• Title/Summary/Keyword: Actual Construction Data

Search Result 734, Processing Time 0.024 seconds

Cost Estimating Method of Public Building Construction through Construction Scale (공사규모에 따른 공공건축물 공사비의 산정방법)

  • Yim, Jin-Ho;Park, Jun-Mo;Kim, Ok-Kyue
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.3
    • /
    • pp.307-316
    • /
    • 2015
  • As there are a lot of differences in the public building construction cost depending on the construction scale of actual construction cost system, a lot of problems occur in the estimation of the cost. So, the development of a predictive model depending on the construction scale shall be used in a way that it is applied to the case selectively and differently. This study drew a cost estimating model through a regression analysis. For this, 42 construction sites which were ordered during 2011 to 2012 by Public Procurement Service data were selected as a historical data. Based on the application of the model to new construction and the verification of its effect, the reasonable model for estimating the construction cost has been suggested.

Specialty Contractor's Role and Performance Analysis for Digital Fabrication - Focusing on the case of irregular podium construction - (디지털 패브리케이션 전문 건설업체 역할 및 성과 분석 - 비정형 포디움 시공 사례를 중심으로 -)

  • Ham, Nam-Hyuk;Ahn, Byung-Ju;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.8 no.1
    • /
    • pp.43-55
    • /
    • 2018
  • Recently, there have been increasing studies on the application of digital technology, which has its focus of the irregular building. However, most of these studies have not clarified the objective of the technology and the effectiveness of professional manpower on its performance. This study analyzes actual used technology and the role of specialty contractor. It presents a framework to quantify the performance of the specialty contractor. For these purposes, this paper presents a proposed method to evaluate the activities of specialty contractors using a queueing model. As an attempt to verify the model, an actual irregular building project, in which digital fabrication is applied, is investigated during the construction phase. In order to collect the digital fabrication data, digital fabrication reports and specialty contractor's work log of project are reviewed. In addition, Digital Fabrication input personnel, productivity data are collected through interviews with experts involving in the case project. Analysis of specialty contractor's performance in digital fabrication reveals that the wait status of project participants varies probabilistically depending on the digital technology application level. The results of this study are expected to contribute toward the improvement of the production level in the construction industry.

Analysis and survey of design decision making process in steel production process

  • Furukawa, Satoru;Yoshida, Tomohiro;Chi, Naiyuan;Okamoto, Hiroyuki;Furusaka, Shuzo
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.30-37
    • /
    • 2020
  • In the building construction, the steel-frame work occupies an important position in terms of structure, cost and quality. Especially in Japan, steel frames have traditionally been the main structure of many buildings. For steel-frame works in such positions, this paper investigates an existing steel fabricator to clarify the actual conditions of design decision making process and management method in steel production process. This study focuses on a steel fabricator (Company M in the following sentences), whose main market is Japan and which has facilities in Thailand, China, and Japan. Company M uses QR codes to control the production status of products, and exchanges all information between inside and outside the company via specialized departments in the form of documents. The authors have already analyzed the relationship between production lead time and defect rate based on actual project data at Architectural Institute of Japan in 2016. In 2019, we expressed the process from the confirmation of the design information of the current steel frame to the production by WBS, and clarified the relationship between the production lead time and steel frame product quality structurally. In this paper, the authors reoport the progress of the survey conducted so far, the positioning of the collected data, and the future survey policy.

  • PDF

Development of Loss Model Based on Quantitative Risk Analysis of Infrastructure Construction Project: Focusing on Bridge Construction Project (인프라건설 프로젝트 리스크 분석에 따른 손실 정량화 모델 개발 연구: 교량프로젝트를 중심으로)

  • Oh, Gyu-Ho;Ahn, Sungjin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.208-209
    • /
    • 2022
  • This study aims to analyze the risk factors caused by object damage and third-party damage loss in actual bridge construction based on past insurance premium payment data from major domestic insurers for bridge construction projects, and develop a quantitative loss prediction model. For the development of quantitative bridge construction loss model, the dependent variable was selected as the loss ratio, and the independent variable adopted 1) Technical factors: superstructure type, foundation type, construction method, and bridge length 2) Natural hazards: flood anf Typhoon, 3) Project information: total construction duration, total cost and ranking. Among the selected independent variables, superstructure type, construction method, and project period were shown to affect the ratio of bridge construction losses, while superstructure, foundation, flood and ranking were shown to affect the ratio of the third-party losses.

  • PDF

Construction Progress Measurement System by tracking the Work-done Performance (내역물량 측정에 의한 건설공사진도율 산정시스템)

  • Choi Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.3 s.15
    • /
    • pp.137-145
    • /
    • 2003
  • The project control system based on the actual values of three objects shall be operated continuously in a timely manner. For collecting/tracking accurate actual performance data, a reasonable basis of measuring work performance and its related measuring methods are needed. Therefore, this research proposes a method of developing and operating the construction progress measurement system. The problem of the conventional method is the difficulty to construct control accounts and to define the basis of measuring the performance of each control account. Therefore, this research proposes the preferable, formal methodology that produces the progress value of the smallest work unit by surveying the installed quantities and estimates percent complete of groups of works or entire project by earned value concept. This research in connection with the hereafter research of the weight value of control accounts will contribute to apply in practice and to develop the scientific construction management technique in the construction industry. Further researches how to trend and forecast the project using the measured progress value are recommended for putting the prosed system of this research to practical use.

