The purpose of Defense Acquisition Project is that the superior weapons validated needs and performance are supplied to military user with limited financial resources and time. The Warship Acquisition Project is not only like this, But also has special characteristics of long project period and first-constructed ship's operation employment. So, The Warship Acquisition Project need systematic and efficient procedure & management. And this paper researches System engineering application of imaginary WIG(Wing-In-Ground Effect) ship acquisition project based Systems Engineering Handbook ver.3.1 published by INCOSE, the lead of field. The Imaginary WIG(Wing-In-Ground Effect) ship acquisition project applied the four processes(technical project, Enterprise & Agreement, Enabling Systems), the basis of INCOSE Engineering Handbook ver.3.1, and the each process output compared with DAPA(Defense Acquisition Program Administration)'s warship acquisition procedure.
To Manage the Defense Acquisition Process more efficiently, DAPA has looked over the applying SE process to the Eagle Acquisition Program. Based on comparing 'Requirement' with 'items suggested in the proposal' in RFP and analyzing the result by using Cradle, those items have been discovered with IPT, actualized and corrected. In addition, the computerized data base system makes easier to trace all changed and more efficiency to manage programs. Therefore, this study using SE in other acquisition program.
This paper describes the application method of systems engineering for systems of systems and addressed the evolution in approach as organizations have evolved from standalone platform providers to architect of SoS. There is an increasing need to perform Systems of Systems Engineering(SoSE) in a global environment This has stimulated the development of new, innovative SoSE approaches that surpass current military and industry state-of-the-art systems engineering processes. The simple scaling of the former process was ineffective in dealing with global distributed large-scale integration efforts of network-centric systems of systems. A new SoSE process has been developed which is a significant breakthrough in the development of large complex systems and net-centric systems of systems. The SoSE process provides a complete, detailed and systematic development approach for military and civil SoS. In this point of view, this paper analyzes functionally the architecture framework, process and integrated verification & validation of SoSE. From results of this analysis, perspectives on the application of SoSE suitable for Korea aquisition environment are presented.
획득관리는 항상 대외 무역거래 당사자간의 절충교역에 있어서도 중요한데, 대형 프로젝트를 수행할 때는 반듯이 사전에 계획된 절차에 따라 즉 표준화된 규정에 따라 집행될 수 있도록 지속적으로 연구되어야 할 분야이다 본 논문에서는 개발 프로젝트를 수행함에 있어 획득관리 프로세스와 공급계획 프로세스와의 관계를 도식화하여 표현함으로서 프로젝트관리자는 물론이고 프로젝트에 참여하는 팀원들 간의 의사소통 수단 및 조정 통제 수단으로도 활용 될 수 있도록 하는데 연구목적 및 필요성을 두고 있다
Navy ship acquisition management business contributed to the korean Navy and defense exports with government suppliers in Korea for over 40 years. But due to advanced technology, development trend of Navy ship and defense export requirements, it enable to make a contribution to a better system improvement are being demanded. In this paper, an adjective Navy ship acquisition process is presented in order to improve the acquisition process takes the first step for acquisition planning process to enhance the efficiency and rationality that is based on consensus of Navy ship expert and experienced. In addition, systems engineering (SE) and quality control (QC) techniques based on Modeling and Simulation are investigated to carry out efficient project management and scientific quality control system in Navy ship acquisition process. Finally, it is suggested to apply SE/QC based on M&S for Navy ship acquisition process using civilian infrastructure and organizations in order to take advantage of the world's leading domestic industry based on considering the difficult conditions of Navy ship suppliers.
방위사업청은 방위력개선업무의 투명성, 효율성, 전문성을 제고하는 한편, 방산 경쟁력을 강화하기 위해 "통합사업관리정보체계" 구축 사업을 추진 중이다. 동 체계는 전사적개념으로 국방사업관리 전반에 BPM을 적용한 최초의 사례로서, 이의 적용을 통해 업무정보의 효율적인 공유, 신속한 업무처리, 효율적인 협업 및 의사소통이 기대된다. 본 논문에서는 "통합사업관리정보체계"에 BPM을 도입하는 과정을 소개하는 한편, 이를 통한 업무에 대한 면밀한 분석 및 통합, 업무 프로세스의 표준화 및 체계 구현 결과를 기술하고, 동 체계내 BPMS 구축과정에서 발생한 이론과 실제의 차이와 교훈, 발전방향을 도출한다.
To improve the naval ship acquisition process, systems engineering, modeling and simulation, etc. have been introduced, and there has been ongoing research on acquisition systems for effective support of it. However, due to characteristics of the naval ship acquisition process, development process mainly carried out at a shipyard such as basic design, detailed design, construction and test is difficult to integrate with the acquisition systems of IPT(Integrated Project Team). In addition, research aimed to improve this is rather lacking. In this paper, the naval ship product structure concept proposed in previous research was applied to the basic design system at shipyard, and basic research for expanding the coverage of naval ship acquisition systems to the basic design phase is performed. A data structure of modeling system appropriate to the basic design phase was proposed through research findings and the prototype system based on it was implemented.
The Core in Weapon system R&D is to realize the user required capabilities in limited schedule and cost. Therefore, the design of weapon system focuses to functional design for realization of requirement capabilities. However, the weapon system should not only basically bring the confidence to friendly forces bring fear to enemy forces to maximize the operational effectiveness of weapon systems and we consider the exterior design as the important factor to compete with foreign systems in international defense market besides capabilities and cost. For that reason, we made study case about the visual design decision process applied to the LVT(light tactical vehicle) project which was recent successful deployment among the many R&D projects of auto industry. Based on this case, this study suggests the necessity of the exterior design decision process the maneuver weapon system is developed.
Effect of single administration of Polygala tenuipolia was examined on short-term memory in step through test and the intensity of the immunoreactive c-Fos protein induced by oral administration of ethanol. The acquisition of memory was significantly reduced by ethanol, and ethanol amnesia was remarkably reversed following oral administration of Polygala tenuifolia. c-Fos protein in normal rat brain was highly expressed in order of thalamus, pariental cortex, hippocampus, hypothalamus, amygdaloid and cingulate cortex. The expression of Fos protein was remarkably suppressed by single administration of ethanol. The inhibitory effect of ethanol on expression of Fos protein was reversed by single administration of Polygara tenuipolia, especially tissues of limbic areas such as amygdala, parietal cortex and CA3 of hippocampus. These results suggested that the amelioration process of Polygala tenuipolia on ethanol amnesia seems to be involve the expression of c-Fos protein in partly.
Purpose: The present study offers merger and acquisition (M&A) strategy based on prior studies to assist the organizational practitioners in two companies' cultures. In the analysis, a M&A plan to guide the evolving principles was created by present authors using change management model. Research design, data, and methodology: The successful M&A integration is setting goals, reconfiguring the cultural systems to align them with business goals. The employees must be involved, particularly with organizational change. Both companies also ought to undertake employee training following the resolving of worries and needs of employees. Finally, restructuring can include the moving of employees from areas where they may be struggling. Result: Discussing and trying to come to an agreement over which mode of acculturation would be most suitable in that particular state is the main focus. Practitioners of both Company A and Company B might find it much simpler to continue their focus and dynamism in the process of cultural integration. Conclusions: We believe that our approach adds an insight in the M&A literature. Managers at all levels of both organizations must take part in the process of M&A for both organizational cultures to come in sync and for change to take place.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.