• Title/Summary/Keyword: Actual Load

Search Result 1,400, Processing Time 0.025 seconds

New Inspection Skill for Load-test of Hydraulic Elevator without Actual Loads (엘리베이터 하중시험 대체 검사기법 개발)

  • Heo, Yun-Seop;Eom, Yong-Gi
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.62 no.3
    • /
    • pp.127-132
    • /
    • 2013
  • In order to check traction of the elevator, the load-test is positively necessary on the inspection of elevator in Korea. So actual loads are used in the elevator car for the load-test. However, some of advanced countries in Europe, for example Germany, are using the alternative method with no load test instead of traditional load-test. Commonly hydraulic elevator, compared to passenger elevator is mainly used for loading heavy weights. It requires a great deal of labor to carry out load-test. The reason is why we developed a new inspection skill for the load-test of hydraulic elevator without actual loads. The results of studies show that the new method of the load-test can be replace the traditional load-test.

A Study on Artificial Wheel Load Generation Method Using PSD Analysis (PSD 함수를 이용한 인공윤하중의 생성기법에 대한 연구)

  • Cho, Kwang-Il;Choi, Moon-Seock;Lim, Ji-Young;Kim, Sang-Hyo
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2008.04a
    • /
    • pp.184-189
    • /
    • 2008
  • In this study, an artificial wheel load generation method is proposed to assist practical engineers performing dynamic analysis with simple procedure. To generate an artificial wheel loads from running vehicle, PSD(Power Spectrum Density) profiles of actual wheel load were sampled in terms of various road roughnesses. A detailed truck and bridge models were used for sampling actual wheel load to represent the real motion of moving vehicle. These wheel load profiles were simplified for the artificial wheel load. The simplification of actual wheel load profiles was performed by regression analysis. The result showed that the artificial wheel load well represents the real profiles of wheel load.

  • PDF

Resistance Model for Reliability Analysis of Existing Steel Girder Bridges (강거더 교량의 신뢰성해석을 위한 저항모델 개발)

  • Eom, Jun Sik
    • Journal of Applied Reliability
    • /
    • v.13 no.4
    • /
    • pp.241-252
    • /
    • 2013
  • Because of financial and safety concerns, there are needs for more accurate prediction of bridge behavior. Underestimation of the bridge load carrying capacity can have serious economic consequences, as deficient bridges must be repaired or rehabilitated. Therefore, the knowledge of the actual bridge behavior under live load may lead to a more realistic calculation of the load carrying capacity and eventually this may allow for more bridges to remain in service with or without minor repairs. The presented research is focused on the reliability evaluation of the actual load carrying capacity of existing bridges based on the field testing. Seventeen existing bridges were tested under truck load to confirm their adequacy of reliability. The actual response of existing bridge structures under live load is measured. Reliability analysis is performed on the selected representative bridges designed in accordance with AASHTO codes for bridge component (girder). Bridges are first evaluated based on the code specified values and design resistance. However, after the field testing program, it is possible to apply the experimental results into the bridge reliability evaluation procedures. Therefore, the actual response of bridge structures, including unintentional composite action, partial fixity of supports, and contribution of nonstructural members are considered in the bridge reliability evaluation. The girder distribution factors obtained from the tests are also applied in the reliability calculation. The results indicate that the reliability indices of selected bridges can be significantly increased by reducing uncertainties without sacrificing the safety of structures, by including the result of field measurement data into calculation.

Prediction of Electric Power on Distribution Line Using Machine Learning and Actual Data Considering Distribution Plan (배전계획을 고려한 실데이터 및 기계학습 기반의 배전선로 부하예측 기법에 대한 연구)

  • Kim, Junhyuk;Lee, Byung-Sung
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.7 no.1
    • /
    • pp.171-177
    • /
    • 2021
  • In terms of distribution planning, accurate electric load prediction is one of the most important factors. The future load prediction has manually been performed by calculating the maximum electric load considering loads transfer/switching and multiplying it with the load increase rate. In here, the risk of human error is inherent and thus an automated maximum electric load forecasting system is required. Although there are many existing methods and techniques to predict future electric loads, such as regression analysis, many of them have limitations in reflecting the nonlinear characteristics of the electric load and the complexity due to Photovoltaics (PVs), Electric Vehicles (EVs), and etc. This study, therefore, proposes a method of predicting future electric loads on distribution lines by using Machine Learning (ML) method that can reflect the characteristics of these nonlinearities. In addition, predictive models were developed based on actual data collected at KEPCO's existing distribution lines and the adequacy of developed models was verified as well. Also, as the distribution planning has a direct bearing on the investment, and amount of investment has a direct bearing on the maximum electric load, various baseline such as maximum, lowest, median value that can assesses the adequacy and accuracy of proposed ML based electric load prediction methods were suggested.

