• Title/Summary/Keyword: Actual Load

Search Result 1,383, Processing Time 0.033 seconds

Stress Behaviors of Superheater Tubes under Load Change Operation in HRSG (배열회수보일러의 부하변동 운전에 따른 과열기 튜브들의 응력거동)

  • Chong, Chae-Hon;Song, Jung-Il
    • Journal of the Korean Solar Energy Society
    • /
    • v.28 no.6
    • /
    • pp.33-39
    • /
    • 2008
  • The purpose of this study is not only to evaluate the stress behavior of tubes in superheater in HRSG during the load change operation but also to find root causes of failure from stress behavior. Firstly, temperature during operation was collected to perform stress analysis from actual HRSG. Part load and full load stress analysis which can be represented as the whole load change operations were performed using commercial finite element software. The possibility that can lead to tubes failure is found by stress analysis and its results is compared with metallurgical mircrostructure of failed tube which was taken from actual HRSG.

Gear Analysis of Hydro-Mechanical Transmission System using Field Load Data (필드 부하를 활용한 정유압기계식 변속시스템의 기어 해석)

  • Kim, Jeong-Gil;Lee, Dong-Keun;Oh, Joo-Young;Nam, Ju-Seok
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.20 no.5
    • /
    • pp.111-120
    • /
    • 2021
  • A tractor is an agricultural machine that performs farm work, such as cultivation, soil preparation, loading, bailing, and transporting, through attached working implements. Farm work must be carried out on time per the growing season of crops. As a result, the reliability of a tractor's transmission is vital. Ideally, the transmission's design should reflect the actual load during agricultural work; however, configuring such a measurement system is time- and cost-intensive. The design and analysis of a transmission are, therefore, mainly performed by empirical methods. In this study, a tractor with a measurement system was used to measure the actual working load in the field. Its hydro-mechanical transmission was then analyzed using the measured load. It was found that the velocity factor, load distribution factor, lubrication factor, roughness factor, relative notch sensitivity factor, and life factor affect the gear strength of the transmission. Also, loading conditions have a significant influence on the reliability of the transmission. It is believed that transmission reliability can be enhanced by analyzing the actual load on the transmission, as performed in this study.

Annual Yearly Load Forecasting by Using Seasonal Load Characteristics With Considering Weekly Normalization (주단위 정규화를 통하여 계절별 부하특성을 고려한 연간 전력수요예측)

  • Cha, Jun-Min;Yoon, Kyoung-Ha;Ku, Bon-Hui
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.199-200
    • /
    • 2011
  • Load forecasting is very important for power system analysis and planning. This paper suggests yearly load forecasting of considering weekly normalization and seasonal load characteristics. Each weekly peak load is normalized and the average value is calculated. The new hourly peak load is seasonally collected. This method was used for yearly load forecasting. The results of the actual data and forecast data were calculated error rate by comparing.

  • PDF

Gear Rating and Contact Pattern Analysis for Rotavator Gearbox Using Actual Working Load (실 작업 부하를 이용한 로타베이터 기어박스의 강도 평가와 치면 접촉 패턴 해석)

  • Kim, Jeong-Gil;Cho, Seung-Je;Lee, Dong-Keun;Oh, Joo-Young;Shin, Min-Seok;Park, Young-Jun
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.20 no.6
    • /
    • pp.92-99
    • /
    • 2021
  • The rotavator is attached to the three-point hitch at the rear of a tractor and uses the power take-off strength of the tractor to perform soil harrowing. During operation, the power transmitted to the gearbox of the rotavator varies with the soil characteristics and depth. These properties influence the reliability of the gearbox. In this study, actual load measurements and analyses were performed using a rotavator. In addition, the safety factor and fatigue life of the gearbox components were determined using the analysis results. Through analysis and tests, the contact pattern of the gear tooth surface was identified. The input power values of the gearbox were minimum and maximum at 54.5% and 84.5% of the tractor power, respectively. Based on the actual load analysis results, the strength and fatigue life of the gearbox components were satisfied. In addition, through the analysis and testing of the gear contact pattern, it was confirmed that a similar contact occurred. Through the analysis, the magnitude of the load acting on the tooth surface of the gear was confirmed.

Field Adaptability Test for the Full Load Rejection of Nuclear Turbine Speed Controllers using Dynamic Simulator

  • Choi, In-Kyu;Kim, Jong-An;Woo, Joo-Hee
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.23 no.7
    • /
    • pp.67-74
    • /
    • 2009
  • This paper describes the speed control functions of the typical steam turbine speed controllers and the test results of generator load rejection simulations. The goal of the test is to verify the speed controller's ability to limit the steam turbine's peak speed within a predetermined level in the event of generator load loss. During normal operations, the balance between the driving force of the steam turbine and the braking force of the generator load is maintained and the speed of the turbine-generator is constant. Upon the generator's load loss, in other word, the load rejection, the turbine speed would rapidly increase up to the peak speed at a fast acceleration rate. It is required that the speed controller has the ability to limit the peak speed below the overspeed trip point, which is typically 110[%] of rated speed. If an actual load rejection occurs, a substantial amount of stresses will be applied to the turbine as well as other equipments, In order to avoid this unwanted situation, not an actual test but the other method is necessary. We are currently developing the turbine control system for another nuclear power plant and have plan to do the simulation suggested in this paper.