An Analysis of Streambed Changes Downstream of Daecheong Dam

  • Seo, Hyeong-Deok;Jeong, Sang-Man;Kim, Lee-Hyung;Choi, Kyu-Ho
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.8 no.1
    • /
    • pp.103-108
    • /
    • 2008
  • Riverbed change is greatly influenced by artificial factors such as dam construction, gravel collection, and river improvement. This study simulated a long-term bed change based on the GSTARS3 model using actual data from the area downstream of the Geum River Daecheong Dam and compared the estimation with a section of the actual measurement. As a result, it was found that the section of the actual measurement was far lower than the result of the simulation in terms of long-term bed change. While the area downstream of Daecheong Dam displayed approximately an average of 2.29 m of streambed degradation on average while the upper stream area showed approximately 0.63 m of bed degradation over 24 years. In the simulation of the area downstream of Daecheong Dam based on the GSTARS3 model, similar bed degradation was observed. However, a great difference was detected between the result and the actual measurement. According to the cause analysis, the riverbed in the area downstream of Daecheong Dam has continuously degraded due to the dam construction and mass collection of gravel. The mass collection of gravel was the main cause of riverbed change. It was found that about 76% of all riverbed degradation was caused by the mass collection of gravel.

A Study on the Actual Condition and Effect of Dust Scattering in Construction Field (건설현장에서 발생하는 비산먼지의 실태 및 영향에 관한 연구)

  • Yu, Hee-Jong;Han, Kyeong-Yeon;Kwak, Kwang-Soo;Kim, Jae-Soo;Yang, Keek-Yeong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.4 no.4
    • /
    • pp.109-115
    • /
    • 2004
  • Dust scattering is one of the major problem for the residents living nearby construction field with construction noise and vibration. The dust scattering may inflict a considerable damage to psychological, spiritual discomfort to neighboring peoples. Therefore, the trouble of residents living nearby construction field have been increasing. Nevertheless, in our country, adequate guidelines for the dust scattering are not yet established because of the lack of basic data and insufficient research works. In this point, this study has researched its level of damage by conducting of the interview-survey which utilizing of questionnaire-paper asking for those staffs and workers to answer in the construction field, in order to grasp the damage extent of the actual condition effect and response against scattering dust in construction field. As the result, the occurring rate of dust scattering was appeared high compare with other constructing processes, due to utilization of construction equipment that operating at the fundamental basic construction stage, and it was turned out that presently the proper countermeasure and training against scattering dust in the construction site is insufficient. As for the solution mean against that, it is considered that with the better operation of construction site such as the installation of facilities for occurrence-restraint of dust scattering, frequent sprinkling of water, use of thermostat-covers, as well as those methods to be minimized of the occurrence of dust scattering must be contrived through the education for an attention how to use of construction equipment and training at the site.

Database Development For Efficient Construction Process Management Using Construction Simulation Technique and Bayesian Approach (건설 시뮬레이션과 베이시안 기법을 이용한 공정관리 데이터베이스 구축)

  • Ko, Yong-Ho;Park, Min-Ha;Han, SeungWoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.94-95
    • /
    • 2014
  • Construction industry has become higher, larger and more complicated. It has been analyzed that the process planning in the construction site has been made by the site engineer experience mostly and some were made based on historical data. However, such plans have been investigated that require numerous revisions during construction which means that the plans made through such methods are not reliable. Numerous studies in this field have been conducted trying to solve such problems developing methodologies to overcome such limitations. It has been analyzed that many studies have focused on suggesting prediction models only that cannot be used for both actual planning prior to construction and process monitoring during construction. Therefore, this study suggests a methodology that effectively manages construction productivity by applying simulation methodology combined with bayesian approach focusing on the high-rise curtain wall operations.

  • PDF

ORGANIC RELATIONSHIP BETWEEN LAWS BASED ON JUDICIAL PRECEDENTS USING TOPOLOGICAL DATA ANALYSIS

  • Kim, Seonghun;Jeong, Jaeheon
    • Korean Journal of Mathematics
    • /
    • v.29 no.4
    • /
    • pp.649-664
    • /
    • 2021
  • There have been numerous efforts to provide legal information to the general public easily. Most of the existing legal information services are based on keyword-oriented legal ontology. However, this keyword-oriented ontology construction has a sense of disparity from the relationship between the laws used together in actual cases. To solve this problem, it is necessary to study which laws are actually used together in various judicial precedents. However, this is difficult to implement with the existing methods used in computer science or law. In our study, we analyzed this by using topological data analysis, which has recently attracted attention very promisingly in the field of data analysis. In this paper, we applied the the Mapper algorithm, which is one of the topological data analysis techniques, to visualize the relationships that laws form organically in actual precedents.

Formwork System Selection Model for Tall Building Construction Using the Adaboost Algorithm

  • Shin, Yoon-Seok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.5
    • /
    • pp.523-529
    • /
    • 2011
  • In a tall building construction with reinforced concrete structures, the selection of an appropriate formwork system is a crucial factor for the success of the project. Thus, selecting an appropriate formwork system affects the entire construction duration and cost, as well as subsequent construction activities. However, in practice, the selection of an appropriate formwork system has depended mainly on the intuitive and subjective opinion of working level employees with restricted experience. Therefore, in this study, a formwork system selection model using the Adaboost algorithm is proposed to support the selection of a formwork system that is suitable for the construction site conditions. To validate the applicability of the proposed model, the selection models Adaboost and ANN were both applied to actual case data of tall building construction in Korea. The Adaboost model showed slightly better accuracy than that of the ANN model. The Adaboost model can assist engineers to determine the appropriate formwork system at the inception of future projects.