• Title/Summary/Keyword: Acquisition Project

Search Result 279, Processing Time 0.03 seconds

Experimental investigation of blocking mechanism for grouting in water-filled karst conduits

  • Zehua Bu;Zhenhao Xu;Dongdong Pan;Haiyan Li;Jie Liu;Zhaofeng Li
    • Geomechanics and Engineering
    • /
    • v.34 no.2
    • /
    • pp.155-171
    • /
    • 2023
  • Aiming at the grouting treatment of water inflow in karst conduits, a visualized experiment system for conduit-type grouting blocking was developed. Through the improved water supply system and grouting system, and the optimized multisource information monitoring system, the real-time observation of diffusion and deposition of slurry, and the data acquisition of pressure and velocity during the whole process of grouting were realized, which breaks through the problem that the monitoring element is easy to fail due to slurry adhesion in conventional test system. Based on the grouting experiments in static and flowing water, the diffusion and deposition behavior of the quick-setting slurry under different working conditions were analyzed. The temporal and spatial variation behavior of the pressure and velocity were studied, and the blocking mechanism of the grouting were further revealed. The results showed that: (1) Under the flowing water condition, the counter-flow diffusion distance of slurry was negatively correlated with the flow water velocity and the volume ratio of cement and sodium silicate (C-S ratio), and positively correlated with the grouting volume. The slurry deposition thickness was negatively correlated with the flowing water velocity, and positively correlated with the grouting volume and C-S ratio. (2) The pressure increased slowly before blocking of the flowing water and rapidly after blocking in karst conduits. (3) With the continuous progress of grouting, the flowing water velocity decreased slowly first, then significantly, and finally tended to be stable. According to the research results, some engineering recommendations were put forward for the grouting treatment of the conduit-type water inflow disaster, which has been successfully applied in the treatment project of the China Resources Cement (Pingnan) Limestone Mine. This study provided some guidance and reference for the parameter optimization of grouting for the treatment projects of water inflow in karst conduits.

BIM-based Lift Planning Workflow for On-site Assembly in Modular Construction Projects

  • Hu, Songbo;Fang, Yihai;Moehler, Robert
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.63-74
    • /
    • 2020
  • The assembly of modular construction requires a series of thoroughly-considered decisions for crane lifting including the crane model selection, crane location planning, and lift path planning. Traditionally, this decision-making process is empirical and time-consuming, requiring significant human inputs. Recently, research efforts have been dedicated to improving lift planning practices by leveraging cutting-edge technologies such as automated data acquisition, Building Information Modelling (BIM) and computational algorithms. It has been demonstrated that these technologies have advanced lift planning to some degree. However, the advancements tend to be fragmented and isolated. There are two hurdles prevented a systematic improvement of lift planning practices. First, the lack of formalized lift planning workflow, outlining the procedure and necessary information. Secondly, there is also an absence of a shared information environment, enabling storages, updates and the distribution of information to stakeholders in a timely manner. Thus, this paper aims to overcome the hurdles. The study starts with a literature review in combination with document analysis, enabling the initial workflow and information flow. These were contextualised through a series of interviews with Australian practitioners in the crane-related industry, and systematically analysed and schematically validated through an expert panel. Findings included formalized workflow and corresponding information exchanges in a traditional lift planning practice via a Business Process Model and Notation (BPMN). The traditional practice is thus reviewed to identify opportunities for further enhancements. Finally, a BIM-based lift planning workflow is proposed, which integrates the scattered technologies (e.g. BIM and computational algorithms) with the aim of supporting lift planning automation. The resulting framework is setting out procedures that need to be developed and the potential obstacles towards automated lift planning are identified.

  • PDF

Analysis of nursing doctoral dissertation formats over a decade: A comparative research between traditional and publication format at a university (간호학 박사학위논문 제도의 출판 형식 도입 10년 현황 분석: 일 대학 학위과정의 전통 형식과 출판 형식의 비교)

