction of blepharoptosis, early reoperation is better than later reoperation because early reoperation can offer a reduction in time to final result, the ease with which it is performed, potential cost savings. The experience of surgeon is also important factor for the reatment of recurred blepharoptosis