Verification Experiment and Analysis for 6 kW Solar Water Heating System(Part 2 : Modelling and Simulation) (6 kW급 태양열 온수급탕 시스템의 실증실험 및 분석(제2보 모델링 및 시뮬레이션))

  • 최봉수;김진홍;강용태;홍희기
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.16 no.6
    • /
    • pp.556-565
    • /
    • 2004
  • We have experimented an actual solar water heating system acquiring real data for one year period. On the basis of the operation data, it is necessary to predict the system performance such as collector efficiency and solar fraction, and to analyze the economical efficiency for system optimal design. To estimate the performance of actual systems through simulation, valid modelling for components consisting of the system should be accompanied. The present study is focused on the modelling for load patterns and operating control conditions. We proposed two load models: concentration model which gathers real loads as a meaningful group and distribution model which disperses real loads with time. If grouping of the load distribution is suitable, the predicted values by the concentration model approaches to those by the distribution model close to actual load pattern apparently. As a result, both of them are in good agreement with those by experiment.

Compression strength performance of multi-layer glued columns by using square lumbers produced from domestic small diameter logs (국산 간벌 소경재를 이용한 다중접착접합 기둥부재의 압축강도성능)

  • Shin, Il-Joong;Kim, Yun-Hui;Jang, Sang-Sik
    • Korean Journal of Agricultural Science
    • /
    • v.38 no.3
    • /
    • pp.533-540
    • /
    • 2011
  • This study is to develop a mulit-layer glued columns for construction of Korean-style houses by using domestic small diameter logs. Dried small square lumber glued each other to develop a multi-layer glued columns and evaluated its performance of strength. Then, predicted the design load of multi-layer glued columns and make a comparison between actual load and design load of multi-layer glued columns. In the results, allowable load by allowable stress of multi-layer glued columns was measured one-third of actual columns load and prediction load was measured less than 10~30% of the actual load. Therefore, muilt-layer glued member has a standard allowable stress of compressive of 13 MPa (Larix leptolepis) and 19 MPa (Chamaecyparis obtusa) when used as columns. Also, using compression strength of small diameter square logs could calculate maximum loads of multi-layer glued member as column.

A Study on Daily Cooling Load Forecast Using Fuzzy Logic (퍼지 논리를 이용한 일일 냉방부하 예측에 관한 연구)

  • 신관우;이윤섭
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.8 no.11
    • /
    • pp.948-953
    • /
    • 2002
  • The electric power load during the peak time in summer is strongly affected by cooling load, which decreases the preparation ratio of electricity and brings about the failure in the supply of electricity in the electric power system. The ice-storage system and heat pump system are possible solutions to settle this problem. In this study. the method of estimating temperature and humidity to forecast the cooling load of ice-storage system is suggested, then the method of forecasting the cooling load using fuzzy logic is suggested by simulating that the cooling load is calculated using actual temperature and humidity. The forecast of the temperature, humidity and cooling load are simulated, and it is shown that the forecasted data approach to the actual data. Operating the ice-storage system by the forecast of cooling load with night electric power will improve the ice-storage system efficiency and reduce the peak electric power load during the summer season as a result.

Experimental Study of Load Characteristics of Buried and Exposed Large-Diameter Pipelines Using Fiber-Optic Strain Sensor

  • Chung, Joseph Chul;Lee, Michael Myung-Sub;Kang, Sung Ho
    • Journal of Ocean Engineering and Technology
    • /
    • v.34 no.3
    • /
    • pp.194-201
    • /
    • 2020
  • In this study, an optical-fiber sensor was used to measure loads that could act in an environment similar to the loading conditions that exist in an actual pipe. The structure and the installation method of the optical-fiber strain sensor were applied considering the actual large pipe and the buried pipe environment. Load tests were performed using a displacement sensor and sandbags to determine the deflection of the pipe according to the external load, and the linear measurement results were verified. Considering the conditions that could exist in the actual pipe, the test method was presented, and the strain of the buried pipe generated at this time was measured.

A study on the equivalent static wind load estimation of large span roofs (대스팬 지붕구조물의 등가정적 풍하중 산정에 관한 연구)

  • Kim, Dae-Young;Kim, Ji-Young;Kim, Han-Young;Lee, Myung-Ho;Kim, Sang-Dae
    • 한국공간정보시스템학회:학술대회논문집
    • /
    • 2004.05a
    • /
    • pp.245-251
    • /
    • 2004
  • This paper discuss the conditionally sampled actual wind pressure distributions causing peak quasi-static wind loads in the large span roofs using the wind pressures at many locations on dome models measured simultaneously in a wind tunnel. The actual extreme pressure distributions are compared itk load-response-correlation (LRC) method and the quasi-steady pressure distributions. Based on the results, the reason for the discrepancy in the LRC pressure distribution and the actual extreme pressure distribution are discussed. Futhermore, a brief discussion is made of the equivalent static wind load estimation for the large span roofs.

  • PDF

The Study on Cooling Load Forecast using Neural Networks (신경회로망을 이용한 냉방부하예측에 관한 연구)

  • 신관우;이윤섭
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.14 no.8
    • /
    • pp.626-633
    • /
    • 2002
  • The electric power load during the peak time in summer is strongly affected by cooling load, which decreases the preparation ratio of electricity and brings about the failure in the supply of electricity in the electric power system. The ice-storage system and heat pump system etc. are used to settle this problem. In this study, the method of estimating temperature and humidity to forecast the cooling load of ice storage system is suggested. And also the method of forecasting the cooling load using neural network is suggested. For the simulation, the cooling load is calculated using actual temperature and humidity, The forecast of the temperature, humidity and cooling load are simulated. As a result of the simulation, the forecasted data is approached to the actual data.