• Title/Summary/Keyword: AHP방법

Search Result 829, Processing Time 0.024 seconds

Setting Priorities on Standardization Work Items of IPv6 Multi-networking Using Analytical Hierarchy Process (계층분석방법을 이용한 IPv6 멀티네트워킹 표준화항목 우선순위 결정)

  • Woo, Hoon-Shik
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.34 no.1
    • /
    • pp.25-32
    • /
    • 2011
  • Under limited resources such as budgets and experts, it is essential to set promotion priorities for standardization work items on IPv6 (Internet Protocol version 6) multi-networking technologies. Opinions of domain experts are surveyed and analyzed utilizing a multi-criteria decision making tool, the Analytic Hierarchy Process (AHP). Weights of ten evaluation criteria are identified and applied to calculating importance degree of eight work items. According to descending order of importance degree, priorities of work items are determined. The processes and results of this study may provide not only an approach of setting promotion priorities for standardization work items but also a practical guide of implementing of a multi-criteria decision analysis.

A Material Handling Performance Evaluation Model for Cellular Manufacturing System of Based on Multi-Attributes Analysis Method (다 속성분석방법을 이용한 제조물류시스템의 성능산정모델)

  • 황홍석
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2000.10a
    • /
    • pp.167-170
    • /
    • 2000
  • This paper is concerned with development of a performance evaluation model for material handling system in cellular manufacturing system based on multi-attributes analysis method. We used the AHP(analytic hierarchy process) and fuzzy set ranking methodologies to overcome the special decision problems; those of multi -objective, multi-criterion, and multi-attributes. We proposed a 3-step approaches and we developed a systemic and practical computer program to solve the problems in the proposed methods. Computational experiments are then performed to cellular manufacturing system and show the effectiveness of the proposed model.

  • PDF

A Selection Method for Capital Budgeting Projects with Quality Function Deployment (품질기능전개를 이용한 자본예산투자프로젝트 선정방법)

  • 우태희
    • Journal of the Korea Safety Management & Science
    • /
    • v.2 no.4
    • /
    • pp.125-138
    • /
    • 2000
  • The purpose of this paper is to describe a new analytic method of capital budgeting projects that takes into account both customer wants and competitor's status and to give decision makers a tool for goal setting and planning for technology. This model, which is based on quality function deployment(QFD), has used the analytic hierarchy process(AHP) to determine the intensity of the relationship between the variables involved in each matrix of the model and the 0-1 integer programming to determine the allocation of funds to various technological projects. This paper also proposes how to calculate the new weight of columns to consider various strength levels of roof matrix, representing the correlation among the quality characteristics, using Lyman's normalization procedure. To compare this model with Partovi's model, I adapt the same example which is suggested by Partovi and I show that the value of object function, has maximization problem, in this model is larger than that in Partovi's model.

  • PDF

Measurement of Service Quality Using Fuzzy Set Theory and Analytic Hierarchy Process (Fuzzy Set Theory와 Analytic Hierarchy Process를 이용한 서비스품질 측정)

  • Lee, Hoe-Sik;Yoo, Choon-Burn;Choi, Yong-Jung;Jung, Hae-Jun;Kim, Yu-Ra
    • Proceedings of the Korean Society for Quality Management Conference
    • /
    • 2006.11a
    • /
    • pp.236-242
    • /
    • 2006
  • 세계적으로 각 분야에서 SERVQUAL 모형과 SERVPERF 모형 등을 이용한 서비스품질에 대한 측정과 관련된 연구들이 많이 수행되어 오고 있지만 서비스품질을 계량화시키기 위한 연구는 활성화되고 있지 못하는 상황이다. 따라서, 본 연구의 목적은 불확실하고 주관적인 환경에서 서비스품질을 객관성있게 측정하고 계량화시키기 위해서 L.A. Zadeh가 제안한 퍼지이론의 Triangular Fuzzy Number(TFN) 와 T.L. Saaty가 제안한 Analytic Hierarchy Process (AHP)를 이용하여 서비스품질을 측정하기 위한 방법을 제안하는 것이고, 본 연구를 통해서 조직의 제한적 자원으로 고객만족 극대화를 실현하기 위한 경쟁우위적 전략의 일환으로써 서비스품질을 제고시키는데 효율적이며 효과적인 의사결정안이 도출될 것으로 사료된다.

  • PDF

Application of An Analytical Hierarchy Process to Set Priorities on Standardization Work Items of Next Generation Internet Protocol Television (차세대 IPTV 표준화 항목 우선순위 결정을 위한 계층분석방법 응용)

  • Woo, Hoon-Shik
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.33 no.3
    • /
    • pp.192-198
    • /
    • 2010
  • To maximize effectiveness of standardization activities, it is essential to set priorities for determined standardization work items in the next generation internet protocol television (NG-IPTV) technologies. In this study, the analytic hierarchy process(AHP) is employed and applied to ranking of NG-IPTV standardization work items as a multi-criteria decision making tool which involves comprehensive surveys. Survey results are analyzed and we identified a useful three level segmentation of standardization strategic plan which shows standardization work item priorities.