  • Choi, Subin;Park, Jee-Eun;Woo, Kyungmi
    • The Journal of Korean Academic Society of Nursing Education
    • /
    • v.30 no.2
    • /
    • pp.101-112
    • /
    • 2024
  • Purpose: The study aimed to examine doctoral students' degree acquisition paths and postgraduate research achievements and explore whether there are differences in the research achievements of doctoral degree holders in relation to the dissertation format. Methods: This study is a retrospective cohort study of nursing doctoral graduates whose degree conferral dates were between August 2013 and August 2023 that compared two dissertation tracks: traditional and publication. We evaluated the proportion of graduates in each track, publication of their dissertations, time to graduation, and the number of peer-reviewed journal publications after graduation. Results: Of the sample, 160 (87.4%) graduated in the traditional track, with only 56 (35.0%) of them publishing their dissertations after graduation. Excluding dissertations, 114 of the graduates (71.3%) published first-authored articles in the traditional track, while 12 (52.2%) did so in the publication track. The time to graduation was significantly shorter in the traditional track, with an average of 5.47±2.45 years, compared to 6.61±2.57 years in the publication track (z=2.26, p=.023). In the traditional track, 64 of graduates (40.0%) majored in adult health nursing, whereas in the publication track, 8 (34.8%) studied community health nursing. Conclusion: This study emphasizes the significance of the publication track for nursing doctoral dissertations in terms of research dissemination. Despite its numerous advantages, it is not yet the preferred choice for both students and faculty. Maintaining the publication track as an additional graduation option is worthwhile, as it allows students to gain research publishing experience before graduation and to effectively disseminate scientific findings in nursing.

A Study of the Influencing Factors for Decision Making on Construction Contract Types : Focused on DoD Construction Acquisitions with Firm Fixed Price and Cost Reimbursable in FAR (건설공사 대가지급방식의 의사결정 영향요인에 관한 연구 - 미국 연방조달규정에 따른 미국 국방성의 정액계약과 실비정산계약을 중심으로 -)

  • Son, Young-Hoon;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.2
    • /
    • pp.23-35
    • /
    • 2024
  • This study analyzed the correlation between each of the 12 influencing factors in FAR 16.04 and the decision-making process for construction contract types, using data from a total of 2,406 DoD Construction Acquisitions spanning from 2008 to 2022. The study considered 12 independent variables, grouped into 4 Characteristics with 3 factors each. Meanwhile, all other contract types were categorized into two types: Firm-Fixed-Price (FFP) and Cost-Reimbursement Contract (CRC), which served as the dependent variables. The findings revealed that FFP contracts significantly dominated in terms of acquisition volume. In line with prevailing beliefs, logistic data analysis and Analytical Hierarchy Process (AHP) analysis of Relative Weights from Experts' Survey demonstrated that independent variables like Uncertainty of the Scope of Work and Complexity found out to be increasing the likelihood of selecting CRC. The number of contractors in the market does indeed influence the possibilities of contract decision-making between CRC and FFP. Meanwhile, the p-values of the top 3 influencing factors on CRC from the AHP analysis-namely, Appropriateness of CAS, Project Urgency, and Cost Analysis-exceeded 0.05 in the binominal regression results, rendering it inconclusive whether they significantly influenced the construction contract type decision, particularly with respect to payment methods. This outcome partly results from the fact that a majority of respondents possessed specific experiences related to the USFK relocation project. Furthermore, influencing factors in construction projects behave differently than common beliefs suggest. As a result, it is imperative to consider the 12 influencing factors categorized into 4 Characteristics areas before establishing acquisition strategies for targeted construction projects.

CAS 500-1/2 Image Utilization Technology and System Development: Achievement and Contribution (국토위성정보 활용기술 및 운영시스템 개발: 성과 및 의의)