Load Leveling of Block Erection Network Using Diminution of Maximum Load Based on Constraint Satisfaction Technique (제약만족기법 기반의 최대부하감소를 통한 탑재 네크워크의 부하평준화)

  • Ryu, Ji-Sung;Kim, Hong-Tae;Park, Jin-H.;Lee, Byung-No;Shin, Jong-Gyu
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.41 no.5
    • /
    • pp.55-62
    • /
    • 2004
  • The logistics of entire shipbuilding process are integrated during the block erection process and the schedules for the erection process are made prior to. the schedules of any other processes. Therefore, efficient scheduling of the block erection process are one of most important issues in shipbuilding. There are only a few studies published regarding block erection scheduling methods because of its complexity and variability. This paper proposes an algorithm for diminution of maximum load based on constraint satisfaction technique. it is developed primarily for the efficiency in load leveling and applicability to the actual block erection process. The proposed algorithm is applied to actual block erection process and the results shows improvements in load leveling. It can also be used for the scheduling of fabrication, sub-assembly, and assembly to improve load leveling.

Conversion Function and Relationship of Loss of Load Expectation Indices on Two Kinds of Load Duration Curve (두 종류의 부하곡선에 관한 공급지장시간기대치(LOLE)의 상호 변환관계성)

  • Lee, Yeonchan;Oh, Ungjin;Choi, Jaeseok;Cha, Junmin;Choi, Hongseok;Jeon, Donghun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.66 no.3
    • /
    • pp.475-485
    • /
    • 2017
  • This paper develops a conversion function and method transforming from daily peak load curve used $LOLE_D$ [days/year] to hourly load curve used $LOLE_H$[hours/year]and describes relationship between $LOLE_D$ [days/year] and $LOLE_H$ [hours/year]. The indices can not only be transformed just arithmetically but also have different characteristics physically because of using their different load curves. The conversion function is formulated as variables of capacity and forced outage rate of generator, hourly load daily load factor and daily peak load yearly load factor, etc. Therefore, the conversion function (${\gamma}={\varphi}$(.)) can not be simple. In this study, therefore, the function is formulated as linear times of separated two functions. One is an exponential formed conversion function of daily load factor. Another is formulated with an exponential typed conversion function of daily peak load yearly load factor. Futhermore, this paper presents algorithm and flow chart for transforming from $LOLE_D$[days/year] to $LOLE_H$[hours/year]. The proposed conversion function is applied to sample system and actual KPS(Korea Power System) in 2015. The exponent coefficients of the conversion functions are assessed using proposed method. Finally, assessment errors using conversion function for case studies of sample system and actual system are evaluated to certify the firstly proposed method.

Comparison of Evacuation Efficiency for Stair Width and Code for Occupant Load Calculation in High-rise Buildings (고층의 주상복합건축물 계단폭과 수용인원 산정기준에 따른 피난효율의 비교)

  • Lee, Yang-Ju;Ko, Kyoung-Chan;Park, Woe-Chul
    • Fire Science and Engineering
    • /
    • v.25 no.1
    • /
    • pp.1-6
    • /
    • 2011
  • An evacuation simulation was carried out to confirm evacuation efficiency for stair width and problems in calculation of occupant load for high-rise buildings. The evacuation time and number of evacuated persons from a 39 story condominium-mercantile building were calculated by using Simulex for stair widths of 1.2 m, 1.5 m, and 1.8 m. The total occupant load based on the Korean code was higher than the number of actual residents by 2.3 times, and that based on the NFPA 101 Life Safety Code by 2.6 times, respectively. For the occupant load based on the Korean code, smaller stair width resulted in lower evacuation efficiencies due to bottlenecks in egress. For the actual residents and NFPA code-based occupant load, a high evacuation efficiency and negligible effects of the stair width on evacuation efficiency were confirmed. It was shown that there was a bottleneck even at the stair width of 1.8 m for the Korean code-based occupants, while the stair width of 1.2 m provided safe egress to the actual residents or NFPA code-based occupants. This recommended further studies on possibility of lowering the level of the Korean code in calculation of the occupant load.

Anticipated and actual performance of composite girder with pre-stressed concrete beam and RCC top flange

  • Gurunaathan, K.;Johnson, S. Christian;Thirugnanam, G.S.
    • Structural Engineering and Mechanics
    • /
    • v.61 no.1
    • /
    • pp.117-124
    • /
    • 2017
  • Load testing is one of the important tests to determine if the structural elements can be used at the intended locations for which they have been designed. It is nothing but gradually applying the loads and measuring the deflections and other parameters. It is usually carried out to determine the behaviour of the system under service/ultimate loads. It helps to identify the maximum load that the structural element can withstand without much deflection/deformation. It will also help find out which part of the element causes failure first. The load-deflection behaviour of the road bridge girder has been studied by carrying out the load test after simulating the field conditions to the extent possible. The actual vertical displacement of the beam at mid span due to the imposed load was compared with the theoretical deflection of the beam. Further, the recovery of deflection at mid span was also observed on removal of the test load. Finally, the beam was checked for any cracks to assert if the beam was capable of carrying the intended live loads and that it could be used with confidence.

Correlation Analysis about Loop Impedance and Load Condition (루프임피던스와 부하상태의 상관관계 분석)

  • Jung, Jin-Soo;Kim, Han-Sang;Kim, Sun-Gu;Han, Woon-Ki;Park, Chan-Eom
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.2
    • /
    • pp.342-346
    • /
    • 2012
  • This paper presents a loop impedance(inner loop impedance & external impedance) measurement method in TN system. When the measurement of a loop impedance then the measurement result have a some error by load condition. In this paper suggest the loop impedance measurement on actual loading condition by two experiment. one was laboratory condition and the other was the actual measurement on site. Analysis result, measuring error by load condition has not effect on measuring loop impedance.