A Study on the Selection of Remodeling Method by User's Request Analysis -Focused on Apartment House- (사용자 요구분석을 통한 리모델링방법 선정에 관한 연구 -공동주택을 중심으로-)

  • Yoon, Yer-Wan;Park, Do-Kyong;Yang, Keek-Young
    • Journal of the Korea Institute of Building Construction
    • /
    • v.4 no.2
    • /
    • pp.119-128
    • /
    • 2004
  • Lately construction industry tends to prefer remodeling of existing buildings rather than new construction or reconstruction of buildings due to strengthening of several restriction related to real estates along with prolonged depression. And also, remodeling of building costs less and creates less wastes compared to reconstruction and so it is more profitable in financial and environmental view. However remodeling is process of creating new environment with existing building. Therefor remodeling must follow the procedure realizing problem and fix the problem based on through investigation on existing building and users requirement must be faithfully reflected. Specially in case of apartment houses, since vagueness on ownership and management authority on common parts exists. Hereupon, in this study we are to present the procedure of analyzing apartment house remodeling method through user requirement by approaching to several considerable factors in user request side.

A Selection Method for Capital Budgeting Projects with Quality Function Deployment (품질기능전개를 이용한 자본투자프로젝트 선정방법)

  • 우태희
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2000.11a
    • /
    • pp.81-85
    • /
    • 2000
  • The purpose of this paper is to describe a new analytic method of capital budgeting projects that takes into account both customer wants and competitor's status and to give decision makers a tool for goal setting and planning for technology. This model, which is based on quality function deployment(QFD), has used the analytic hierarchy process(AHP) to determine the intensity of the relationship between the variables involved in each matrix of the model and the 0-1 integer programming to determine the allocation of funds to various technological projects. This paper also proposes how to calculate the new weight of columns to consider various strength levels of roof matrix, representing the correlation among the quality characteristics, using Lymsn's normalization procedure. To compare this model with Partovi's model, 1 adapt the same example which is suggested by Partovi and I show that the value of object function, has maximization problem, in this model is larger than that in Partovi's model.

  • PDF

A study on the Plan for Enhancing Internal Customer Satisfaction for Hybrid Weight (혼합 가중치를 고려한 내부고객만족 향상 방법에 관한 연구)

  • Kim, Chang-Soo;Lee, Mun-Kyo;Lim, Sung-Uk
    • Journal of the Korea Safety Management & Science
    • /
    • v.9 no.6
    • /
    • pp.205-214
    • /
    • 2007
  • Nowadays the customer is classified with external customers and the inside customers. Which are not only end users who consume products but also all people who contribute to their earnings through the management activity of the enterprise. Furthermore, the fact that the external customer satisfaction index and inside customer satisfaction index are closely related is supported by many researches. It is interpreted if the inside customer satisfaction is not improved, achievement of the external customer satisfaction cannot be easy. In this paper, First, we will deduce the inefficient index through DEA model in each department after setting up the weight of items of inside customer satisfaction and measuring them. Second, as well as research entire models about improvement methods of inside customer satisfaction getting improvement methods for reaching a goal in the minimum amount of efforts.

An Analysis on the Impact of New Route for Multimodal Transport Routes (복합운송경로상에서 신규경로가 미치는 영향에 관한 연구)

  • Kim, Hwan-Seong;Ganbat, Enkhtsetseg;Kim, Eun-Ji
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2015.10a
    • /
    • pp.239-240
    • /
    • 2015
  • This study aims to clarify current situation of transportation flow and determine to demand forecasting in new route between Korea and Mongolia. By follows the mongolia government information, there will be open 5 new routes in nearest 10 years. Thus, this study purpose is determining the efficiency way by consider time and cost factors for new route between Korea and Mongolia.

  • PDF

Quantitively deducing basic method of construction schedule risk (공정리스크의 정량적 도출을 위한 기초적 방법)

  • Ryu, Han-Guk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.90-91
    • /
    • 2014
  • Previous research related to the construction schedule management has focused on construction schedule categorization, construction schedule management, and system development to manage construction schedule risks. Therefore this research present quantitively deducing method for managing construction schedule risk. Based on the investigation, this study suggested the probable risk factors and a practical management method, through interviews and discussions with experts. The quantified risks should be adapted for an individually specific projects and managed until the project is complete. To maintain the continuity of schedule risks, the schedule risk management procedures should be controlled during the performance of the construction project.

  • PDF