  • Yoon, Sung-Joo;Son, Jonghwan;Park, Hyeongjun;Seo, Junghoon;Lee, Yoojin;Ban, Seunghwan;Choi, Jae-Seung;Kim, Byung-Guk;Lee, Hyun jik;Lee, Kyu-sung;Kweon, Ki-Eok;Lee, Kye-Dong;Jung, Hyung-sup;Choung, Yun-Jae;Choi, Hyun;Koo, Daesung;Choi, Myungjin;Shin, Yunsoo;Choi, Jaewan;Eo, Yang-Dam;Jeong, Jong-chul;Han, Youkyung;Oh, Jaehong;Rhee, Sooahm;Chang, Eunmi;Kim, Taejung
    • Korean Journal of Remote Sensing
    • /
    • v.36 no.5_2
    • /
    • pp.867-879
    • /
    • 2020
  • As the era of space technology utilization is approaching, the launch of CAS (Compact Advanced Satellite) 500-1/2 satellites is scheduled during 2021 for acquisition of high-resolution images. Accordingly, the increase of image usability and processing efficiency has been emphasized as key design concepts of the CAS 500-1/2 ground station. In this regard, "CAS 500-1/2 Image Acquisition and Utilization Technology Development" project has been carried out to develop core technologies and processing systems for CAS 500-1/2 data collecting, processing, managing and distributing. In this paper, we introduce the results of the above project. We developed an operation system to generate precision images automatically with GCP (Ground Control Point) chip DB (Database) and DEM (Digital Elevation Model) DB over the entire Korean peninsula. We also developed the system to produce ortho-rectified images indexed to 1:5,000 map grids, and hence set a foundation for ARD (Analysis Ready Data)system. In addition, we linked various application software to the operation system and systematically produce mosaic images, DSM (Digital Surface Model)/DTM (Digital Terrain Model), spatial feature thematic map, and change detection thematic map. The major contribution of the developed system and technologies includes that precision images are to be automatically generated using GCP chip DB for the first time in Korea and the various utilization product technologies incorporated into the operation system of a satellite ground station. The developed operation system has been installed on Korea Land Observation Satellite Information Center of the NGII (National Geographic Information Institute). We expect the system to contribute greatly to the center's work and provide a standard for future ground station systems of earth observation satellites.

The Acquisition, Construction and Common Use of Modern and Post-modern Document DB in the NAK, NIKH, and AKS (근·현대 지역사료 수집, DB 구축 및 공동 활용 - 국가기록원, 국사편찬위원회, 한국학중앙연구원을 중심으로 -)

  • Kang, Soon-Ae
    • Journal of Korean Society of Archives and Records Management
    • /
    • v.8 no.2
    • /
    • pp.39-60
    • /
    • 2008
  • This paper deals with the four aspects of the acquisition, construction and common use of modern and post-modern document DB in the NAK, NIKH, and AKS. First, The concept of Korean regional history includes provincial history, local history and regional history and as far as modern and post-modern history is concerned, the concept of regional history is on expansion. Second, National Archives of Korea has been systematically collecting and managing modern and post-modern regional history records in compliance to Public Institutes Records Management Law, enacted in 1999 and currently is in charge of handling public records of 373 central government administration offices, 514 regional government offices, Office of Education, universities and of other public agencies. National Institute of Korean History is working on a ten year project from 2004 to collect the scattered modern and post-modern regional history records and to classify them regionally and thematically. The Academy of Korean Studies has been collecting modern and post-modern regional history records and collection was initiated by Modern History Research. Those records that are collected from 1997 and 2005 are mainly from the liberation period. Third, characteristics of Central Archives Management System and Nara Records Portal System of NAK, Korean History Database System of NIKH and of The AKS' Korean Provincial Culture Electronic Encyclopedia are elaborated. Fourth, establishing 'Modern and Post-modern Regional History Records Council' as an affiliated organization of National Archives Management Committee is recommended, NAK leading the council and promoting further cooperation. In this section, an emphasis on allotted tasks of three institutes in order to achieve technology development for digitalized resource sharing, to improve on contents and to promote public and international use is placed as well.

Robust Maneuvering Target Tracking Applying the Concept of Multiple Model Filter and the Fusion of Multi-Sensor (다중센서 융합 및 다수모델 필터 개념을 적용한 강인한 기동물체 추적)

  • Hyun, Dae-Hwan;Yoon, Hee-Byung
    • Journal of Intelligence and Information Systems
    • /
    • v.15 no.1
    • /
    • pp.51-64
    • /
    • 2009
  • A location tracking sensor such as GPS, INS, Radar, and optical equipments is used in tracking Maneuvering Targets with a multi-sensor, and such systems are used to track, detect, and control UAV, guided missile, and spaceship. Until now, Most of the studies related to tracking Maneuvering Targets are on fusing multiple Radars, or adding a supplementary sensor to INS and GPS. However, A study is required to change the degree of application in fusions since the system property and error property are different from sensors. In this paper, we perform the error analysis of the sensor properties by adding a ground radar to GPS and INS for improving the tracking performance by multi-sensor fusion, and suggest the tracking algorithm that improves the precision and stability by changing the sensor probability of each sensor according to the error. For evaluation, we extract the altitude values in a simulation for the trajectory of UAV and apply the suggested algorithm to carry out the performance analysis. In this study, we change the weight of the evaluated values according to the degree of error between the navigation information of each sensor to improve the precision of navigation information, and made it possible to have a strong tracking which is not affected by external purposed environmental change and disturbance.

  • PDF

Study on Improving the R&D Information Acquisition Process - Unified Information Collection Process using NTIS (조사·분석정보와 국가R&D표준정보 수집체계 일원화에 따른 국가R&D정보 수집 체계 개선에 관한 연구)

  • Kwon, Lee-nam;Kim, Tae-hyun;Kim, Yun-jeong;Choi, Hee-seok;Kim, Jae-soo;Kim, Young-kuk
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2009.05a
    • /
    • pp.300-305
    • /
    • 2009
  • The national R&D information from the previous year is collected annually for the evaluation and analysis process and is used for policy making and other related purpose. A total of 83 types of information, including the researcher information and the outcome information, was collected through the evaluation and analysis system. The demand for a real-time interaction of the national R&D information has increased with the use of NTIS as well as the need for increase in the number of information collected. The need to centralize the input system has also risen with the use of the system that utilizes the collected information in various other ways than just the information evaluation and analysis. There is an overall need to make the collection process of the national R&D information more effective. In this study, the method for collecting the evaluation and analysis information online is compared with the real-time collection method of the national R&D information before explaining the considerations that need to be made to effectively link the legacy systems owned by the project management institutes with NTIS.

  • PDF

On-Land Seismic Survey of Korea (한국의 육상 탄성파탐사)

  • Kwon, Byung-Doo
    • Economic and Environmental Geology
    • /
    • v.39 no.4 s.179
    • /
    • pp.441-450
    • /
    • 2006
  • The on-land seismic survey in Korea was begun in mid-1960s. Kim et al.(1967) of Korea Geological Survey reported on the result of gravity and seismic reflection surveys conducted in the Pohang area for the period of 1963-64 to assess its possibility of oil entrapment. Hyun and Kim (1966) carried out a refraction survey on the tunnel wall. Since then, the KGS geophysicists had conducted seismic surveys on Kyungsang sedimentary basin as a main project for several years. In 1970s, on-land seismic surveys had been conducted for various purposes such as site investigation for the nuclear power plants and industrial complex, exploration for ground water, mineral resources and underground tunnel. The first reflection survey with CMP acquisition was attempted in 1978 by using a digital recording system. But most of on-land seismic surveys had employed the refraction method until 1980s. In 1990s, high resolution reflection and various borehole seismic surveys such as tomography, uphole, downhole, cross-hole methods have been attempted by universities and engineering companies. The applications of on-land seismic surveys have been enlarged for both academic and industrial purposes such as investigation of geologic structure of the fault and tidal flat area, construction of highway, railroad and dam, geothermal energy and mineral resource exploration, environmental assessment for waste disposal sites and archaeological investigations. In 2002, the first crustal seismic survey was carried out on the profile of 294km length across the whole peninsular. It is expected that the advanced technology and experience acquired through offshore seismic surveys, which have been conducted in continental shelf of Korea and foreign oil fields, will stimulate the more active on-land seismic explorations.

The necessity of land banking for urban regeneration projects : A case of land banking agency in France (도시재생사업을 위한 토지비축의 필요성 : 프랑스 토지비축기관을 사례로)

  • Kim, Ryoonhee;Kim, Mi-Suk;Lee, Seong-Keun
    • Land and Housing Review
    • /
    • v.9 no.2
    • /
    • pp.9-19
    • /
    • 2018
  • The purpose of the study is to show the possibility of the enlargement of land banking types through employment of the French land bank case. For sustainable urban regeneration projects, it is necessary to improve the land banking system with comprehensive land banking types. There are a total of 35 land banking agencies in France, which are made according to the needs of the municipality. The main function of these institutions is to perform functions such as land acquisition, management, division, land maintenance(decontamination, etc.), land use plan review and so on. In the 1960s and 1970s, mainly purchase and maintenance of land mainly focused on Brownfield and idle land, but since 2000 the land purchase business is mainly for the supply of social rental housing which is missing It was. The use of land banks is most frequently mentioned as a way of how to supply land at a low price in urban renewal projects. To that end, it is necessary to revise related laws, even if the law is revised so that land for urban regeneration projects can be secured, due to the limit of financial resources, land for the urban regeneration project nationwide secured It will not be easy without policy judgment of a positive nation. Therefore, securing land reserve resources for urban regeneration projects utilizing residential district funds and municipal maintenance funds is essential. In addition, even on a small scale, it is necessary to consider the banking of land for regional capitalization at the local government level.